Directive 2012/27/EU of the European Parliament and of the CouncilShow full title

Directive 2012/27/EU of the European Parliament and of the Council of 25 October 2012 on energy efficiency, amending Directives 2009/125/EC and 2010/30/EU and repealing Directives 2004/8/EC and 2006/32/EC (Text with EEA relevance)

Directive 2012/27/EU of the European Parliament and of the Council

of 25 October 2012

on energy efficiency, amending Directives 2009/125/EC and 2010/30/EU and repealing Directives 2004/8/EC and 2006/32/EC

(Text with EEA relevance)

THE EUROPEAN PARLIAMENT AND THE COUNCIL OF THE EUROPEAN UNION,

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 194(2) thereof,

Having regard to the proposal from the European Commission,

After transmission of the draft legislative act to the national parliaments,

Having regard to the opinion of the European Economic and Social Committee(1),

Having regard to the opinion of the Committee of the Regions(2),

Acting in accordance with the ordinary legislative procedure(3),

Whereas:

(1) The Union is facing unprecedented challenges resulting from increased dependence on energy imports and scarce energy resources, and the need to limit climate change and to overcome the economic crisis. Energy efficiency is a valuable means to address these challenges. It improves the Union’s security of supply by reducing primary energy consumption and decreasing energy imports. It helps to reduce greenhouse gas emissions in a cost-effective way and thereby to mitigate climate change. Shifting to a more energy-efficient economy should also accelerate the spread of innovative technological solutions and improve the competitiveness of industry in the Union, boosting economic growth and creating high quality jobs in several sectors related to energy efficiency.

(2) The Conclusions of the European Council of 8 and 9 March 2007 emphasised the need to increase energy efficiency in the Union to achieve the objective of saving 20 % of the Union’s primary energy consumption by 2020 compared to projections. The conclusions of the European Council of 4 February 2011 emphasised that the 2020 20 % energy efficiency target as agreed by the June 2010 European Council, which is presently not on track, must be delivered. Projections made in 2007 showed a primary energy consumption in 2020 of 1 842 Mtoe. A 20 % reduction results in 1 474 Mtoe in 2020, i.e. a reduction of 368 Mtoe as compared to projections.

(3) The Conclusions of the European Council of 17 June 2010 confirmed the energy efficiency target as one of the headline targets of the Union’s new strategy for jobs and smart, sustainable and inclusive growth (‘Europe 2020 Strategy’). Under this process and in order to implement this objective at national level, Member States are required to set national targets in close dialogue with the Commission and to indicate, in their National Reform Programmes, how they intend to achieve them.

(4) The Commission Communication of 10 November 2010 on Energy 2020 places energy efficiency at the core of the Union energy strategy for 2020 and outlines the need for a new energy efficiency strategy that will enable all Member States to decouple energy use from economic growth.

(5) In its resolution of 15 December 2010 on the Revision of the Energy Efficiency Action Plan, the European Parliament called on the Commission to include in its revised Energy Efficiency Action Plan measures to close the gap to reach the overall Union energy efficiency objective in 2020.

(6) One of the initiatives of the Europe 2020 Strategy is the flagship resource-efficient Europe adopted by the Commission on 26 January 2011. This identifies energy efficiency as a major element in ensuring the sustainability of the use of energy resources.

(7) The Conclusions of the European Council of 4 February 2011 acknowledged that the Union energy efficiency target is not on track and that determined action is required to tap the considerable potential for higher energy savings in buildings, transport, products and processes. Those conclusions also provide that the implementation of the Union energy efficiency target will be reviewed by 2013 and further measures considered if necessary.

(8) On 8 March 2011, the Commission adopted its Communication on an Energy Efficiency Plan 2011. The Communication confirmed that the Union is not on track to achieve its energy efficiency target. This is despite the progress in national energy efficiency policies outlined in the first National Energy Efficiency Action Plans submitted by Member States in fulfilment of the requirements of Directive 2006/32/EC of the European Parliament and of the Council of 5 April 2006 on energy end-use efficiency and energy services(4). Initial analysis of the second Action Plans confirms that the Union is not on track. To remedy that, the Energy Efficiency Plan 2011 spelled out a series of energy efficiency policies and measures covering the full energy chain, including energy generation, transmission and distribution; the leading role of the public sector in energy efficiency; buildings and appliances; industry; and the need to empower final customers to manage their energy consumption. Energy efficiency in the transport sector was considered in parallel in the White Paper on Transport, adopted on 28 March 2011. In particular, Initiative 26 of the White Paper calls for appropriate standards for CO2 emissions of vehicles in all modes, where necessary supplemented by requirements on energy efficiency to address all types of propulsion systems.

(9) On 8 March 2011, the Commission also adopted a Roadmap for moving to a competitive low carbon economy in 2050, identifying the need from this perspective for more focus on energy efficiency.

(10) In this context it is necessary to update the Union’s legal framework for energy efficiency with a Directive pursuing the overall objective of the energy efficiency target of saving 20 % of the Union’s primary energy consumption by 2020, and of making further energy efficiency improvements after 2020. To that end, this Directive should establish a common framework to promote energy efficiency within the Union and lay down specific actions to implement some of the proposals included in the Energy Efficiency Plan 2011 and achieve the significant unrealised energy saving potentials it identifies.

(11) Decision No 406/2009/EC of the European Parliament and of the Council of 23 April 2009 on the effort of Member States to reduce their greenhouse gas emissions to meet the Community’s greenhouse gas emission reduction commitments up to 2020(5) requires the Commission to assess and report by 2012 on the progress of the Union and its Member States towards the objective of reducing energy consumption by 20 % by 2020 compared to projections. It also states that, to help Member States meet the Union’s greenhouse gas emission reduction commitments, the Commission should propose, by 31 December 2012, strengthened or new measures to accelerate energy efficiency improvements. This Directive responds to this requirement. It also contributes to meeting the goals set out in the Roadmap for moving to a competitive low carbon economy in 2050, in particular by reducing greenhouse gas emissions from the energy sector, and to achieving zero emission electricity production by 2050.

(12) An integrated approach has to be taken to tap all the existing energy saving potential, encompassing savings in the energy supply and the end-use sectors. At the same time, the provisions of Directive 2004/8/EC of the European Parliament and of the Council of 11 February 2004 on promotion of cogeneration based on a useful heat demand in the internal energy market(6) and Directive 2006/32/EC should be strengthened.

(13) It would be preferable for the 20 % energy efficiency target to be achieved as a result of the cumulative implementation of specific national and European measures promoting energy efficiency in different fields. Member States should be required to set indicative national energy efficiency targets, schemes and programmes. These targets and the individual efforts of each Member State should be evaluated by the Commission, alongside data on the progress made, to assess the likelihood of achieving the overall Union target and the extent to which the individual efforts are sufficient to meet the common goal. The Commission should therefore closely monitor the implementation of national energy efficiency programmes through its revised legislative framework and within the Europe 2020 process. When setting the indicative national energy efficiency targets, Member States should be able to take into account national circumstances affecting primary energy consumption such as remaining cost-effective energy-saving potential, changes in energy imports and exports, development of all sources of renewable energies, nuclear energy, carbon capture and storage, and early action. When undertaking modelling exercises, the Commission should consult Member States on model assumptions and draft model results in a timely and transparent manner. Improved modelling of the impact of energy efficiency measures and of the stock and performance of technologies is needed.

(14) Directive 2009/28/EC of the European Parliament and of the Council of 23 April 2009 on the promotion of the use of energy from renewable sources(7) states that Cyprus and Malta, due to their insular and peripheral character, rely on aviation as a mode of transport, which is essential for their citizens and their economy. As a result, Cyprus and Malta have a gross final consumption of energy in national air transport which is disproportionately high, i.e. more than three times the Community average in 2005, and are thus disproportionately affected by the current technological and regulatory constraints.

(15) The total volume of public spending is equivalent to 19 % of the Union’s gross domestic product. For this reason the public sector constitutes an important driver to stimulate market transformation towards more efficient products, buildings and services, as well as to trigger behavioural changes in energy consumption by citizens and enterprises. Furthermore, decreasing energy consumption through energy efficiency improvement measures can free up public resources for other purposes. Public bodies at national, regional and local level should fulfil an exemplary role as regards energy efficiency.

(16) Bearing in mind that the Council conclusions of 10 June 2011 on the Energy Efficiency Plan 2011 stressed that buildings represent 40 % of the Union’s final energy consumption, and in order to capture the growth and employment opportunities in the skilled trades and construction sectors, as well as in the production of construction products and in professional activities such as architecture, consultancy and engineering, Member States should establish a long-term strategy beyond 2020 for mobilising investment in the renovation of residential and commercial buildings with a view to improving the energy performance of the building stock. That strategy should address cost-effective deep renovations which lead to a refurbishment that reduces both the delivered and the final energy consumption of a building by a significant percentage compared with the pre-renovation levels leading to a very high energy performance. Such deep renovations could also be carried out in stages.

(17) The rate of building renovation needs to be increased, as the existing building stock represents the single biggest potential sector for energy savings. Moreover, buildings are crucial to achieving the Union objective of reducing greenhouse gas emissions by 80-95 % by 2050 compared to 1990. Buildings owned by public bodies account for a considerable share of the building stock and have high visibility in public life. It is therefore appropriate to set an annual rate of renovation of buildings owned and occupied by central government on the territory of a Member State to upgrade their energy performance. This renovation rate should be without prejudice to the obligations with regard to nearly-zero energy buildings set in Directive 2010/31/EU of the European Parliament and of the Council of 19 May 2010 on the energy performance of buildings(8). The obligation to renovate central government buildings in this Directive complements that Directive, which requires Member States to ensure that when existing buildings undergo major renovation their energy performance is upgraded so that they meet minimum energy performance requirements. It should be possible for Member States to take alternative cost-efficient measures to achieve an equivalent improvement of the energy performance of the buildings within their central government estate. The obligation to renovate floor area of central government buildings should apply to the administrative departments whose competence extends over the whole territory of a Member State. When in a given Member State and for a given competence no such relevant administrative department exists that covers the whole territory, the obligation should apply to those administrative departments whose competences cover collectively the whole territory.

(18) A number of municipalities and other public bodies in the Member States have already put into place integrated approaches to energy saving and energy supply, for example via sustainable energy action plans, such as those developed under the Covenant of Mayors initiative, and integrated urban approaches which go beyond individual interventions in buildings or transport modes. Member States should encourage municipalities and other public bodies to adopt integrated and sustainable energy efficiency plans with clear objectives, to involve citizens in their development and implementation and to adequately inform them about their content and progress in achieving objectives. Such plans can yield considerable energy savings, especially if they are implemented by energy management systems that allow the public bodies concerned to better manage their energy consumption. Exchange of experience between cities, towns and other public bodies should be encouraged with respect to the more innovative experiences.

(19) With regard to the purchase of certain products and services and the purchase and rent of buildings, central governments which conclude public works, supply or service contracts should lead by example and make energy-efficient purchasing decisions. This should apply to the administrative departments whose competence extends over the whole territory of a Member State. When in a given Member State and for a given competence no such relevant administrative department exists that covers the whole territory, the obligation should apply to those administrative departments whose competences cover collectively the whole territory. The provisions of the Union’s public procurement directives should not however be affected. For products other than those covered by the energy efficiency requirements for purchasing in this Directive, Member States should encourage public bodies to take into account the energy efficiency of purchase.

(20) An assessment of the possibility of establishing a ‘white certificate’ scheme at Union level has shown that, in the current situation, such a system would create excessive administrative costs and that there is a risk that energy savings would be concentrated in a number of Member States and not introduced across the Union. The objective of such a Union-level scheme could be better achieved, at least at this stage, by means of national energy efficiency obligation schemes for energy utilities or other alternative policy measures that achieve the same amount of energy savings. It is appropriate for the level of ambition of such schemes to be established in a common framework at Union level while providing significant flexibility to Member States to take fully into account the national organisation of market actors, the specific context of the energy sector and final customers’ habits. The common framework should give energy utilities the option of offering energy services to all final customers, not only to those to whom they sell energy. This increases competition in the energy market because energy utilities can differentiate their product by providing complementary energy services. The common framework should allow Member States to include requirements in their national scheme that pursue a social aim, in particular in order to ensure that vulnerable customers have access to the benefits of higher energy efficiency. Member States should determine, on the basis of objective and non-discriminatory criteria, which energy distributors or retail energy sales companies should be obliged to achieve the end-use energy savings target laid down in this Directive. Member States should in particular be allowed not to impose this obligation on small energy distributors, small retail energy sales companies and small energy sectors to avoid disproportionate administrative burdens. The Commission Communication of 25 June 2008 sets out principles that should be taken into account by Member States that decide to abstain from applying this possibility. As a means of supporting national energy efficiency initiatives, obligated parties under national energy efficiency obligation schemes could fulfil their obligations by contributing annually to an Energy Efficiency National Fund an amount that is equal to the investments required under the scheme.

(21) Given the over-arching imperative of restoring sustainability to public finances and of fiscal consolidation, in the implementation of particular measures falling within the scope of this Directive, due regard should be accorded to the cost-effectiveness at Member State level of implementing energy efficiency measures on the basis of an appropriate level of analysis and evaluation.

(22) The requirement to achieve savings of the annual energy sales to final customers relative to what energy sales would have been does not constitute a cap on sales or energy consumption. Member States should be able to exclude all or part of the sales of energy, by volume, used in industrial activities listed in Annex I to Directive 2003/87/EC of the European Parliament and of the Council of 13 October 2003 establishing a scheme for greenhouse gas emission allowance trading within the Community(9) for the calculation of the energy sales to final customers, as it is recognised that certain sectors or subsectors within these activities may be exposed to a significant risk of carbon leakage. It is appropriate that Member States are aware of the costs of schemes in order to be able to accurately assess the costs of measures.

(23) Without prejudice to the requirements in Article 7 and with a view to limiting the administrative burden, each Member State may group all individual policy measures to implement Article 7 into a comprehensive national energy efficiency programme.

(24) To tap the energy savings potential in certain market segments where energy audits are generally not offered commercially (such as small and medium-sized enterprises (SMEs)), Member States should develop programmes to encourage SMEs to undergo energy audits. Energy audits should be mandatory and regular for large enterprises, as energy savings can be significant. Energy audits should take into account relevant European or International Standards, such as EN ISO 50001 (Energy Management Systems), or EN 16247-1 (Energy Audits), or, if including an energy audit, EN ISO 14000 (Environmental Management Systems) and thus be also in line with the provisions of Annex VI to this Directive as such provisions do not go beyond the requirements of these relevant standards. A specific European standard on energy audits is currently under development.

(25) Where energy audits are carried out by in-house experts, the necessary independence would require these experts not to be directly engaged in the activity audited.

(26) When designing energy efficiency improvement measures, account should be taken of efficiency gains and savings obtained through the widespread application of cost-effective technological innovations such as smart meters. Where smart meters have been installed, they should not be used by companies for unjustified back billing.

(27) In relation to electricity, and in accordance with Directive 2009/72/EC of the European Parliament and of the Council of 13 July 2009 concerning common rules for the internal market in electricity(10), where the roll-out of smart meters is assessed positively, at least 80 % of consumers should be equipped with intelligent metering systems by 2020. In relation to gas, and in accordance with Directive 2009/73/EC of the European Parliament and of the Council of 13 July 2009 concerning common rules for the internal market in natural gas(11), where the roll-out of intelligent metering systems is assessed positively, Member States or any competent authority they designate, should prepare a timetable for the implementation of intelligent metering systems.

(28) Use of individual meters or heat cost allocators for measuring individual consumption of heating in multi-apartment buildings supplied by district heating or common central heating is beneficial when final customers have a means to control their own individual consumption. Therefore, their use makes sense only in buildings where radiators are equipped with thermostatic radiator valves.

(29) In some multi-apartment buildings supplied by district heating or common central heating, the use of accurate individual heat meters would be technically complicated and costly due to the fact that the hot water used for heating enters and leaves the apartments at several points. It can be assumed that individual metering of heat consumption in multi-apartment buildings is, nevertheless, technically possible when the installation of individual meters would not require changing the existing in-house piping for hot water heating in the building. In such buildings, measurements of individual heat consumption can then be carried out by means of individual heat cost allocators installed on each radiator.

(30) Directive 2006/32/EC requires Member States to ensure that final customers are provided with competitively priced individual meters that accurately reflect their actual energy consumption and provide information on actual time of use. In most cases, this requirement is subject to the conditions that it should be technically possible, financially reasonable, and proportionate in relation to the potential energy savings. When a connection is made in a new building or a building undergoes major renovations, as defined in Directive 2010/31/EU, such individual meters should, however, always be provided. Directive 2006/32/EC also requires that clear billing based on actual consumption should be provided frequently enough to enable consumers to regulate their own energy use.

(31) Directives 2009/72/EC and 2009/73/EC require Member States to ensure the implementation of intelligent metering systems to assist the active participation of consumers in the electricity and gas supply markets. As regards electricity, where the roll-out of smart meters is found to be cost-effective, at least 80 % of consumers must be equipped with intelligent metering systems by 2020. As regards natural gas, no deadline is given but the preparation of a timetable is required. Those Directives also state that final customers must be properly informed of actual electricity/gas consumption and costs frequently enough to enable them to regulate their own consumption.

(32) The impact of the provisions on metering and billing in Directives 2006/32/EC, 2009/72/EC and 2009/73/EC on energy saving has been limited. In many parts of the Union, these provisions have not led to customers receiving up-to-date information about their energy consumption, or billing based on actual consumption at a frequency which studies show is needed to enable customers to regulate their energy use. In the sectors of space heating and hot water in multi-apartment buildings the insufficient clarity of these provisions has also led to numerous complaints from citizens.

(33) In order to strengthen the empowerment of final customers as regards access to information from the metering and billing of their individual energy consumption, bearing in mind the opportunities associated with the process of the implementation of intelligent metering systems and the roll out of smart meters in the Member States, it is important that the requirements of Union law in this area be made clearer. This should help reduce the costs of the implementation of intelligent metering systems equipped with functions enhancing energy saving and support the development of markets for energy services and demand management. Implementation of intelligent metering systems enables frequent billing based on actual consumption. However, there is also a need to clarify the requirements for access to information and fair and accurate billing based on actual consumption in cases where smart meters will not be available by 2020, including in relation to metering and billing of individual consumption of heating, cooling and hot water in multi-unit buildings supplied by district heating/cooling or own common heating system installed in such buildings.

(34) When designing energy efficiency improvement measures, Member States should take due account of the need to ensure the correct functioning of the internal market and the coherent implementation of the acquis, in accordance with the Treaty on the Functioning of the European Union.

(35) High-efficiency cogeneration and district heating and cooling has significant potential for saving primary energy, which is largely untapped in the Union. Member States should carry out a comprehensive assessment of the potential for high-efficiency cogeneration and district heating and cooling. These assessments should be updated, at the request of the Commission, to provide investors with information concerning national development plans and contribute to a stable and supportive investment environment. New electricity generation installations and existing installations which are substantially refurbished or whose permit or licence is updated should, subject to a cost-benefit analysis showing a cost-benefit surplus, be equipped with high-efficiency cogeneration units to recover waste heat stemming from the production of electricity. This waste heat could then be transported where it is needed through district heating networks. The events that trigger a requirement for authorisation criteria to be applied will generally be events that also trigger requirements for permits under Directive 2010/75/EU of the European Parliament and of the Council of 24 November 2010 on industrial emissions(12) and for authorisation under Directive 2009/72/EC.

(36) It may be appropriate for nuclear power installations, or electricity generation installations that are intended to make use of geological storage permitted under Directive 2009/31/EC of the European Parliament and of the Council of 23 April 2009 on the geological storage of carbon dioxide(13), to be located in places where the recovery of waste heat through high-efficiency cogeneration or by supplying a district heating or cooling network is not cost-effective. Member States should therefore be able to exempt those installations from the obligation to carry out a cost-benefit analysis for providing the installation with equipment allowing the recovery of waste heat by means of a high-efficiency cogeneration unit. It should also be possible to exempt peak-load and back-up electricity generation installations which are planned to operate under 1 500 operating hours per year as a rolling average over a period of five years from the requirement to also provide heat.

(37) It is appropriate for Member States to encourage the introduction of measures and procedures to promote cogeneration installations with a total rated thermal input of less than 20 MW in order to encourage distributed energy generation.

(38) High-efficiency cogeneration should be defined by the energy savings obtained by combined production instead of separate production of heat and electricity. The definitions of cogeneration and high-efficiency cogeneration used in Union legislation should be without prejudice to the use of different definitions in national legislation for purposes other than those of the Union legislation in question. To maximise energy savings and avoid energy saving opportunities being missed, the greatest attention should be paid to the operating conditions of cogeneration units.

(39) To increase transparency for the final customer to be able to choose between electricity from cogeneration and electricity produced by other techniques, the origin of high-efficiency cogeneration should be guaranteed on the basis of harmonised efficiency reference values. Guarantee of origin schemes do not by themselves imply a right to benefit from national support mechanisms. It is important that all forms of electricity produced from high-efficiency cogeneration can be covered by guarantees of origin. Guarantees of origin should be distinguished from exchangeable certificates.

(40) The specific structure of the cogeneration and district heating and cooling sectors, which include many small and medium-sized producers, should be taken into account, especially when reviewing the administrative procedures for obtaining permission to construct cogeneration capacity or associated networks, in application of the ‘Think Small First’ principle.

(41) Most Union businesses are SMEs. They represent an enormous energy saving potential for the Union. To help them adopt energy efficiency measures, Member States should establish a favourable framework aimed at providing SMEs with technical assistance and targeted information.

(42) Directive 2010/75/EU includes energy efficiency among the criteria for determining the Best Available Techniques that should serve as a reference for setting the permit conditions for installations within its scope, including combustion installations with a total rated thermal input of 50 MW or more. However, that Directive gives Member States the option not to impose requirements relating to energy efficiency on combustion units or other units emitting carbon dioxide on the site, for the activities listed in Annex I to Directive 2003/87/EC. Member States could include information on energy efficiency levels in their reporting under Directive 2010/75/EU.

(43) Member States should establish, on the basis of objective, transparent and non-discriminatory criteria, rules governing the bearing and sharing of costs of grid connections and grid reinforcements and for technical adaptations needed to integrate new producers of electricity produced from high-efficiency cogeneration, taking into account guidelines and codes developed in accordance with Regulation (EC) No 714/2009 of the European Parliament and of the Council of 13 July 2009 on conditions for access to the network for cross-border exchanges in electricity(14) and Regulation (EC) No 715/2009 of the European Parliament and of the Council of 13 July 2009 on conditions for access to the natural gas transmission networks(15). Producers of electricity generated from high-efficiency cogeneration should be allowed to issue a call for tender for the connection work. Access to the grid system for electricity produced from high-efficiency cogeneration, especially for small scale and micro-cogeneration units, should be facilitated. In accordance with Article 3(2) of Directive 2009/72/EC and Article 3(2) of Directive 2009/73/EC, Member States may impose public service obligations, including in relation to energy efficiency, on undertakings operating in the electricity and gas sectors.

(44) Demand response is an important instrument for improving energy efficiency, since it significantly increases the opportunities for consumers or third parties nominated by them to take action on consumption and billing information and thus provides a mechanism to reduce or shift consumption, resulting in energy savings in both final consumption and, through the more optimal use of networks and generation assets, in energy generation, transmission and distribution.

(45) Demand response can be based on final customers’ responses to price signals or on building automation. Conditions for, and access to, demand response should be improved, including for small final consumers. Taking into account the continuing deployment of smart grids, Member States should therefore ensure that national energy regulatory authorities are able to ensure that network tariffs and regulations incentivise improvements in energy efficiency and support dynamic pricing for demand response measures by final customers. Market integration and equal market entry opportunities for demand-side resources (supply and consumer loads) alongside generation should be pursued. In addition, Member States should ensure that national energy regulatory authorities take an integrated approach encompassing potential savings in the energy supply and the end-use sectors.

(46) A sufficient number of reliable professionals competent in the field of energy efficiency should be available to ensure the effective and timely implementation of this Directive, for instance as regards compliance with the requirements on energy audits and implementation of energy efficiency obligation schemes. Member States should therefore put in place certification schemes for the providers of energy services, energy audits and other energy efficiency improvement measures.

(47) It is necessary to continue developing the market for energy services to ensure the availability of both the demand for and the supply of energy services. Transparency, for example by means of lists of energy services providers, can contribute to this. Model contracts, exchange of best practice and guidelines, in particular for energy performance contracting, can also help stimulate demand. As in other forms of third-party financing arrangements, in an energy performance contract the beneficiary of the energy service avoids investment costs by using part of the financial value of energy savings to repay the investment fully or partially carried out by a third party.

(48) There is a need to identify and remove regulatory and non-regulatory barriers to the use of energy performance contracting and other third-party financing arrangements for energy savings. These barriers include accounting rules and practices that prevent capital investments and annual financial savings resulting from energy efficiency improvement measures from being adequately reflected in the accounts for the whole life of the investment. Obstacles to the renovating of the existing building stock based on a split of incentives between the different actors concerned should also be tackled at national level.

(49) Member States and regions should be encouraged to make full use of the Structural Funds and the Cohesion Fund to trigger investments in energy efficiency improvement measures. Investment in energy efficiency has the potential to contribute to economic growth, employment, innovation and a reduction in fuel poverty in households, and therefore makes a positive contribution to economic, social and territorial cohesion. Potential areas for funding include energy efficiency measures in public buildings and housing, and providing new skills to promote employment in the energy efficiency sector.

(50) Member States should encourage the use of financing facilities to further the objectives of this Directive. Such financing facilities could include financial contributions and fines from non-fulfilment of certain provisions of this Directive; resources allocated to energy efficiency under Article 10(3) of Directive 2003/87/EC; resources allocated to energy efficiency in the multiannual financial framework, in particular cohesion, structural and rural development funds, and dedicated European financial instruments, such as the European Energy Efficiency Fund.

(51) Financing facilities could be based, where applicable, on resources allocated to energy efficiency from Union project bonds; resources allocated to energy efficiency from the European Investment Bank and other European financial institutions, in particular the European Bank for Reconstruction and Development and the Council of Europe Development Bank; resources leveraged in financial institutions; national resources, including through the creation of regulatory and fiscal frameworks encouraging the implementation of energy efficiency initiatives and programmes; revenues from annual emission allocations under Decision No 406/2009/EC.

(52) The financing facilities could in particular use those contributions, resources and revenues to enable and encourage private capital investment, in particular drawing on institutional investors, while using criteria ensuring the achievement of both environmental and social objectives for the granting of funds; make use of innovative financing mechanisms (e.g. loan guarantees for private capital, loan guarantees to foster energy performance contracting, grants, subsidised loans and dedicated credit lines, third party financing systems) that reduce the risks of energy efficiency projects and allow for cost-effective renovations even among low and medium revenue households; be linked to programmes or agencies which will aggregate and assess the quality of energy saving projects, provide technical assistance, promote the energy services market and help to generate consumer demand for energy services.

(53) The financing facilities could also provide appropriate resources to support training and certification programmes which improve and accredit skills for energy efficiency; provide resources for research on and demonstration and acceleration of uptake of small-scale and micro- technologies to generate energy and the optimisation of the connections of those generators to the grid; be linked to programmes undertaking action to promote energy efficiency in all dwellings to prevent energy poverty and stimulate landlords letting dwellings to render their property as energy-efficient as possible; provide appropriate resources to support social dialogue and standard-setting aiming at improving energy efficiency and ensuring good working conditions and health and safety at work.

(54) Available Union financial instruments and innovative financing mechanisms should be used to give practical effect to the objective of improving the energy performance of public bodies’ buildings. In that respect, Member States may use their revenues from annual emission allocations under Decision No 406/2009/EC in the development of such mechanisms on a voluntary basis and taking into account national budgetary rules.

(55) In the implementation of the 20 % energy efficiency target, the Commission will have to monitor the impact of new measures on Directive 2003/87/EC establishing the Union’s emissions trading scheme (ETS) in order to maintain the incentives in the emissions trading system rewarding low carbon investments and preparing the ETS sectors for the innovations needed in the future. It will need to monitor the impact on those industry sectors which are exposed to a significant risk of carbon leakage as determined in Commission Decision 2010/2/EU of 24 December 2009 determining, pursuant to Directive 2003/87/EC of the European Parliament and of the Council, a list of sectors and subsectors which are deemed to be exposed to a significant risk of carbon leakage(16), in order to ensure that this Directive promotes and does not impede the development of these sectors.

(56) Directive 2006/32/EC requires Member States to adopt, and aim to achieve, an overall national indicative energy savings target of 9 % by 2016, to be reached by deploying energy services and other energy efficiency improvement measures. That Directive states that the second Energy Efficiency Plan adopted by the Member States shall be followed, as appropriate and where necessary, by Commission proposals for additional measures, including extending the period of application of targets. If a report concludes that insufficient progress has been made towards achieving the indicative national targets laid down by that Directive, these proposals are to address the level and nature of the targets. The impact assessment accompanying this Directive finds that the Member States are on track to achieve the 9 % target, which is substantially less ambitious than the subsequently adopted 20 % energy saving target for 2020, and therefore there is no need to address the level of the targets.

(57) The Intelligent Energy Europe Programme established by Decision No 1639/2006/EC of the European Parliament and of the Council of 24 October 2006 establishing a Competitiveness and Innovation Framework Programme (2007 to 2013)(17) has been instrumental in creating an enabling environment for the proper implementation of the Union’s sustainable energy policies, by removing market barriers such as insufficient awareness and capacity of market actors and institutions, national technical or administrative barriers to the proper functioning of the internal energy market or underdeveloped labour markets to match the low-carbon economy challenge. Many of those barriers are still relevant.

(58) In order to tap the considerable energy-saving potential of energy-related products, the implementation of Directive 2009/125/EC of the European Parliament and of the Council of 21 October 2009 establishing a framework for the setting of ecodesign requirements for energy-related products(18) and Directive 2010/30/EU of the European Parliament and of the Council of 19 May 2010 on the indication by labelling and standard product information of the consumption of energy and other resources by energy-related products(19) should be accelerated and widened. Priority should be given to products offering the highest energy-saving potential as identified by the Ecodesign Working Plan and the revision, where appropriate, of existing measures.

(59) In order to clarify the conditions under which Member States can set energy performance requirements under Directive 2010/31/EU whilst respecting Directive 2009/125/EC and its implementing measures, Directive 2009/125/EC should be amended accordingly.

(60) Since the objective of this Directive, namely to achieve the Union’s energy efficiency target of 20 % by 2020 and pave the way towards further energy efficiency improvements beyond 2020, cannot be sufficiently achieved by the Member States without taking additional energy efficiency measures, and can be better achieved at Union level, the Union may adopt measures, in accordance with the principle of subsidiarity as set out in Article 5 of the Treaty on European Union. In accordance with the principle of proportionality, as set out in that Article, this Directive does not go beyond what is necessary in order to achieve that objective.

(61) In order to permit adaptation to technical progress and changes in the distribution of energy sources, the power to adopt acts in accordance with Article 290 of the Treaty on the Functioning of the European Union should be delegated to the Commission in respect of the review of the harmonised efficiency reference values laid down on the basis of Directive 2004/8/EC and in respect of the values, calculation methods, default primary energy coefficient and requirements in the Annexes to this Directive. It is of particular importance that the Commission carry out appropriate consultations during its preparatory work, including at expert level. The Commission, when preparing and drawing up delegated acts, should ensure a simultaneous, timely and appropriate transmission of relevant documents to the European Parliament and the Council.

(62) In order to ensure uniform conditions for the implementation of this Directive, implementing powers should be conferred on the Commission. Those powers should be exercised in accordance with Regulation (EU) No 182/2011 of the European Parliament and of the Council of 16 February 2011 laying down the rules and general principles concerning mechanisms for control by Member States of the Commission’s exercise of implementing powers(20).

(63) All substantive provisions of Directives 2004/8/EC and 2006/32/EC should be repealed, except Article 4(1) to (4) of, and Annexes I, III and IV to Directive 2006/32/EC. Those latter provisions should continue to apply until the deadline for the achievement of the 9 % target. Article 9(1) and (2) of Directive 2010/30/EU, which provides for an obligation for Member States only to endeavour to procure products having the highest energy efficiency class, should be deleted.

(64) The obligation to transpose this Directive into national law should be limited to those provisions that represent a substantive change as compared with Directives 2004/8/EC and 2006/32/EC. The obligation to transpose the provisions which are unchanged arises under those Directives.

(65) This Directive should be without prejudice to the obligations of the Member States relating to the time limits for transposition into national law and application of Directives 2004/8/EC and 2006/32/EC.

(66) In accordance with the Joint Political Declaration of Member States and the Commission on explanatory documents of 28 September 2011, Member States have undertaken to accompany, in justified cases, the notification of their transposition measures with one or more documents explaining the relationship between the components of a directive and the corresponding parts of national transposition instruments. With regard to this Directive, the legislator considers the transmission of such documents to be justified,

HAVE ADOPTED THIS DIRECTIVE:

CHAPTER IU.K. SUBJECT MATTER, SCOPE, DEFINITIONS AND ENERGY EFFICIENCY TARGETS

Article 1U.K.Subject matter and scope

[F11. This Directive establishes a common framework of measures to promote energy efficiency within the Union in order to ensure that the Union's 2020 headline targets on energy efficiency of 20 % and its 2030 headline targets on energy efficiency of at least 32,5 % are met and paves the way for further energy efficiency improvements beyond those dates.

This Directive lays down rules designed to remove barriers in the energy market and overcome market failures that impede efficiency in the supply and use of energy, and provides for the establishment of indicative national energy efficiency targets and contributions for 2020 and 2030.

This Directive contributes to the implementation of the energy efficiency first principle.]

2.The requirements laid down in this Directive are minimum requirements and shall not prevent any Member State from maintaining or introducing more stringent measures. Such measures shall be compatible with Union law. Where national legislation provides for more stringent measures, the Member State shall notify such legislation to the Commission.

Article 2U.K.Definitions

For the purposes of this Directive, the following definitions shall apply:

(1)

‘energy’ means all forms of energy products, combustible fuels, heat, renewable energy, electricity, or any other form of energy, as defined in Article 2(d) of Regulation (EC) No 1099/2008 of the European Parliament and of the Council of 22 October 2008 on energy statistics(21);

(2)

‘primary energy consumption’ means gross inland consumption, excluding non-energy uses;

(3)

‘final energy consumption’ means all energy supplied to industry, transport, households, services and agriculture. It excludes deliveries to the energy transformation sector and the energy industries themselves;

(4)

‘energy efficiency’ means the ratio of output of performance, service, goods or energy, to input of energy;

(5)

‘energy savings’ means an amount of saved energy determined by measuring and/or estimating consumption before and after implementation of an energy efficiency improvement measure, whilst ensuring normalisation for external conditions that affect energy consumption;

(6)

‘energy efficiency improvement’ means an increase in energy efficiency as a result of technological, behavioural and/or economic changes;

(7)

‘energy service’ means the physical benefit, utility or good derived from a combination of energy with energy-efficient technology or with action, which may include the operations, maintenance and control necessary to deliver the service, which is delivered on the basis of a contract and in normal circumstances has proven to result in verifiable and measurable or estimable energy efficiency improvement or primary energy savings;

(8)

‘public bodies’ means ‘contracting authorities’ as defined in Directive 2004/18/EC of the European Parliament and of the Council of 31 March 2004 on the coordination of procedures for the award of public works contracts, public supply contracts and public service contracts(22);

(9)

‘central government’ means all administrative departments whose competence extends over the whole territory of a Member State;

(10)

‘total useful floor area’ means the floor area of a building or part of a building, where energy is used to condition the indoor climate;

(11)

‘energy management system’ means a set of interrelated or interacting elements of a plan which sets an energy efficiency objective and a strategy to achieve that objective;

(12)

‘European standard’ means a standard adopted by the European Committee for Standardisation, the European Committee for Electrotechnical Standardisation or the European Telecommunications Standards Institute and made available for public use;

(13)

‘international standard’ means a standard adopted by the International Standardisation Organisation and made available to the public;

(14)

‘obligated party’ means an energy distributor or retail energy sales company that is bound by the national energy efficiency obligation schemes referred to in Article 7;

(15)

‘entrusted party’ means a legal entity with delegated power from a government or other public body to develop, manage or operate a financing scheme on behalf of the government or other public body;

(16)

‘participating party’ means an enterprise or public body that has committed itself to reaching certain objectives under a voluntary agreement, or is covered by a national regulatory policy instrument;

(17)

‘implementing public authority’ means a body governed by public law which is responsible for the carrying out or monitoring of energy or carbon taxation, financial schemes and instruments, fiscal incentives, standards and norms, energy labelling schemes, training or education;

(18)

‘policy measure’ means a regulatory, financial, fiscal, voluntary or information provision instrument formally established and implemented in a Member State to create a supportive framework, requirement or incentive for market actors to provide and purchase energy services and to undertake other energy efficiency improvement measures;

(19)

‘individual action’ means an action that leads to verifiable, and measurable or estimable, energy efficiency improvements and is undertaken as a result of a policy measure;

(20)

‘energy distributor’ means a natural or legal person, including a distribution system operator, responsible for transporting energy with a view to its delivery to final customers or to distribution stations that sell energy to final customers;

(21)

‘distribution system operator’ means ‘distribution system operator’ as defined in Directive 2009/72/EC and Directive 2009/73/EC respectively;

(22)

‘retail energy sales company’ means a natural or legal person who sells energy to final customers;

(23)

‘final customer’ means a natural or legal person who purchases energy for own end use;

(24)

‘energy service provider’ means a natural or legal person who delivers energy services or other energy efficiency improvement measures in a final customer’s facility or premises;

(25)

‘energy audit’ means a systematic procedure with the purpose of obtaining adequate knowledge of the existing energy consumption profile of a building or group of buildings, an industrial or commercial operation or installation or a private or public service, identifying and quantifying cost-effective energy savings opportunities, and reporting the findings;

(26)

‘small and medium-sized enterprises’ or ‘SMEs’ means enterprises as defined in Title I of the Annex to Commission Recommendation 2003/361/EC of 6 May 2003 concerning the definition of micro, small and medium-sized enterprises(23); the category of micro, small and medium-sized enterprises is made up of enterprises which employ fewer than 250 persons and which have an annual turnover not exceeding EUR 50 million, and/or an annual balance sheet total not exceeding EUR 43 million;

(27)

‘energy performance contracting’ means a contractual arrangement between the beneficiary and the provider of an energy efficiency improvement measure, verified and monitored during the whole term of the contract, where investments (work, supply or service) in that measure are paid for in relation to a contractually agreed level of energy efficiency improvement or other agreed energy performance criterion, such as financial savings;

(28)

‘smart metering system’ or ‘intelligent metering system’ means an electronic system that can measure energy consumption, providing more information than a conventional meter, and can transmit and receive data using a form of electronic communication;

(29)

‘transmission system operator’ means ‘transmission system operator’ as defined in Directive 2009/72/EC and Directive 2009/73/EC respectively;

(30)

‘cogeneration’ means the simultaneous generation in one process of thermal energy and electrical or mechanical energy;

(31)

‘economically justifiable demand’ means demand that does not exceed the needs for heating or cooling and which would otherwise be satisfied at market conditions by energy generation processes other than cogeneration;

(32)

‘useful heat’ means heat produced in a cogeneration process to satisfy economically justifiable demand for heating or cooling;

(33)

‘electricity from cogeneration’ means electricity generated in a process linked to the production of useful heat and calculated in accordance with the methodology laid down in Annex I;

(34)

‘high-efficiency cogeneration’ means cogeneration meeting the criteria laid down in Annex II;

(35)

‘overall efficiency’ means the annual sum of electricity and mechanical energy production and useful heat output divided by the fuel input used for heat produced in a cogeneration process and gross electricity and mechanical energy production;

(36)

‘power-to-heat ratio’ means the ratio of electricity from cogeneration to useful heat when operating in full cogeneration mode using operational data of the specific unit;

(37)

‘cogeneration unit’ means a unit that is able to operate in cogeneration mode;

(38)

‘small-scale cogeneration unit’ means a cogeneration unit with installed capacity below 1 MWe;

(39)

‘micro-cogeneration unit’ means a cogeneration unit with a maximum capacity below 50 kWe;

(40)

‘plot ratio’ means the ratio of the building floor area to the land area in a given territory;

(41)

‘efficient district heating and cooling’ means a district heating or cooling system using at least 50 % renewable energy, 50 % waste heat, 75 % cogenerated heat or 50 % of a combination of such energy and heat;

(42)

‘efficient heating and cooling’ means a heating and cooling option that, compared to a baseline scenario reflecting a business-as-usual situation, measurably reduces the input of primary energy needed to supply one unit of delivered energy within a relevant system boundary in a cost-effective way, as assessed in the cost-benefit analysis referred to in this Directive, taking into account the energy required for extraction, conversion, transport and distribution;

(43)

‘efficient individual heating and cooling’ means an individual heating and cooling supply option that, compared to efficient district heating and cooling, measurably reduces the input of non-renewable primary energy needed to supply one unit of delivered energy within a relevant system boundary or requires the same input of non-renewable primary energy but at a lower cost, taking into account the energy required for extraction, conversion, transport and distribution;

(44)

‘substantial refurbishment’ means a refurbishment whose cost exceeds 50 % of the investment cost for a new comparable unit;

(45)

‘aggregator’ means a demand service provider that combines multiple short-duration consumer loads for sale or auction in organised energy markets.

Article 3U.K.Energy efficiency targets

1.Each Member State shall set an indicative national energy efficiency target, based on either primary or final energy consumption, primary or final energy savings, or energy intensity. Member States shall notify those targets to the Commission in accordance with Article 24(1) and Annex XIV Part 1. When doing so, they shall also express those targets in terms of an absolute level of primary energy consumption and final energy consumption in 2020 and shall explain how, and on the basis of which data, this has been calculated.

When setting those targets, Member States shall take into account:

[F2(a) that the Union’s 2020 energy consumption has to be no more than 1 483 Mtoe of primary energy or no more than 1 086 Mtoe of final energy;]

(b)the measures provided for in this Directive;

(c)the measures adopted to reach the national energy saving targets adopted pursuant to Article 4(1) of Directive 2006/32/EC; and

(d)other measures to promote energy efficiency within Member States and at Union level.

When setting those targets, Member States may also take into account national circumstances affecting primary energy consumption, such as:

(a)remaining cost-effective energy-saving potential;

(b)GDP evolution and forecast;

(c)changes of energy imports and exports;

(d)development of all sources of renewable energies, nuclear energy, carbon capture and storage; and

(e)early action.

[F22. By 30 June 2014 , the Commission shall assess progress achieved and whether the Union is likely to achieve energy consumption of no more than 1 483 Mtoe of primary energy and/or no more than 1 086 Mtoe of final energy in 2020.]

3.In carrying out the review referred to in paragraph 2, the Commission shall:

(a)sum the national indicative energy efficiency targets reported by Member States;

(b)assess whether the sum of those targets can be considered a reliable guide to whether the Union as a whole is on track, taking into account the evaluation of the first annual report in accordance with Article 24(1), and the evaluation of the National Energy Efficiency Action Plans in accordance with Article 24(2);

(c)take into account complementary analysis arising from:

(i)

an assessment of progress in energy consumption, and in energy consumption in relation to economic activity, at Union level, including progress in the efficiency of energy supply in Member States that have based their national indicative targets on final energy consumption or final energy savings, including progress due to these Member States’ compliance with Chapter III of this Directive;

(ii)

results from modelling exercises in relation to future trends in energy consumption at Union level;

[F2(d) compare the results under points (a) to (c) with the quantity of energy consumption that would be needed to achieve energy consumption of no more than 1 483 Mtoe of primary energy and/or no more than 1 086 Mtoe of final energy in 2020.]

[F34. By 31 October 2022 , the Commission shall assess whether the Union has achieved its 2020 headline targets on energy efficiency.

5. Each Member State shall set indicative national energy efficiency contributions towards the Union's 2030 targets set in Article 1(1) of this Directive in accordance with Articles 4 and 6 of Regulation (EU) 2018/1999 (24) . When setting those contributions, Member States shall take into account that the Union's 2030 energy consumption has to be no more than 1 273 Mtoe of primary energy and/or no more than 956 Mtoe of final energy. Member States shall notify those contributions to the Commission as part of their integrated national energy and climate plans as referred to in, and in accordance with, Articles 3 and 7 to 12 of Regulation (EU) 2018/1999.

