F1ANNEX II

Annotations:

2.REQUIREMENTS FOR CHECKING BATCHES OF PREPACKAGES

2.1.Prepackage batches

2.1.4.

Before the tests in 2.2 and 2.3 are carried out, a sufficient number of prepackages shall be drawn at random from the batch so that the check requiring the larger sample can be carried out.

For the other check, the necessary sample shall be drawn at random from the first sample and marked.

This marking operation shall be completed before the start of measuring operations.