Print Options
PrintThe Whole
Act
PrintThe Whole
Part
PrintThe Whole
Chapter
PrintThis
Cross Heading
only
Changes over time for: Cross Heading: Sustainable drainage
Llinell Amser Newidiadau
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Status:
Point in time view as at 15/12/2017.
Changes to legislation:
Water Act 2014, Cross Heading: Sustainable drainage is up to date with all changes known to be in force on or before 11 November 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations.
Changes to Legislation
Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.
Sustainable drainageE+W
21Drainage systems relieving public sewersE+W
(1)After section 114 of the Water Industry Act 1991 there is inserted—
“Sustainable drainageE+W
114ADrainage systems relieving public sewers
(1)Sewerage undertakers may construct, on their own or on another's land, drainage systems for the purpose of reducing the volume of surface water entering public sewers or the rate at which it does so.
(2)A sewerage undertaker may maintain and operate a drainage system constructed by it under subsection (1).
(3)In this section—
“drainage system” means a structure designed to receive rainwater and other surface water, other than a natural watercourse;
“natural watercourse” means a river or stream;
“rainwater” includes snow and other precipitation;
“structure” includes—
(a)
any part of an existing or proposed structure, and
(b)
any feature or aspect of a design that is intended to receive or facilitate the receipt of rainwater or other surface water.
(4)The powers conferred by subsections (1) and (2) are not to be regarded as functions of a sewerage undertaker for the purposes of section 155 (compulsory purchase of land required for the purposes of carrying out functions of relevant undertakers).”
(2)In section 158 of that Act (powers to lay pipes in streets), in subsection (7) (meaning of reference to a relevant pipe), in paragraph (b)—
(a)omit the “or” at the end of both sub-paragraphs (i) and (ii);
(b)after sub-paragraph (iii) there is inserted “or
(iv)any pipe forming part of, or required in connection with, a drainage system constructed under section 114A.”
(3)In Schedule 3 to the Flood and Water Management Act 2010 (sustainable drainage), after paragraph 19 there is inserted—
“Exception 3: systems under section 114A Water Industry Act 199119AThe adoption duty does not apply to a drainage system constructed under section 114A of the Water Industry Act 1991 (drainage systems relieving public sewers).”
Yn ôl i’r brig