6. The Commission shall assess the Union's 2030 headline targets on energy efficiency set in Article 1(1) with a view to submitting a legislative proposal by 2023 to revise those targets upwards in the event of substantial cost reductions resulting from economic or technological developments, or where needed to meet the Union's international commitments for decarbonisation.]

CHAPTER IIU.K. EFFICIENCY IN ENERGY USE

F4Article 4U.K. [F4 [F5Building renovation] ]

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Article 5U.K.Exemplary role of public bodies’ buildings

1.Without prejudice to Article 7 of Directive 2010/31/EU, each Member State shall ensure that, as from 1 January 2014, 3 % of the total floor area of heated and/or cooled buildings owned and occupied by its central government is renovated each year to meet at least the minimum energy performance requirements that it has set in application of Article 4 of Directive 2010/31/EU.

The 3 % rate shall be calculated on the total floor area of buildings with a total useful floor area over 500 m2 owned and occupied by the central government of the Member State concerned that, on 1 January of each year, do not meet the national minimum energy performance requirements set in application of Article 4 of Directive 2010/31/EU. That threshold shall be lowered to 250 m2 as of 9 July 2015.

Where a Member State requires that the obligation to renovate each year 3 % of the total floor area extends to floor area owned and occupied by administrative departments at a level below central government, the 3 % rate shall be calculated on the total floor area of buildings with a total useful floor area over 500 m2 and, as of 9 July 2015, over 250 m2 owned and occupied by central government and by these administrative departments of the Member State concerned that, on 1 January of each year, do not meet the national minimum energy performance requirements set in application of Article 4 of Directive 2010/31/EU.

When implementing measures for the comprehensive renovation of central government buildings in accordance with the first subparagraph, Member States may choose to consider the building as a whole, including the building envelope, equipment, operation and maintenance.

Member States shall require that central government buildings with the poorest energy performance be a priority for energy efficiency measures, where cost-effective and technically feasible.

2.Member States may decide not to set or apply the requirements referred to in paragraph 1 to the following categories of buildings:

(a)buildings officially protected as part of a designated environment, or because of their special architectural or historical merit, in so far as compliance with certain minimum energy performance requirements would unacceptably alter their character or appearance;

(b)buildings owned by the armed forces or central government and serving national defence purposes, apart from single living quarters or office buildings for the armed forces and other staff employed by national defence authorities;

(c)buildings used as places of worship and for religious activities.

3.If a Member State renovates more than 3 % of the total floor area of central government buildings in a given year, it may count the excess towards the annual renovation rate of any of the three previous or following years.

4.Member States may count towards the annual renovation rate of central government buildings new buildings occupied and owned as replacements for specific central government buildings demolished in any of the two previous years, or buildings that have been sold, demolished or taken out of use in any of the two previous years due to more intensive use of other buildings.

5.For the purposes of paragraph 1, by 31 December 2013, Member States shall establish and make publicly available an inventory of heated and/or cooled central government buildings with a total useful floor area over 500 m2 and, as of 9 July 2015, over 250 m2, excluding buildings exempted on the basis of paragraph 2. The inventory shall contain the following data:

(a)the floor area in m2; and

(b)the energy performance of each building or relevant energy data.

6.Without prejudice to Article 7 of Directive 2010/31/EU, Member States may opt for an alternative approach to paragraphs 1 to 5 of this Article, whereby they take other cost-effective measures, including deep renovations and measures for behavioural change of occupants, to achieve, by 2020, an amount of energy savings in eligible buildings owned and occupied by their central government that is at least equivalent to that required in paragraph 1, reported on an annual basis.

For the purpose of the alternative approach, Member States may estimate the energy savings that paragraphs 1 to 4 would generate by using appropriate standard values for the energy consumption of reference central government buildings before and after renovation and according to estimates of the surface of their stock. The categories of reference central government buildings shall be representative of the stock of such buildings.

Member States opting for the alternative approach shall notify to the Commission, by 31 December 2013, the alternative measures that they plan to adopt, showing how they would achieve an equivalent improvement in the energy performance of the buildings within the central government estate.

7.Member States shall encourage public bodies, including at regional and local level, and social housing bodies governed by public law, with due regard for their respective competences and administrative set-up, to:

(a)adopt an energy efficiency plan, freestanding or as part of a broader climate or environmental plan, containing specific energy saving and efficiency objectives and actions, with a view to following the exemplary role of central government buildings laid down in paragraphs 1, 5 and 6;

(b)put in place an energy management system, including energy audits, as part of the implementation of their plan;

(c)use, where appropriate, energy service companies, and energy performance contracting to finance renovations and implement plans to maintain or improve energy efficiency in the long term.

Article 6U.K.Purchasing by public bodies

1.Member States shall ensure that central governments purchase only products, services and buildings with high energy-efficiency performance, insofar as that is consistent with cost-effectiveness, economical feasibility, wider sustainability, technical suitability, as well as sufficient competition, as referred to in Annex III.

The obligation set out in the first subparagraph shall apply to contracts for the purchase of products, services and buildings by public bodies in so far as such contracts have a value equal to or greater than the thresholds laid down in Article 7 of Directive 2004/18/EC.

2.The obligation referred to in paragraph 1 shall apply to the contracts of the armed forces only to the extent that its application does not cause any conflict with the nature and primary aim of the activities of the armed forces. The obligation shall not apply to contracts for the supply of military equipment as defined by Directive 2009/81/EC of the European Parliament and of the Council of 13 July 2009 on the coordination of procedures for the award of certain works contracts, supply contracts and service contracts by contracting authorities or entities in the fields of defence and security(25).

3.Member States shall encourage public bodies, including at regional and local levels, with due regard to their respective competences and administrative set-up, to follow the exemplary role of their central governments to purchase only products, services and buildings with high energy-efficiency performance. Member States shall encourage public bodies, when tendering service contracts with significant energy content, to assess the possibility of concluding long- term energy performance contracts that provide long-term energy savings.

4.Without prejudice to paragraph 1, when purchasing a product package covered as a whole by a delegated act adopted under Directive 2010/30/EU, Member States may require that the aggregate energy efficiency shall take priority over the energy efficiency of individual products within that package, by purchasing the product package that complies with the criterion of belonging to the highest energy efficiency class.

[F1Article 7 U.K. Energy savings obligation

1. Member States shall achieve cumulative end-use energy savings at least equivalent to:

(a) new savings each year from 1 January 2014 to 31 December 2020 of 1,5 % of annual energy sales to final customers by volume, averaged over the most recent three-year period prior to 1 January 2013 . Sales of energy, by volume, used in transport may be excluded, in whole or in part, from that calculation;

(b) new savings each year from 1 January 2021 to 31 December 2030 of 0,8 % of annual final energy consumption, averaged over the most recent three-year period prior to 1 January 2019 . By way of derogation from that requirement, Cyprus and Malta shall achieve new savings each year from 1 January 2021 to 31 December 2030 equivalent to 0,24 % of annual final energy consumption, averaged over the most recent three-year period prior to 1 January 2019 .

Member States may count energy savings that stem from policy measures, whether introduced by 31 December 2020 or after that date, provided that those measures result in new individual actions that are carried out after 31 December 2020 .

Member States shall continue to achieve new annual savings in accordance with point (b) of the first subparagraph for ten-year periods after 2030, unless reviews by the Commission by 2027 and every 10 years thereafter conclude that this is not necessary to achieve the Union's long-term energy and climate targets for 2050.

Member States shall decide how to phase the calculated quantity of new savings over each period referred to in points (a) and (b) of the first subparagraph, provided that the required total cumulative end-use energy savings have been achieved by the end of each obligation period.

2. Provided that Member States achieve at least their cumulative end-use energy savings obligation referred to in point (b) of the first subparagraph of paragraph 1, they may calculate the required amount of energy savings by one or more of the following means:

(a) applying an annual savings rate on energy sales to final customers or on final energy consumption, averaged over the most recent three-year period prior to 1 January 2019 ;

(b) excluding, in whole or in part, energy used in transport from the calculation baseline;

(c) making use of any of the options set out in paragraph 4.

3. Where Member States make use of the possibilities provided for in point (a), (b) or (c) of paragraph 2, they shall establish:

(a) their own annual savings rate that will be applied in the calculation of their cumulative end-use energy savings, which shall ensure that the final amount of their net energy savings is no lower than those required under point (b) of the first subparagraph of paragraph 1; and

(b) their own calculation baseline, which may exclude, in whole or in part, energy used in transport.

4. Subject to paragraph 5, each Member State may:

(a) carry out the calculation required under point (a) of the first subparagraph of paragraph 1 using values of 1 % in 2014 and 2015; 1,25 % in 2016 and 2017; and 1,5 % in 2018, 2019 and 2020;

(b) exclude from the calculation all or part of the sales of energy used, by volume, with respect to the obligation period referred to in point (a) of the first subparagraph of paragraph 1, or final energy consumed, with respect to the obligation period referred to in point (b) of that subparagraph, by industrial activities listed in Annex I to Directive 2003/87/EC;

(c) count towards the amount of required energy savings, energy savings achieved in the energy transformation, distribution and transmission sectors, including efficient district heating and cooling infrastructure, as a result of implementing the requirements set out in Article 14(4), point (b) of Article 14(5), and Article 15(1) to (6) and (9). Member States shall inform the Commission about their intended policy measures under this point for the period from 1 January 2021 to 31 December 2030 as part of their integrated national energy and climate plans. The impact of those measures shall be calculated in accordance with Annex V and included in those plans;

(d) count towards the amount of required energy savings, energy savings resulting from individual actions newly implemented since 31 December 2008 that continue to have an impact in 2020 with respect to the obligation period referred to in point (a) of the first subparagraph of paragraph 1 and beyond 2020 with respect to the period referred to in point (b) of the first subparagraph of paragraph 1, and which can be measured and verified;

(e) count towards the amount of required energy savings, energy savings that stem from policy measures, provided that it can be demonstrated that those measures result in individual actions carried out from 1 January 2018 to 31 December 2020 which deliver savings after 31 December 2020 ;

(f) exclude from the calculation of the amount of required energy savings, 30 % of the verifiable amount of energy generated on or in buildings for own use as a result of policy measures promoting new installation of renewable energy technologies;

(g) count towards the amount of required energy savings, energy savings that exceed the energy savings required for the obligation period from 1 January 2014 to 31 December 2020 , provided that those savings result from individual actions carried out under policy measures referred to in Articles 7a and 7b, notified by Member States in their National Energy Efficiency Action Plans and reported in their progress reports in accordance with Article 24.

5. Member States shall apply and calculate the effect of the options chosen under paragraph 4 for the periods referred to in points (a) and (b) of the first subparagraph of paragraph 1 separately:

(a) for the calculation of the amount of energy savings required for the obligation period referred to in point (a) of the first subparagraph of paragraph 1, Member States may make use of points (a) to (d) of paragraph 4. All the options chosen under paragraph 4 taken together shall amount to no more than 25 % of the amount of energy savings referred to in point (a) of the first subparagraph of paragraph 1;

(b) for the calculation of the amount of energy savings required for the obligation period referred to in point (b) of the first subparagraph of paragraph 1, Member States may make use of points (b) to (g) of paragraph 4, provided individual actions referred to in point (d) of paragraph 4 continue to have a verifiable and measurable impact after 31 December 2020 . All the options chosen under paragraph 4 taken together shall not lead to a reduction of more than 35 % of the amount of energy savings calculated in accordance with paragraphs 2 and 3.

Regardless of whether Member States exclude, in whole or in part, energy used in transport from their calculation baseline or make use of any of the options listed in paragraph 4, they shall ensure that the calculated net amount of new savings to be achieved in final energy consumption during the obligation period from 1 January 2021 to 31 December 2030 is not lower than the amount resulting from applying the annual savings rate referred to in point (b) of the first subparagraph of paragraph 1.

6. Member States shall describe in their integrated national energy and climate plans in accordance with Annex III to Regulation (EU) 2018/1999, the calculation of the amount of energy savings to be achieved over the period from 1 January 2021 to 31 December 2030 referred to in point (b) of the first subparagraph of paragraph 1 of this Article and shall, if relevant, explain how the annual savings rate and the calculation baseline were established, and how and to what extent the options referred to in paragraph 4 of this Article were applied.

7. Energy savings achieved after 31 December 2020 shall not count towards the amount of required energy savings for the period from 1 January 2014 to 31 December 2020 .

8. By way of derogation from paragraph 1 of this Article, Member States that allow obligated parties to use the option referred to in point (b) of Article 7a(6) may, for the purpose of point (a) of the first subparagraph of paragraph 1 of this Article, count energy savings obtained in any given year after 2010 and before the obligation period referred to in point (a) of the first subparagraph of paragraph 1 of this Article as if those energy savings had instead been obtained after 31 December 2013 and before 1 January 2021 , provided that all of the following circumstances apply:

(a) the energy efficiency obligation scheme was in force at any point between 31 December 2009 and 31 December 2014 and was included in the Member State's first National Energy Efficiency Action Plan submitted under Article 24(2);

(b) the savings were generated under the obligation scheme;

(c) the savings are calculated in accordance with Annex V;

(d) the years for which the savings are counted as having been obtained have been reported in the National Energy Efficiency Action Plans in accordance with Article 24(2).

9. Member States shall ensure that savings resulting from policy measures referred to in Articles 7a and 7b and Article 20(6) are calculated in accordance with Annex V.

10. Member States shall achieve the amount of energy savings required under paragraph 1 of this Article either by establishing an energy efficiency obligation scheme referred to in Article 7a or by adopting alternative policy measures referred to in Article 7b. Member States may combine an energy efficiency obligation scheme with alternative policy measures.

11. In designing policy measures to fulfil their obligations to achieve energy savings, Member States shall take into account the need to alleviate energy poverty in accordance with criteria established by them, taking into consideration their available practices in the field, by requiring, to the extent appropriate, a share of energy efficiency measures under their national energy efficiency obligation schemes, alternative policy measures, or programmes or measures financed under an Energy Efficiency National Fund, to be implemented as a priority among vulnerable households, including those affected by energy poverty and, where appropriate, in social housing.

Member States shall include information about the outcome of measures to alleviate energy poverty in the context of this Directive in the integrated national energy and climate progress reports in accordance with Regulation (EU) 2018/1999.

12. Member States shall demonstrate that where there is an overlap in the impact of policy measures or individual actions, there is no double counting of energy savings.]

[F3Article 7a U.K. Energy efficiency obligation schemes

1. Where Member States decide to fulfil their obligations to achieve the amount of savings required under Article 7(1) by way of an energy efficiency obligation scheme, they shall ensure that obligated parties as referred to in paragraph 2 of this Article operating in each Member State's territory achieve, without prejudice to Article 7(4) and (5), their cumulative end-use energy savings requirement as set out in Article 7(1).

Where applicable, Member States may decide that obligated parties fulfil those savings, in whole or in part, as a contribution to the Energy Efficiency National Fund in accordance with Article 20(6).

