xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

[F1ANNEX II U.K.

2. REQUIREMENTS FOR CHECKING BATCHES OF PREPACKAGES] U.K.

2.3.Checking of the average actual contents of the individual prepackages making up a batchU.K.

2.3.2.If xi is the measured value for the actual contents of the i-th item in the sample containing n items then:U.K.
2.3.2.1.the mean of the measured values for the sample is obtained by the following calculation:U.K.
2.3.2.2.and the estimated value of the standard deviation s by the following calculation:U.K.

the estimated value of the standard deviation is: