Chwilio Deddfwriaeth

Reservoirs Act 1975

 Help about what version

Pa Fersiwn

 Help about advanced features

Nodweddion Uwch

Changes to legislation:

Reservoirs Act 1975, Section 6 is up to date with all changes known to be in force on or before 10 June 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to the whole Act associated Parts and Chapters:

Whole provisions yet to be inserted into this Act (including any effects on those provisions):

[F16Construction or enlargement of reservoirs. E+W+S

(1)No large raised reservoir shall be constructed (whether as a new reservoir or by the alteration of an [F2existing structure or area] that is not a large raised reservoir) or shall be altered so as to increase [F3or decrease] its capacity, unless a qualified civil engineer (“the construction engineer”) is employed to design and supervise the construction or alteration; and where the use of a reservoir as a reservoir has been abandoned, and the reservoir is to be brought back into use after being altered so as to increase [F3or decrease] its capacity, that shall be treated for purposes of this Act as the construction of a new reservoir.

(2)Where a large raised reservoir is constructed as a new reservoir, it shall not be used for the storage of water, or be filled wholly or partially with water, otherwise than in accordance with the certificate of the construction engineer responsible for its construction (or, in the event of any alteration to it, in accordance with subsection (4) below).

(3)Where a large raised reservoir is constructed by the alteration of an [F4existing structure or area] that is not a large raised reservoir, the F5... reservoir shall not be used for the storage of water, or be filled wholly or partially with water, otherwise than in accordance with the certificate of the construction engineer responsible for the construction of the reservoir (or, in the event of any alteration to it, in accordance with subsection (4) below).

(4)Where a large raised reservoir is altered so as to increase [F6or decrease] its capacity, then from the time when the construction engineer responsible for the alteration gives any certificate for the reservoir, the reservoir shall not be used for the storage of water, or be filled wholly or partially with water, otherwise than in accordance with the certificate of that construction engineer (or, in the event of any further alteration to it, in accordance with this subsection as it applies on that alteration).

(5)Where the construction or alteration of a reservoir is by this section required to be supervised by a construction engineer, the reservoir shall be under the supervision of the construction engineer until he gives his final certificate for the reservoir.

(6)F7...

[F8(6A)This section and sections 7 and 8 do not apply in relation to alterations, or proposed alterations, to decrease the capacity of a large raised reservoir so that it is incapable of holding 10,000 cubic metres of water above the natural level of any part of the surrounding land (in which case section 13 applies instead).

(6B)The Minister may by order substitute a different volume of water for the volume specified in subsection (6A).]]

Textual Amendments

F2Words in s. 6(1) substituted (30.7.2013 for E., 1.4.2016 for W.) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 3(2) (with s. 49(1)(6)); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

F3Words in s. 6(1) inserted (1.10.2011 for specified purposes, 30.7.2013 for E. so far as not already in force, 1.4.2016 for W. in so far as not already in force) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 10(2) (with s. 49(1)(6)); S.I. 2011/2204, art. 3(1)(e); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

F4Words in s. 6(3) substituted (30.7.2013 for E., 1.4.2016 for W.) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 3(3) (with s. 49(1)(6)); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

F5Words in s. 6(3) omitted (1.10.2011 for specified purposes, 30.7.2013 for E. so far as not already in force, 1.4.2016 for W. in so far as not already in force) by virtue of Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 10(3) (with s. 49(1)(6)); S.I. 2011/2204, art. 3(1)(e); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

F6Words in s. 6(4) inserted (1.10.2011 for specified purposes, 30.7.2013 for E. so far as not already in force, 1.4.2016 for W. in so far as not already in force) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 10(4) (with s. 49(1)(6)); S.I. 2011/2204, art. 3(1)(e); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

F7S. 6(6) omitted (1.10.2011 for specified purposes, 30.7.2013 for E. so far as not already in force, 1.4.2016 for W. in so far as not already in force) by virtue of Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 10(5) (with s. 49(1)(6)); S.I. 2011/2204, art. 3(1)(e); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

F8S. 6(6A)(6B) added (1.10.2011 for specified purposes, 30.7.2013 for E. so far as not already in force, 1.4.2016 for W. in so far as not already in force) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 10(6) (with s. 49(1)(6)); S.I. 2011/2204, art. 3(1)(e); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

Modifications etc. (not altering text)

C1Ss. 6–10 modified by S.I. 1986/466, art. 2(2), Sch. 1

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill