Directive 2004/107/EC of the European Parliament and of the Council of 15 December 2004 relating to arsenic, cadmium, mercury, nickel and polycyclic aromatic hydrocarbons in ambient air
Print Options
PrintThe Whole
Directive
PrintThe Whole
Annex
PrintThe Whole
Division
PrintThis
Division
only
Changes over time for:
Llinell Amser Newidiadau
Mae’r llinell amser yma yn dangos y fersiynau gwahanol a gymerwyd o EUR-Lex yn ogystal ag unrhyw fersiynau dilynol a grëwyd ar ôl y diwrnod ymadael o ganlyniad i newidiadau a wnaed gan ddeddfwriaeth y Deyrnas Unedig.
Cymerir dyddiadau fersiynau’r UE o ddyddiadau’r dogfennau ar EUR-Lex ac efallai na fyddant yn cyfateb â’r adeg pan ddaeth y newidiadau i rym ar gyfer y ddogfen.
Ar gyfer unrhyw fersiynau a grëwyd ar ôl y diwrnod ymadael o ganlyniad i newidiadau a wnaed gan ddeddfwriaeth y Deyrnas Unedig, bydd y dyddiad yn cyd-fynd â’r dyddiad cynharaf y daeth y newid (e.e. ychwanegiad, diddymiad neu gyfnewidiad) a weithredwyd i rym. Am ragor o wybodaeth gweler ein canllaw i ddeddfwriaeth ddiwygiedig ar Ddeall Deddfwriaeth.
Status:
EU Directives are published on this site to aid cross referencing from UK legislation. Since IP completion day (31 December 2020 11.00 p.m.) no amendments have been applied to this version.
The sites of sampling points should be selected in such a way as to:U.K.
provide data on the areas within zones and agglomerations where the population is likely to be directly or indirectly exposed to the highest concentrations averaged over a calendar year;
provide data on levels in other areas within zones and agglomerations which are representative of the exposure of the general population;
provide data on deposition rates representing the indirect exposure of the population through the food chain.
Sampling points should in general be sited so as to avoid measuring very small micro-environments in their immediate vicinity. As a guideline, a sampling point should be representative of air quality in surrounding areas of no less than 200 m2 at traffic-orientated sites, at least 250 m × 250 m at industrial sites, where feasible, and several square kilometres at urban-background sites.
Where the objective is to assess background levels the sampling site should not be influenced by agglomerations or industrial sites in its vicinity, i.e. sites closer than a few kilometres.
Where contributions from industrial sources are to be assessed, at least one sampling point shall be installed downwind of the source in the nearest residential area. Where the background concentration is not known, an additional sampling point shall be situated within the main wind direction. In particular where Article 3(3) applies, the sampling points should be sited such that the application of BAT can be monitored.
Sampling points should also, where possible, be representative of similar locations not in their immediate vicinity. Where appropriate they should be co-located with sampling points for PM10.
Yn ôl i’r brig