2. Member States shall designate, on the basis of objective and non-discriminatory criteria, obligated parties among energy distributors, retail energy sales companies and transport fuel distributors or transport fuel retailers operating in their territory. The amount of energy savings needed to fulfil the obligation shall be achieved by the obligated parties among final customers, designated by the Member State, independently of the calculation made pursuant to Article 7(1) or, if Member States so decide, through certified savings stemming from other parties as described in point (a) of paragraph 6 of this Article.

3. Where retail energy sales companies are designated as obligated parties under paragraph 2, Member States shall ensure that, in fulfilling their obligation, retail energy sales companies do not create any barriers that impede consumers from switching from one supplier to another.

4. Member States shall express the amount of energy savings required of each obligated party in terms of either final or primary energy consumption. The method chosen to express the amount of energy savings required shall also be used to calculate the savings claimed by obligated parties. The conversion factors set out in Annex IV shall apply.

5. Member States shall put in place measurement, control and verification systems under which documented verification is carried out on at least a statistically significant proportion and representative sample of the energy efficiency improvement measures put in place by the obligated parties. The measurement, control and verification shall be carried out independently of the obligated parties.

6. Within the energy efficiency obligation scheme, Member States may do one or both of the following:

(a) permit obligated parties to count towards their obligation certified energy savings achieved by energy service providers or other third parties, including when obligated parties promote measures through other State-approved bodies or through public authorities that may involve formal partnerships and may be in combination with other sources of finance. Where Member States so permit, they shall ensure that the certification of energy savings follows an approval process that is put in place in the Member States, that is clear, transparent, and open to all market participants, and that aims to minimise the costs of certification;

(b) allow obligated parties to count savings obtained in a given year as if they had instead been obtained in any of the four previous or three following years as long as this is not beyond the end of the obligation periods set out in Article 7(1).

Member States shall assess and, if appropriate, take measures to minimise the impact of the direct and indirect costs of energy efficiency obligation schemes on the competitiveness of energy-intensive industries exposed to international competition.

7. Member States shall, on an annual basis, publish the energy savings achieved by each obligated party, or each sub-category of obligated party, and in total under the scheme.

Article 7b U.K. Alternative policy measures

1. Where Member States decide to fulfil their obligations to achieve the savings required under Article 7(1) by way of alternative policy measures, they shall ensure, without prejudice to Article 7(4) and (5), that the energy savings required under Article 7(1) are achieved among final customers.

2. For all measures other than those relating to taxation, Member States shall put in place measurement, control and verification systems under which documented verification is carried out on at least a statistically significant proportion and representative sample of the energy efficiency improvement measures put in place by the participating or entrusted parties. The measurement, control and verification shall be carried out independently of the participating or entrusted parties.]

Article 8U.K.Energy audits and energy management systems

1.Member States shall promote the availability to all final customers of high quality energy audits which are cost-effective and:

(a)carried out in an independent manner by qualified and/or accredited experts according to qualification criteria; or

(b)implemented and supervised by independent authorities under national legislation.

The energy audits referred to in the first subparagraph may be carried out by in-house experts or energy auditors provided that the Member State concerned has put in place a scheme to assure and check their quality, including, if appropriate, an annual random selection of at least a statistically significant percentage of all the energy audits they carry out.

For the purpose of guaranteeing the high quality of the energy audits and energy management systems, Member States shall establish transparent and non-discriminatory minimum criteria for energy audits based on Annex VI.

Energy audits shall not include clauses preventing the findings of the audit from being transferred to any qualified/accredited energy service provider, on condition that the customer does not object.

2.Member States shall develop programmes to encourage SMEs to undergo energy audits and the subsequent implementation of the recommendations from these audits.

On the basis of transparent and non-discriminatory criteria and without prejudice to Union State aid law, Member States may set up support schemes for SMEs, including if they have concluded voluntary agreements, to cover costs of an energy audit and of the implementation of highly cost-effective recommendations from the energy audits, if the proposed measures are implemented.

Member States shall bring to the attention of SMEs, including through their respective representative intermediary organisations, concrete examples of how energy management systems could help their businesses. The Commission shall assist Member States by supporting the exchange of best practices in this domain.

3.Member States shall also develop programmes to raise awareness among households about the benefits of such audits through appropriate advice services.

Member States shall encourage training programmes for the qualification of energy auditors in order to facilitate sufficient availability of experts.

4.Member States shall ensure that enterprises that are not SMEs are subject to an energy audit carried out in an independent and cost-effective manner by qualified and/or accredited experts or implemented and supervised by independent authorities under national legislation by 5 December 2015 and at least every four years from the date of the previous energy audit.

5.Energy audits shall be considered as fulfilling the requirements of paragraph 4 when they are carried out in an independent manner, on the basis of minimum criteria based on Annex VI, and implemented under voluntary agreements concluded between organisations of stakeholders and an appointed body and supervised by the Member State concerned, or other bodies to which the competent authorities have delegated the responsibility concerned, or by the Commission.

Access of market participants offering energy services shall be based on transparent and non-discriminatory criteria.

6.Enterprises that are not SMEs and that are implementing an energy or environmental management system - certified by an independent body according to the relevant European or International Standards - shall be exempted from the requirements of paragraph 4, provided that Member States ensure that the management system concerned includes an energy audit on the basis of the minimum criteria based on Annex VI.

7.Energy audits may stand alone or be part of a broader environmental audit. Member States may require that an assessment of the technical and economic feasibility of connection to an existing or planned district heating or cooling network shall be part of the energy audit.

Without prejudice to Union State aid law, Member States may implement incentive and support schemes for the implementation of recommendations from energy audits and similar measures.

Article 9U.K. [F1Metering for gas and electricity]

[F11. Member States shall ensure that, in so far as it is technically possible, financially reasonable and proportionate in relation to the potential energy savings, for electricity and natural gas final customers are provided with competitively priced individual meters that accurately reflect their actual energy consumption and that provide information on the actual time of use.]

Such a competitively priced individual meter shall always be provided when:

(a)an existing meter is replaced, unless this is technically impossible or not cost-effective in relation to the estimated potential savings in the long term;

(b)a new connection is made in a new building or a building undergoes major renovations, as set out in Directive 2010/31/EU.

2.Where, and to the extent that, Member States implement intelligent metering systems and roll out smart meters for natural gas and/or electricity in accordance with Directives 2009/72/EC and 2009/73/EC:

(a)they shall ensure that the metering systems provide to final customers information on actual time of use and that the objectives of energy efficiency and benefits for final customers are fully taken into account when establishing the minimum functionalities of the meters and the obligations imposed on market participants;

(b)they shall ensure the security of the smart meters and data communication, and the privacy of final customers, in compliance with relevant Union data protection and privacy legislation;

(c)in the case of electricity and at the request of the final customer, they shall require meter operators to ensure that the meter or meters can account for electricity put into the grid from the final customer’s premises;

(d)they shall ensure that if final customers request it, metering data on their electricity input and off-take is made available to them or to a third party acting on behalf of the final customer in an easily understandable format that they can use to compare deals on a like-for-like basis;

(e)they shall require that appropriate advice and information be given to customers at the time of installation of smart meters, in particular about their full potential with regard to meter reading management and the monitoring of energy consumption.

F63.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

[F3Article 9a U.K. Metering for heating, cooling and domestic hot water

1. Member States shall ensure that, for district heating, district cooling and domestic hot water, final customers are provided with competitively priced meters that accurately reflect their actual energy consumption.

2. Where heating, cooling or domestic hot water is supplied to a building from a central source that services multiple buildings or from a district heating or district cooling system, a meter shall be installed at the heat exchanger or point of delivery.

Article 9b U.K. Sub-metering and cost allocation for heating, cooling and domestic hot water

1. In multi-apartment and multi-purpose buildings with a central heating or central cooling source or supplied from a district heating or district cooling system, individual meters shall be installed to measure the consumption of heating, cooling or domestic hot water for each building unit, where technically feasible and cost effective in terms of being proportionate in relation to the potential energy savings.

Where the use of individual meters is not technically feasible or where it is not cost-efficient to measure heat consumption in each building unit, individual heat cost allocators shall be used to measure heat consumption at each radiator unless it is shown by the Member State in question that the installation of such heat cost allocators would not be cost-efficient. In those cases, alternative cost-efficient methods of heat consumption measurement may be considered. The general criteria, methodologies and/or procedures to determine technical non-feasibility and non-cost effectiveness shall be clearly set out and published by each Member State.

2. In new multi-apartment buildings and in residential parts of new multi-purpose buildings that are equipped with a central heating source for domestic hot water or are supplied from district heating systems, individual meters shall, notwithstanding the first subparagraph of paragraph 1, be provided for domestic hot water.

3. Where multi-apartment or multi-purpose buildings are supplied from district heating or district cooling, or where own common heating or cooling systems for such buildings are prevalent, Member States shall ensure they have in place transparent, publicly available national rules on the allocation of the cost of heating, cooling and domestic hot water consumption in such buildings to ensure transparency and accuracy of accounting for individual consumption. Where appropriate, such rules shall include guidelines on the manner in which to allocate cost for energy that is used as follows:

(a) domestic hot water;

(b) heat radiated from the building installation and for the purpose of heating the common areas, where staircases and corridors are equipped with radiators;

(c) for the purpose of heating or cooling apartments.

Article 9c U.K. Remote reading requirement

1. For the purposes of Articles 9a and 9b, meters and heat cost allocators installed after 25 October 2020 shall be remotely readable devices. The conditions of technical feasibility and cost effectiveness set out in Article 9b(1) shall continue to apply.

2. Meters and heat cost allocators which are not remotely readable but which have already been installed shall be rendered remotely readable or replaced with remotely readable devices by 1 January 2027 , save where the Member State in question shows that this is not cost-efficient.]

Article 10U.K. [F1Billing information for gas and electricity]

[F11. Where final customers do not have smart meters as referred to in Directives 2009/72/EC and 2009/73/EC, Member States shall ensure, by 31 December 2014 , that billing information is reliable, accurate and based on actual consumption, in accordance with point 1.1 of Annex VII, for electricity and gas, where that is technically possible and economically justified.]

This obligation may be fulfilled by a system of regular self-reading by the final customers whereby they communicate readings from their meter to the energy supplier. Only when the final customer has not provided a meter reading for a given billing interval shall billing be based on estimated consumption or a flat rate.

2.Meters installed in accordance with Directives 2009/72/EC and 2009/73/EC shall enable accurate billing information based on actual consumption. Member States shall ensure that final customers have the possibility of easy access to complementary information on historical consumption allowing detailed self-checks.

Complementary information on historical consumption shall include:

(a)cumulative data for at least the three previous years or the period since the start of the supply contract if this is shorter. The data shall correspond to the intervals for which frequent billing information has been produced; and

(b)detailed data according to the time of use for any day, week, month and year. These data shall be made available to the final customer via the internet or the meter interface for the period of at least the previous 24 months or the period since the start of the supply contract if this is shorter.

3.Independently of whether smart meters have been installed or not, Member States:

(a)shall require that, to the extent that information on the energy billing and historical consumption of final customers is available, it be made available, at the request of the final customer, to an energy service provider designated by the final customer;

(b)shall ensure that final customers are offered the option of electronic billing information and bills and that they receive, on request, a clear and understandable explanation of how their bill was derived, especially where bills are not based on actual consumption;

(c)shall ensure that appropriate information is made available with the bill to provide final customers with a comprehensive account of current energy costs, in accordance with Annex VII;

(d)may lay down that, at the request of the final customer, the information contained in these bills shall not be considered to constitute a request for payment. In such cases, Member States shall ensure that suppliers of energy sources offer flexible arrangements for actual payments;

(e)shall require that information and estimates for energy costs are provided to consumers on demand in a timely manner and in an easily understandable format enabling consumers to compare deals on a like-for-like basis.

[F3Article 10a U.K. Billing and consumption information for heating, cooling and domestic hot water

1. Where meters or heat cost allocators are installed, Member States shall ensure that billing and consumption information is reliable, accurate and based on actual consumption or heat cost allocator readings, in accordance with points 1 and 2 of Annex VIIa for all final users, namely for natural or legal persons purchasing heating, cooling or domestic hot water for their own end-use, or natural or legal persons occupying an individual building or a unit in a multi-apartment or multi-purpose building supplied with heating, cooling or domestic hot water from a central source who has no direct or individual contract with the energy supplier.

This obligation may, where a Member State so provides, save in the case of sub-metered consumption based on heat cost allocators under Article 9b, be fulfilled by a system of regular self-reading by the final customer or final user whereby they communicate readings from their meter. Only where the final customer or final user has not provided a meter reading for a given billing interval shall billing be based on estimated consumption or a flat rate.

2. Member States shall:

(a) require that, if information on the energy billing and historical consumption or heat cost allocator readings of final users is available, it be made available upon request by the final user, to an energy service provider designated by the final user;

(b) ensure that final customers are offered the option of electronic billing information and bills;

(c) ensure that clear and comprehensible information is provided with the bill to all final users in accordance with point 3 of Annex VIIa; and

(d) promote cybersecurity and ensure the privacy and data protection of final users in accordance with applicable Union law.

Member States may provide that, at the request of the final customer, the provision of billing information shall not be considered to constitute a request for payment. In such cases, Member States shall ensure that flexible arrangements for actual payment are offered.

3. Member States shall decide who is to be responsible for providing the information referred to in paragraphs 1 and 2 to final users without a direct or individual contract with an energy supplier.]

[F1Article 11 U.K. Cost of access to metering and billing information for electricity and gas

Member States shall ensure that final customers receive all their bills and billing information for energy consumption free of charge and that final customers have access to their consumption data in an appropriate way and free of charge.]

[F3Article 11a U.K. Cost of access to metering and billing and consumption information for heating, cooling and domestic hot water

1. Member States shall ensure that final users receive all their bills and billing information for energy consumption free of charge and that final users have access to their consumption data in an appropriate way and free of charge.

2. Notwithstanding paragraph 1 of this Article, the distribution of costs of billing information for the individual consumption of heating, cooling and domestic hot water in multi-apartment and multi-purpose buildings pursuant to Article 9b shall be carried out on a non-profit basis. Costs resulting from the assignment of that task to a third party, such as a service provider or the local energy supplier, covering the measuring, allocation and accounting for actual individual consumption in such buildings, may be passed onto the final users to the extent that such costs are reasonable.

3. In order to ensure reasonable costs for sub-metering services as referred to in paragraph 2, Member States may stimulate competition in that service sector by taking appropriate measures, such as recommending or otherwise promoting the use of tendering and/or the use of interoperable devices and systems facilitating switching between service providers.]

Article 12U.K.Consumer information and empowering programme

1.Member States shall take appropriate measures to promote and facilitate an efficient use of energy by small energy customers, including domestic customers. These measures may be part of a national strategy.

