F1ANNEX II

Annotations:

2.REQUIREMENTS FOR CHECKING BATCHES OF PREPACKAGES

2.1.Prepackage batches

2.1.1.

The batch shall comprise all the prepackages of the same nominal quantity, the same type and the same production run, packed in the same place, which are to be inspected. The batch size shall be limited to the amounts laid down below.