2.For the purposes of paragraph 1, these measures shall include one or more of the elements listed under point (a) or (b):

(a)a range of instruments and policies to promote behavioural change which may include:

(i)

fiscal incentives;

(ii)

access to finance, grants or subsidies;

(iii)

information provision;

(iv)

exemplary projects;

(v)

workplace activities;

(b)ways and means to engage consumers and consumer organisations during the possible roll-out of smart meters through communication of:

(i)

cost-effective and easy-to-achieve changes in energy use;

(ii)

information on energy efficiency measures.

Article 13U.K.Penalties

Member States shall lay down the rules on penalties applicable in case of non-compliance with the national provisions adopted pursuant to [F7Articles 7 to 11a] and Article 18(3) and shall take the necessary measures to ensure that they are implemented. The penalties provided for shall be effective, proportionate and dissuasive. Member States shall notify those provisions to the Commission by 5 June 2014 and shall notify it without delay of any subsequent amendment affecting them.

CHAPTER IIIU.K. EFFICIENCY IN ENERGY SUPPLY

Article 14U.K.Promotion of efficiency in heating and cooling

1.By 31 December 2015, Member States shall carry out and notify to the Commission a comprehensive assessment of the potential for the application of high-efficiency cogeneration and efficient district heating and cooling, containing the information set out in Annex VIII. If they have already carried out an equivalent assessment, they shall notify it to the Commission.

The comprehensive assessment shall take full account of the analysis of the national potentials for high-efficiency cogeneration carried out under Directive 2004/8/EC.

At the request of the Commission, the assessment shall be updated and notified to the Commission every five years. The Commission shall make any such request at least one year before the due date.

2.Member States shall adopt policies which encourage the due taking into account at local and regional levels of the potential of using efficient heating and cooling systems, in particular those using high-efficiency cogeneration. Account shall be taken of the potential for developing local and regional heat markets.

3.For the purpose of the assessment referred to in paragraph 1, Member States shall carry out a cost-benefit analysis covering their territory based on climate conditions, economic feasibility and technical suitability in accordance with Part 1 of Annex IX. The cost-benefit analysis shall be capable of facilitating the identification of the most resource-and cost-efficient solutions to meeting heating and cooling needs. That cost-benefit analysis may be part of an environmental assessment under Directive 2001/42/EC of the European Parliament and of the Council of 27 June 2001 on the assessment of the effects of certain plans and programmes on the environment(26).

4.Where the assessment referred to in paragraph 1 and the analysis referred to in paragraph 3 identify a potential for the application of high-efficiency cogeneration and/or efficient district heating and cooling whose benefits exceed the costs, Member States shall take adequate measures for efficient district heating and cooling infrastructure to be developed and/or to accommodate the development of high-efficiency cogeneration and the use of heating and cooling from waste heat and renewable energy sources in accordance with paragraphs 1, 5, and 7.

Where the assessment referred to in paragraph 1 and the analysis referred to in paragraph 3 do not identify a potential whose benefits exceed the costs, including the administrative costs of carrying out the cost-benefit analysis referred to in paragraph 5, the Member State concerned may exempt installations from the requirements laid down in that paragraph.

5.Member States shall ensure that a cost-benefit analysis in accordance with Part 2 of Annex IX is carried out when, after 5 June 2014:

(a)a new thermal electricity generation installation with a total thermal input exceeding 20 MW is planned, in order to assess the cost and benefits of providing for the operation of the installation as a high-efficiency cogeneration installation;

(b)an existing thermal electricity generation installation with a total thermal input exceeding 20 MW is substantially refurbished, in order to assess the cost and benefits of converting it to high-efficiency cogeneration;

(c)an industrial installation with a total thermal input exceeding 20 MW generating waste heat at a useful temperature level is planned or substantially refurbished, in order to assess the cost and benefits of utilising the waste heat to satisfy economically justified demand, including through cogeneration, and of the connection of that installation to a district heating and cooling network;

(d)a new district heating and cooling network is planned or in an existing district heating or cooling network a new energy production installation with a total thermal input exceeding 20 MW is planned or an existing such installation is to be substantially refurbished, in order to assess the cost and benefits of utilising the waste heat from nearby industrial installations.

The fitting of equipment to capture carbon dioxide produced by a combustion installation with a view to its being geologically stored as provided for in Directive 2009/31/EC shall not be considered as refurbishment for the purpose of points (b), (c) and (d) of this paragraph.

Member States may require the cost-benefit analysis referred to in points (c) and (d) to be carried out in cooperation with the companies responsible for the operation of the district heating and cooling networks.

6.Member States may exempt from paragraph 5:

(a)those peak load and back-up electricity generating installations which are planned to operate under 1 500 operating hours per year as a rolling average over a period of five years, based on a verification procedure established by the Member States ensuring that this exemption criterion is met;

(b)nuclear power installations;

(c)installations that need to be located close to a geological storage site approved under Directive 2009/31/EC.

Member States may also lay down thresholds, expressed in terms of the amount of available useful waste heat, the demand for heat or the distances between industrial installations and district heating networks, for exempting individual installations from the provisions of points (c) and (d) of paragraph 5.

Member States shall notify exemptions adopted under this paragraph to the Commission by 31 December 2013 and any subsequent changes to them thereafter.

7.Member States shall adopt authorisation criteria as referred to in Article 7 of Directive 2009/72/EC, or equivalent permit criteria, to:

(a)take into account the outcome of the comprehensive assessment referred to in paragraph 1;

(b)ensure that the requirements of paragraph 5 are fulfilled; and

(c)take into account the outcome of cost-benefit analysis referred to in paragraph 5.

8.Member States may exempt individual installations from being required, by the authorisation and permit criteria referred to in paragraph 7, to implement options whose benefits exceed their costs, if there are imperative reasons of law, ownership or finance for so doing. In these cases the Member State concerned shall submit a reasoned notification of its decision to the Commission within three months of the date of taking it.

9.Paragraphs 5, 6, 7 and 8 of this Article shall apply to installations covered by Directive 2010/75/EU without prejudice to the requirements of that Directive.

10.On the basis of the harmonised efficiency reference values referred to in point (f) of Annex II, Member States shall ensure that the origin of electricity produced from high-efficiency cogeneration can be guaranteed according to objective, transparent and non-discriminatory criteria laid down by each Member State. They shall ensure that this guarantee of origin complies with the requirements and contains at least the information specified in Annex X. Member States shall mutually recognise their guarantees of origin, exclusively as proof of the information referred to in this paragraph. Any refusal to recognise a guarantee of origin as such proof, in particular for reasons relating to the prevention of fraud, must be based on objective, transparent and non-discriminatory criteria. Member States shall notify the Commission of such refusal and its justification. In the event of refusal to recognise a guarantee of origin, the Commission may adopt a decision to compel the refusing party to recognise it, in particular with regard to objective, transparent and non-discriminatory criteria on which such recognition is based.

The Commission shall be empowered to review, by means of delegated acts in accordance with Article 23 of this Directive, the harmonised efficiency reference values laid down in Commission Implementing Decision 2011/877/EU(27) on the basis of Directive 2004/8/EC by 31 December 2014.

11.Member States shall ensure that any available support for cogeneration is subject to the electricity produced originating from high-efficiency cogeneration and the waste heat being effectively used to achieve primary energy savings. Public support to cogeneration and district heating generation and networks shall be subject to State aid rules, where applicable.

Article 15U.K.Energy transformation, transmission and distribution

1.Member States shall ensure that national energy regulatory authorities pay due regard to energy efficiency in carrying out the regulatory tasks specified in Directives 2009/72/EC and 2009/73/EC regarding their decisions on the operation of the gas and electricity infrastructure.

Member States shall in particular ensure that national energy regulatory authorities, through the development of network tariffs and regulations, within the framework of Directive 2009/72/EC and taking into account the costs and benefits of each measure, provide incentives for grid operators to make available system services to network users permitting them to implement energy efficiency improvement measures in the context of the continuing deployment of smart grids.

Such systems services may be determined by the system operator and shall not adversely impact the security of the system.

For electricity, Member States shall ensure that network regulation and network tariffs fulfil the criteria in Annex XI, taking into account guidelines and codes developed pursuant to Regulation (EC) No 714/2009.

2.Member States shall ensure, by 30 June 2015, that:

(a)an assessment is undertaken of the energy efficiency potentials of their gas and electricity infrastructure, in particular regarding transmission, distribution, load management and interoperability, and connection to energy generating installations, including access possibilities for micro energy generators;

(b)concrete measures and investments are identified for the introduction of cost-effective energy efficiency improvements in the network infrastructure, with a timetable for their introduction.

[F32a. By 31 December 2020 , the Commission shall, after consulting relevant stakeholders, prepare a common methodology in order to encourage network operators to reduce losses, implement a cost-efficient and energy-efficient infrastructure investment programme and properly account for the energy efficiency and flexibility of the grid.]

3.Member States may permit components of schemes and tariff structures with a social aim for net-bound energy transmission and distribution, provided that any disruptive effects on the transmission and distribution system are kept to the minimum necessary and are not disproportionate to the social aim.

4.Member States shall ensure the removal of those incentives in transmission and distribution tariffs that are detrimental to the overall efficiency (including energy efficiency) of the generation, transmission, distribution and supply of electricity or those that might hamper participation of demand response, in balancing markets and ancillary services procurement. Member States shall ensure that network operators are incentivised to improve efficiency in infrastructure design and operation, and, within the framework of Directive 2009/72/EC, that tariffs allow suppliers to improve consumer participation in system efficiency, including demand response, depending on national circumstances.

5.[ F8. . . . .

F8. . . . .]

[F7Transmission system operators and distribution system operators shall comply with the requirements set out in Annex XII.]

Member States may particularly facilitate the connection to the grid system of electricity produced from high-efficiency cogeneration from small-scale and micro-cogeneration units. Member States shall, where appropriate, take steps to encourage network operators to adopt a simple notification ‘install and inform’ process for the installation of micro-cogeneration units to simplify and shorten authorisation procedures for individual citizens and installers.

6.Subject to the requirements relating to the maintenance of the reliability and safety of the grid, Member States shall take the appropriate steps to ensure that, where this is technically and economically feasible with the mode of operation of the high-efficiency cogeneration installation, high-efficiency cogeneration operators can offer balancing services and other operational services at the level of transmission system operators or distribution system operators. Transmission system operators and distribution system operators shall ensure that such services are part of a services bidding process which is transparent, non-discriminatory and open to scrutiny.

Where appropriate, Member States may require transmission system operators and distribution system operators to encourage high-efficiency cogeneration to be sited close to areas of demand by reducing the connection and use-of-system charges.

7.Member States may allow producers of electricity from high-efficiency cogeneration wishing to be connected to the grid to issue a call for tender for the connection work.

8.Member States shall ensure that national energy regulatory authorities encourage demand side resources, such as demand response, to participate alongside supply in wholesale and retail markets.

Subject to technical constraints inherent in managing networks, Member States shall ensure that transmission system operators and distribution system operators, in meeting requirements for balancing and ancillary services, treat demand response providers, including aggregators, in a non-discriminatory manner, on the basis of their technical capabilities.

Subject to technical constraints inherent in managing networks, Member States shall promote access to and participation of demand response in balancing, reserve and other system services markets, inter alia by requiring national energy regulatory authorities or, where their national regulatory systems so require, transmission system operators and distribution system operators in close cooperation with demand service providers and consumers, to define technical modalities for participation in these markets on the basis of the technical requirements of these markets and the capabilities of demand response. Such specifications shall include the participation of aggregators.

9.When reporting under Directive 2010/75/EU, and without prejudice to Article 9(2) of that Directive, Member States shall consider including information on energy efficiency levels of installations undertaking the combustion of fuels with total rated thermal input of 50 MW or more in the light of the relevant best available techniques developed in accordance with Directive 2010/75/EU and Directive 2008/1/EC of the European Parliament and of the Council of 15 January 2008 concerning integrated pollution prevention and control(28).

Member States may encourage operators of installations referred to in the first subparagraph to improve their annual average net operational rates.

CHAPTER IVU.K. HORIZONTAL PROVISIONS

Article 16U.K.Availability of qualification, accreditation and certification schemes

1.Where a Member State considers that the national level of technical competence, objectivity and reliability is insufficient, it shall ensure that, by 31 December 2014, certification and/or accreditation schemes and/or equivalent qualification schemes, including, where necessary, suitable training programmes, become or are available for providers of energy services, energy audits, energy managers and installers of energy-related building elements as defined in Article 2(9) of Directive 2010/31/EU.

2.Member States shall ensure that the schemes referred to in paragraph 1 provide transparency to consumers, are reliable and contribute to national energy efficiency objectives.

3.Member States shall make publicly available the certification and/or accreditation schemes or equivalent qualification schemes referred to in paragraph 1 and shall cooperate among themselves and with the Commission on comparisons between, and recognition of, the schemes.

Member States shall take appropriate measures to make consumers aware of the availability of qualification and/or certification schemes in accordance with Article 18(1).

Article 17U.K.Information and training

1.Member States shall ensure that information on available energy efficiency mechanisms and financial and legal frameworks is transparent and widely disseminated to all relevant market actors, such as consumers, builders, architects, engineers, environmental and energy auditors, and installers of building elements as defined in Directive 2010/31/EU.

Member States shall encourage the provision of information to banks and other financial institutions on possibilities of participating, including through the creation of public/private partnerships, in the financing of energy efficiency improvement measures.

2.Member States shall establish appropriate conditions for market operators to provide adequate and targeted information and advice to energy consumers on energy efficiency.

3.The Commission shall review the impact of its measures to support the development of platforms, involving, inter alia, the European social dialogue bodies in fostering training programmes for energy efficiency, and shall bring forward further measures if appropriate. The Commission shall encourage European social partners in their discussions on energy efficiency.

4.Member States shall, with the participation of stakeholders, including local and regional authorities, promote suitable information, awareness-raising and training initiatives to inform citizens of the benefits and practicalities of taking energy efficiency improvement measures.

5.The Commission shall encourage the exchange and wide dissemination of information on best energy efficiency practices in Member States.

Article 18U.K.Energy services

1.Member States shall promote the energy services market and access for SMEs to this market by:

(a)disseminating clear and easily accessible information on:

(i)

available energy service contracts and clauses that should be included in such contracts to guarantee energy savings and final customers’ rights;

(ii)

financial instruments, incentives, grants and loans to support energy efficiency service projects;

(b)encouraging the development of quality labels, inter alia, by trade associations;

(c)making publicly available and regularly updating a list of available energy service providers who are qualified and/or certified and their qualifications and/or certifications in accordance with Article 16, or providing an interface where energy service providers can provide information;

(d)supporting the public sector in taking up energy service offers, in particular for building refurbishment, by:

(i)

providing model contracts for energy performance contracting which include at least the items listed in Annex XIII;

(ii)

providing information on best practices for energy performance contracting, including, if available, cost-benefit analysis using a life-cycle approach[F9.]

[F4((e)] F4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2.Member States shall support the proper functioning of the energy services market, where appropriate, by:

(a)identifying and publicising point(s) of contact where final customers can obtain the information referred to in paragraph 1;

(b)taking, if necessary, measures to remove the regulatory and non-regulatory barriers that impede the uptake of energy performance contracting and other energy efficiency service models for the identification and/or implementation of energy saving measures;

(c)considering putting in place or assigning the role of an independent mechanism, such as an ombudsman, to ensure the efficient handling of complaints and out-of-court settlement of disputes arising from energy service contracts;

(d)enabling independent market intermediaries to play a role in stimulating market development on the demand and supply sides.

3.Member States shall ensure that energy distributors, distribution system operators and retail energy sales companies refrain from any activities that may impede the demand for and delivery of energy services or other energy efficiency improvement measures, or hinder the development of markets for such services or measures, including foreclosing the market for competitors or abusing dominant positions.

Article 19U.K.Other measures to promote energy efficiency

1.Member States shall evaluate and if necessary take appropriate measures to remove regulatory and non-regulatory barriers to energy efficiency, without prejudice to the basic principles of the property and tenancy law of the Member States, in particular as regards:

(a)the split of incentives between the owner and the tenant of a building or among owners, with a view to ensuring that these parties are not deterred from making efficiency-improving investments that they would otherwise have made by the fact that they will not individually obtain the full benefits or by the absence of rules for dividing the costs and benefits between them, including national rules and measures regulating decision- making processes in multi-owner properties;

(b)legal and regulatory provisions, and administrative practices, regarding public purchasing and annual budgeting and accounting, with a view to ensuring that individual public bodies are not deterred from making investments in improving energy efficiency and minimising expected life-cycle costs and from using energy performance contracting and other third-party financing mechanisms on a long-term contractual basis.

Such measures to remove barriers may include providing incentives, repealing or amending legal or regulatory provisions, or adopting guidelines and interpretative communications, or simplifying administrative procedures. The measures may be combined with the provision of education, training and specific information and technical assistance on energy efficiency.

2.The evaluation of barriers and measures referred to in paragraph 1 shall be notified to the Commission in the first National Energy Efficiency Action Plan referred to in Article 24(2). The Commission shall encourage the sharing of national best practices in this regard.

Article 20U.K.Energy Efficiency National Fund, Financing and Technical Support

1.Without prejudice to Articles 107 and 108 of the Treaty on the Functioning of the European Union, Member States shall facilitate the establishment of financing facilities, or use of existing ones, for energy efficiency improvement measures to maximise the benefits of multiple streams of financing.

2.The Commission shall, where appropriate, directly or via the European financial institutions, assist Member States in setting up financing facilities and technical support schemes with the aim of increasing energy efficiency in different sectors.

3.The Commission shall facilitate the exchange of best practice between the competent national or regional authorities or bodies, e.g. through annual meetings of the regulatory bodies, public databases with information on the implementation of measures by Member States, and country comparison.

[F33a. In order to mobilise private financing for energy efficiency measures and energy renovation, in accordance with Directive 2010/31/EU, the Commission shall conduct a dialogue with both public and private financial institutions in order to map out possible actions it can take.

3b. The actions referred to in paragraph 3a shall include the following:

(a) mobilising capital investment into energy efficiency by considering the wider impacts of energy savings for financial risk management;

(b) ensuring better energy and finance performance data by:

(i)

examining further how energy efficiency investments improve underlying asset values;

(ii)

supporting studies to assess the monetisation of the non-energy benefits of energy efficiency investments.

3c. For the purpose of mobilising private financing of energy efficiency measures and energy renovation, Member States shall, when implementing this Directive:

(a) consider ways to make better use of energy audits under Article 8 to influence decision-making;

(b) make optimal use of the possibilities and tools proposed in the smart finance for smart buildings initiative.

3d. By 1 January 2020 , the Commission shall provide guidance for Member States on how to unlock private investment.]

4.Member States may set up an Energy Efficiency National Fund. The purpose of this fund shall be to support national energy efficiency initiatives.

5.Member States may allow for the obligations set out in Article 5(1) to be fulfilled by annual contributions to the Energy Efficiency National Fund of an amount equal to the investments required to achieve those obligations.

6.Member States may provide that obligated parties can fulfil their obligations set out in Article 7(1) by contributing annually to the Energy Efficiency National Fund an amount equal to the investments required to achieve those obligations.

7.Member States may use their revenues from annual emission allocations under Decision No 406/2009/EC for the development of innovative financing mechanisms to give practical effect to the objective in Article 5 of improving the energy performance of buildings.

Article 21U.K.Conversion factors

For the purpose of comparison of energy savings and conversion to a comparable unit, the conversion factors set out in Annex IV shall apply unless the use of other conversion factors can be justified.

CHAPTER VU.K. FINAL PROVISIONS

Article 22U.K.Delegated acts

1.The Commission shall be empowered to adopt delegated acts in accordance with Article 23 to review the harmonised efficiency reference values referred to in the second subparagraph of Article 14(10).

[F12. The Commission is empowered to adopt delegated acts in accordance with Article 23 to amend this Directive by adapting to technical progress the values, calculation methods, default primary energy coefficient and requirements in Annexes I to V, VII to X, and XII.]

Article 23U.K.Exercise of the delegation

1.The power to adopt delegated acts is conferred on the Commission subject to the conditions laid down in this Article.

[F12. The power to adopt delegated acts referred to in Article 22 shall be conferred on the Commission for a period of five years from 24 December 2018 . The Commission shall draw up a report in respect of the delegation of power not later than nine months before the end of the five-year period. The delegation of power shall be tacitly extended for periods of an identical duration, unless the European Parliament or the Council opposes such extension not later than three months before the end of each period.]

3.The delegation of power referred to in Article 22 may be revoked at any time by the European Parliament or by the Council. A decision to revoke shall put an end to the delegation of the power specified in that decision. It shall take effect the day following the publication of the decision in the Official Journal of the European Union or at a later date specified therein. It shall not affect the validity of any delegated acts already in force.

[F33a. Before adopting a delegated act, the Commission shall consult experts designated by each Member State in accordance with the principles laid down in the Interinstitutional Agreement of 13 April 2016 on Better Law-Making (29) .]

4.As soon as it adopts a delegated act, the Commission shall notify it simultaneously to the European Parliament and to the Council.

5.A delegated act adopted pursuant to Article 22 shall enter into force only if no objection has been expressed either by the European Parliament or the Council within a period of two months of notification of that act to the European Parliament and the Council or if, before the expiry of that period, the European Parliament and the Council have both informed the Commission that they will not object. That period shall be extended by two months at the initiative of the European Parliament or of the Council.

Article 24U.K.Review and monitoring of implementation

1.By 30 April each year as from 2013, Member States shall report on the progress achieved towards national energy efficiency targets, in accordance with Part 1 of Annex XIV. The report may form part of the National Reform Programmes referred to in Council Recommendation 2010/410/EU of 13 July 2010 on broad guidelines for the economic policies of the Member States and of the Union(30).

F42.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3.The Commission shall evaluate the annual reports and the National Energy Efficiency Action Plans and assess the extent to which Member States have made progress towards the achievement of the national energy efficiency targets required by Article 3(1) and towards the implementation of this Directive. The Commission shall send its assessment to the European Parliament and the Council. Based on its assessment of the reports and the National Energy Efficiency Action Plans, the Commission may issue recommendations to Member States.

4.The Commission shall monitor the impact of implementing this Directive on Directives 2003/87/EC, 2009/28/EC and 2010/31/EU and Decision No 406/2009/EC, and on industry sectors, in particular those that are exposed to a significant risk of carbon leakage as determined in Decision 2010/2/EU.

[F34a. In the context of the State of the Energy Union report, the Commission shall report on the functioning of the carbon market in accordance with Article 35(1) and point (c) of Article 35(2) of Regulation (EU) 2018/1999, taking into consideration the effects of the implementation of this Directive.]

5.The Commission shall review the continued need for the possibility of exemptions set out in Article 14(6) for the first time in the assessment of the first National Energy Efficiency Action Plan and every three years thereafter. Where the review shows that any of the criteria for these exemptions can no longer be justified taking into account the availability of heat load and the real operating conditions of the exempted installations, the Commission shall propose appropriate measures.

6.Member States shall submit to the Commission before 30 April each year statistics on national electricity and heat production from high and low efficiency cogeneration, in accordance with the methodology shown in Annex I, in relation to total heat and electricity production. They shall also submit annual statistics on cogeneration heat and electricity capacities and fuels for cogeneration, and on district heating and cooling production and capacities, in relation to total heat and electricity production and capacities. Member States shall submit statistics on primary energy savings achieved by application of cogeneration in accordance with the methodology shown in Annex II.

7.By 30 June 2014 the Commission shall submit the assessment referred to in Article 3(2) to the European Parliament and to the Council, accompanied, if necessary, by proposals for further measures.

8.The Commission shall review the effectiveness of the implementation of Article 6 by 5 December 2015, taking into account the requirements laid down in Directive 2004/18/EC and shall submit a report to the European Parliament and the Council. That report shall be accompanied, if appropriate, by proposals for further measures.

9.By 30 June 2016, the Commission shall submit a report to the European Parliament and the Council on the implementation of Article 7. That report shall be accompanied, if appropriate, by a legislative proposal for one or more of the following purposes:

(a)to change the final date laid down in Article 7(1);

(b)to review the requirements laid down in Article 7(1), (2) and (3);

(c)to establish additional common requirements, in particular as regards the matters referred to in Article 7(7).

10.By 30 June 2018, the Commission shall assess the progress made by Member States in removing the regulatory and non-regulatory barriers referred to in Article 19(1). This assessment shall be followed, if appropriate, by proposals for further measures.

11.The Commission shall make the reports referred to in paragraphs 1 and 2 publicly available.

[F312. By 31 December 2019 , the Commission shall assess the effectiveness of the implementation of the definition of small and medium-sized enterprises for the purposes of Article 8(4), and shall submit a report to the European Parliament and to the Council. As soon as possible after submission of that report, the Commission shall, if appropriate, adopt legislative proposals.

13. By 1 January 2021 , the Commission shall carry out an assessment of the potential for energy efficiency in conversion, transformation, transmission, transportation and storage of energy, and shall submit a report to the European Parliament and to the Council. That report shall, if appropriate, be accompanied by legislative proposals.

14. By 31 December 2021 , the Commission, shall, unless changes to the retail market provisions of Directive 2009/73/EC on common rules for the internal market in gas have meanwhile been proposed, carry out an assessment, and submit a report to the European Parliament and to the Council, on the provisions related to metering, billing and consumer information for natural gas, with the aim of aligning them, where appropriate, with the relevant provisions for electricity in Directive 2009/72/EC, in order to strengthen consumer protection and enable final customers to receive more frequent, clear and up-to-date information about their natural gas consumption and to regulate their energy use. As soon as possible after submission of that report, the Commission shall, if appropriate, adopt legislative proposals.

15. By 28 February 2024 , and every five years thereafter, the Commission shall evaluate this Directive and submit a report to the European Parliament and to the Council.

That evaluation shall include:

(a) an examination of whether to adapt, after 2030, the requirements and the alternative approach laid down in Article 5;

(b) an assessment of the general effectiveness of this Directive and the need to adjust further the Union's energy efficiency policy in accordance with the objectives of the 2015 Paris Agreement on climate change following the 21st Conference of the Parties to the United Nations Framework Convention on Climate Change (31) and in the light of economic and innovation developments.

That report shall be accompanied, if appropriate, by proposals for further measures.]

Article 25U.K.Online platform

The Commission shall establish an online platform in order to foster the practical implementation of this Directive at national, regional and local levels. That platform shall support the exchange of experiences on practices, benchmarking, networking activities, as well as innovative practices.

Article 26U.K.Committee procedure

1.The Commission shall be assisted by a committee. That committee shall be a committee within the meaning of Regulation (EU) No 182/2011.

2.Where reference is made to this paragraph, Article 4 of Regulation (EU) No 182/2011 shall apply.

Article 27U.K.Amendments and repeals

1.Directive 2006/32/EC is repealed from 5 June 2014, except for Article 4(1) to (4) thereof and Annexes I, III and IV thereto, without prejudice to the obligations of the Member States relating to the time-limit for its transposition into national law. Article 4(1) to (4) of, and Annexes I, III and IV to Directive 2006/32/EC shall be repealed with effect from 1 January 2017.

Directive 2004/8/EC is repealed from 5 June 2014, without prejudice to the obligations of the Member States relating to the time-limit for its transposition into national law.

References to Directives 2006/32/EC and 2004/8/EC shall be construed as references to this Directive and shall be read in accordance with the correlation table set out in Annex XV.

2.Article 9(1) and (2) of Directive 2010/30/EU is deleted from 5 June 2014.

3.Directive 2009/125/EC is amended as follows:

(1)

the following recital is inserted:

(35a)Directive 2010/31/EU of the European Parliament and of the Council of 19 May 2010 on the energy performance of buildings(32) requires Member States to set energy performance requirements for building elements that form part of the building envelope and system requirements in respect of the overall energy performance, the proper installation, and the appropriate dimensioning, adjustment and control of the technical building systems which are installed in existing buildings. It is consistent with the objectives of this Directive that these requirements may in certain circumstances limit the installation of energy-related products which comply with this Directive and its implementing measures, provided that such requirements do not constitute an unjustifiable market barrier.;

(2)

the following sentence is added to the end of Article 6(1):

This shall be without prejudice to the energy performance requirements and system requirements set by Member States in accordance with Article 4(1) and Article 8 of Directive 2010/31/EU..

Article 28U.K.Transposition

1.Member States shall bring into force the laws, regulations and administrative provisions necessary to comply with this Directive by 5 June 2014.

Notwithstanding the first subparagraph, Member States shall bring into force the laws, regulations and administrative provisions necessary to comply with Article 4, the first subparagraph of Article 5(1), Article 5(5), Article 5(6), the last subparagraph of Article 7(9), Article 14(6), Article 19(2), Article 24(1) and Article 24(2) and point (4) of Annex V by the dates specified therein.

They shall forthwith communicate to the Commission the text of those provisions.

When Member States adopt those provisions, they shall contain a reference to this Directive or be accompanied by such a reference on the occasion of their official publication. Member States shall determine how such reference is to be made.

2.Member States shall communicate to the Commission the text of the main provisions of national law which they adopt in the field covered by this Directive.

Article 29U.K.Entry into force

This Directive shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.

Article 30U.K.Addressees

This Directive is addressed to the Member States.

ANNEX IU.K. GENERAL PRINCIPLES FOR THE CALCULATION OF ELECTRICITY FROM COGENERATION

Part I U.K. General principles

Values used for calculation of electricity from cogeneration shall be determined on the basis of the expected or actual operation of the unit under normal conditions of use. For micro- cogeneration units the calculation may be based on certified values.

(a)

Electricity production from cogeneration shall be considered equal to total annual electricity production of the unit measured at the outlet of the main generators;

(i)

in cogeneration units of types (b), (d), (e), (f), (g) and (h) referred to in Part II with an annual overall efficiency set by Member States at a level of at least 75 %, and

(ii)

in cogeneration units of types (a) and (c) referred to in Part II with an annual overall efficiency set by Member States at a level of at least 80 %.

(b)

In cogeneration units with an annual overall efficiency below the value referred to in point (i) of point (a) (cogeneration units of types (b), (d), (e), (f), (g), and (h) referred to in Part II) or with an annual overall efficiency below the value referred to in point (ii) of point (a) (cogeneration units of types (a) and (c) referred to in Part II) cogeneration is calculated according to the following formula:

ECHP=HCHP*C

where:

  • ECHP is the amount of electricity from cogeneration;

  • C is the power-to-heat ratio;

  • HCHP is the amount of useful heat from cogeneration (calculated for this purpose as total heat production minus any heat produced in separate boilers or by live steam extraction from the steam generator before the turbine).

The calculation of electricity from cogeneration must be based on the actual power-to-heat ratio. If the actual power-to-heat ratio of a cogeneration unit is not known, the following default values may be used, in particular for statistical purposes, for units of types (a), (b), (c), (d) and (e) referred to in Part II provided that the calculated cogeneration electricity is less or equal to total electricity production of the unit:

Type of the unitDefault power to heat ratio, C
Combined cycle gas turbine with heat recovery0,95
Steam back pressure turbine0,45
Steam condensing extraction turbine0,45
Gas turbine with heat recovery0,55
Internal combustion engine0,75

If Member States introduce default values for power-to-heat ratios for units of types (f), (g), (h), (i), (j) and (k) referred to in Part II, such default values shall be published and shall be notified to the Commission.

(c)

If a share of the energy content of the fuel input to the cogeneration process is recovered in chemicals and recycled this share can be subtracted from the fuel input before calculating the overall efficiency used in points (a) and (b).

(d)

Member States may determine the power-to-heat ratio as the ratio of electricity to useful heat when operating in cogeneration mode at a lower capacity using operational data of the specific unit.

(e)

Member States may use other reporting periods than one year for the purpose of the calculations according to points (a) and (b).

Part II U.K. Cogeneration technologies covered by this Directive

(a)Combined cycle gas turbine with heat recoveryU.K.

(b)Steam back pressure turbineU.K.

(c)Steam condensing extraction turbineU.K.

(d)Gas turbine with heat recoveryU.K.

(e)Internal combustion engineU.K.

(f)MicroturbinesU.K.

(g)Stirling enginesU.K.

(h)Fuel cellsU.K.

(i)Steam enginesU.K.

(j)Organic Rankine cyclesU.K.

(k)Any other type of technology or combination thereof falling under the definition laid down in Article 2(30).U.K.

When implementing and applying the general principles for the calculation of electricity from cogeneration, Member States shall use the detailed Guidelines established by Commission Decision 2008/952/EC of 19 November 2008 establishing detailed guidelines for the implementation and application of Annex II to Directive 2004/8/EC of the European Parliament and of the Council(33).

ANNEX IIU.K. METHODOLOGY FOR DETERMINING THE EFFICIENCY OF THE COGENERATION PROCESS

Values used for calculation of efficiency of cogeneration and primary energy savings shall be determined on the basis of the expected or actual operation of the unit under normal conditions of use.

(a)High-efficiency cogenerationU.K.

For the purpose of this Directive high-efficiency cogeneration shall fulfil the following criteria:

  • cogeneration production from cogeneration units shall provide primary energy savings calculated according to point (b) of at least 10 % compared with the references for separate production of heat and electricity,

  • production from small-scale and micro-cogeneration units providing primary energy savings may qualify as high-efficiency cogeneration.

(b)Calculation of primary energy savingsU.K.

The amount of primary energy savings provided by cogeneration production defined in accordance with Annex I shall be calculated on the basis of the following formula:

Where:

  • PES is primary energy savings.

  • CHP Hη is the heat efficiency of the cogeneration production defined as annual useful heat output divided by the fuel input used to produce the sum of useful heat output and electricity from cogeneration.

  • Ref Hη is the efficiency reference value for separate heat production.

  • CHP Eη is the electrical efficiency of the cogeneration production defined as annual electricity from cogeneration divided by the fuel input used to produce the sum of useful heat output and electricity from cogeneration. Where a cogeneration unit generates mechanical energy, the annual electricity from cogeneration may be increased by an additional element representing the amount of electricity which is equivalent to that of mechanical energy. This additional element does not create a right to issue guarantees of origin in accordance with Article 14(10).

  • Ref Eη is the efficiency reference value for separate electricity production.

(c)Calculations of energy savings using alternative calculationU.K.

Member States may calculate primary energy savings from a production of heat and electricity and mechanical energy as indicated below without applying Annex I to exclude the non-cogenerated heat and electricity parts of the same process. Such a production can be regarded as high-efficiency cogeneration provided it fulfils the efficiency criteria in point (a) of this Annex and, for cogeneration units with an electrical capacity larger than 25 MW, the overall efficiency is above 70 %. However, specification of the quantity of electricity from cogeneration produced in such a production, for issuing a guarantee of origin and for statistical purposes, shall be determined in accordance with Annex I.

If primary energy savings for a process are calculated using alternative calculation as indicated above the primary energy savings shall be calculated using the formula in point (b) of this Annex replacing: ‘CHP Hη’ with ‘Hη’ and ‘CHP Eη’ with ‘Eη’, where:

Hη shall mean the heat efficiency of the process, defined as the annual heat output divided by the fuel input used to produce the sum of heat output and electricity output.

Eη shall mean the electricity efficiency of the process, defined as the annual electricity output divided by the fuel input used to produce the sum of heat output and electricity output. Where a cogeneration unit generates mechanical energy, the annual electricity from cogeneration may be increased by an additional element representing the amount of electricity which is equivalent to that of mechanical energy. This additional element will not create a right to issue guarantees of origin in accordance with Article 14(10).

(d)Member States may use other reporting periods than one year for the purpose of the calculations according to points (b) and (c) of this Annex.U.K.

(e)For micro-cogeneration units the calculation of primary energy savings may be based on certified data.U.K.

(f)Efficiency reference values for separate production of heat and electricityU.K.

The harmonised efficiency reference values shall consist of a matrix of values differentiated by relevant factors, including year of construction and types of fuel, and must be based on a well-documented analysis taking, inter alia, into account data from operational use under realistic conditions, fuel mix and climate conditions as well as applied cogeneration technologies.

The efficiency reference values for separate production of heat and electricity in accordance with the formula set out in point (b) shall establish the operating efficiency of the separate heat and electricity production that cogeneration is intended to substitute.

The efficiency reference values shall be calculated according to the following principles:

1.

For cogeneration units the comparison with separate electricity production shall be based on the principle that the same fuel categories are compared.

2.

Each cogeneration unit shall be compared with the best available and economically justifiable technology for separate production of heat and electricity on the market in the year of construction of the cogeneration unit.

3.

The efficiency reference values for cogeneration units older than 10 years of age shall be fixed on the reference values of units of 10 years of age.

4.

The efficiency reference values for separate electricity production and heat production shall reflect the climatic differences between Member States.

ANNEX IIIU.K. ENERGY EFFICIENCY REQUIREMENTS FOR PURCHASING PRODUCTS, SERVICES AND BUILDINGS BY CENTRAL GOVERNMENT

Central governments that purchase products, services or buildings, insofar as this is consistent with cost-effectiveness, economical feasibility, wider sustainability, technical suitability, as well as sufficient competition, shall:

(a)

where a product is covered by a delegated act adopted under Directive 2010/30/EU or by a related Commission implementing directive, purchase only the products that comply with the criterion of belonging to the highest energy efficiency class possible in the light of the need to ensure sufficient competition;

(b)

where a product not covered under point (a) is covered by an implementing measure under Directive 2009/125/EC adopted after the entry into force of this Directive, purchase only products that comply with energy efficiency benchmarks specified in that implementing measure;

(c)

purchase office equipment products covered by Council Decision 2006/1005/EC of 18 December 2006 concerning conclusion of the Agreement between the Government of the United States of America and the European Community on the coordination of energy-efficiency labelling programmes for office equipment(34) that comply with energy efficiency requirements not less demanding than those listed in Annex C to the Agreement attached to that Decision;

(d)

purchase only tyres that comply with the criterion of having the highest fuel energy efficiency class, as defined by Regulation (EC) No 1222/2009 of the European Parliament and of the Council of 25 November 2009 on the labelling of tyres with respect to fuel efficiency and other essential parameters(35). This requirement shall not prevent public bodies from purchasing tyres with the highest wet grip class or external rolling noise class where justified by safety or public health reasons;

(e)

require in their tenders for service contracts that service providers use, for the purposes of providing the services in question, only products that comply with the requirements referred to in points (a) to (d), when providing the services in question. This requirement shall apply only to new products purchased by service providers partially or wholly for the purpose of providing the service in question;

(f)

purchase, or make new rental agreements for, only buildings that comply at least with the minimum energy performance requirements referred to in Article 5(1) unless the purpose of the purchase is:

(i)

to undertake deep renovation or demolition;

(ii)

in the case of public bodies, to re-sell the building without using it for public body’s own purposes; or

(iii)

to preserve it as a building officially protected as part of a designated environment, or because of its special architectural or historical merit.

Compliance with these requirements shall be verified by means of the energy performance certificates referred to in Article 11 of Directive 2010/31/EU.

ANNEX IVU.K.

ENERGY CONTENT OF SELECTED FUELS FOR END USE – CONVERSION TABLE (36) U.K.

a

93 % methane.

b

Member States may apply other values depending on the type of wood most used in the respective Member State.

c

[F1Applicable when energy savings are calculated in primary energy terms using a bottom-up approach based on final energy consumption. For savings in kWh electricity, Member States shall apply a coefficient established through a transparent methodology on the basis of national circumstances affecting primary energy consumption, in order to ensure a precise calculation of real savings. Those circumstances shall be substantiated, verifiable and based on objective and non-discriminatory criteria. For savings in kWh electricity, Member States may apply a default coefficient of 2,1 or use the discretion to define a different coefficient, provided that they can justify it. When doing so, Member States shall take into account the energy mix included in their integrated national energy and climate plans to be notified to the Commission in accordance with Regulation (EU) 2018/1999. By 25 December 2022 and every four years thereafter, the Commission shall revise the default coefficient on the basis of observed data. That revision shall be carried out taking into account its effects on other Union law such as Directive 2009/125/EC and Regulation (EU) 2017/1369 of the European Parliament and of the Council of 4 July 2017 setting a framework for energy labelling and repealing Directive 2010/30/EU ( OJ L 198, 28.7.2017, p. 1 ).]

Source: Eurostat.

Energy commoditykJ (NCV)kgoe (NCV)kWh (NCV)
1 kg coke28 5000,6767,917
1 kg hard coal17 200 — 30 7000,411 — 0,7334,778 — 8,528
1 kg brown coal briquettes20 0000,4785,556
1 kg black lignite10 500 — 21 0000,251 — 0,5022,917 — 5,833
1 kg brown coal5 600 — 10 5000,134 — 0,2511,556 — 2,917
1 kg oil shale8 000 — 9 0000,191 — 0,2152,222 — 2,500
1 kg peat7 800 — 13 8000,186 — 0,3302,167 — 3,833
1 kg peat briquettes16 000 — 16 8000,382 — 0,4014,444 — 4,667
1 kg residual fuel oil (heavy oil)40 0000,95511,111
1 kg light fuel oil42 3001,0111,75
1 kg motor spirit (petrol)44 0001,05112,222
1 kg paraffin40 0000,95511,111
1 kg liquefied petroleum gas46 0001,09912,778
1 kg natural gasa47 2001,12613,1
1 kg liquefied natural gas45 1901,07912,553
1 kg wood (25 % humidity)b13 8000,333,833
1 kg pellets/wood bricks16 8000,4014,667
1 kg waste7 400 — 10 7000,177 — 0,2562,056 — 2,972
1 MJ derived heat1 0000,0240,278
1 kWh electrical energy3 6000,0861c

[F1ANNEX V U.K. Common methods and principles for calculating the impact of energy efficiency obligation schemes or other policy measures under Articles 7, 7a and 7b and Article 20(6)

1. Methods for calculating energy savings other than those arising from taxation measures for the purposes of Articles 7, 7a and 7b and Article 20(6). U.K.

Obligated, participating or entrusted parties, or implementing public authorities, may use the following methods for calculating energy savings:

(a)

deemed savings, by reference to the results of previous independently monitored energy improvements in similar installations. The generic approach is termed ex ante ;

(b)

metered savings, whereby the savings from the installation of a measure, or package of measures, are determined by recording the actual reduction in energy use, taking due account of factors such as additionality, occupancy, production levels and the weather which may affect consumption. The generic approach is termed ex post ;

(c)

scaled savings, whereby engineering estimates of savings are used. This approach may be used only where establishing robust measured data for a specific installation is difficult or disproportionately expensive, e.g. replacing a compressor or electric motor with a different kWh rating from that for which independent information about savings has been measured, or where those estimates are carried out on the basis of nationally established methodologies and benchmarks by qualified or accredited experts that are independent of the obligated, participating or entrusted parties involved;

(d)

surveyed savings, where consumers' response to advice, information campaigns, labelling or certification schemes or smart metering is determined. This approach may be used only for savings resulting from changes in consumer behaviour. It shall not be used for savings resulting from the installation of physical measures.

2. In determining the energy savings for an energy efficiency measure for the purposes of Articles 7, 7a and 7b and Article 20(6), the following principles apply: U.K.

(a)

The savings shall be shown to be additional to those that would have occurred in any event without the activity of the obligated, participating or entrusted parties, or implementing public authorities. To determine the savings that can be claimed as additional, Member States shall have regard to how energy use and demand would evolve in the absence of the policy measure in question by taking into account at least the following factors: energy consumption trends, changes in consumer behaviour, technological progress and changes caused by other measures implemented at Union and national level.

(b)

Savings resulting from the implementation of mandatory Union law shall be considered to be savings that would have occurred in any event, and thus shall not be claimed as energy savings for the purpose of Article 7(1). By way of derogation from that requirement, savings related to the renovation of existing buildings may be claimed as energy savings for the purpose of Article 7(1), provided that the materiality criterion referred to in point 3(h) of this Annex is ensured. Savings resulting from the implementation of national minimum requirements established for new buildings prior to the transposition of Directive 2010/31/EU can be claimed as energy savings for the purpose of point (a) of Article 7(1), provided that the materiality criterion referred to in point 3(h) of this Annex is ensured and those savings have been notified by Member States in their National Energy Efficiency Action Plans in accordance with Article 24(2).

(c)

Credit may be given only for savings exceeding the following levels:

(i)

Union emission performance standards for new passenger cars and new light commercial vehicles following the implementation of Regulations (EC) No 443/2009 (37) and (EU) No 510/2011 of the European Parliament and of the Council (38) ;

(ii)

Union requirements relating to the removal from the market of certain energy related products following the implementation of implementing measures under Directive 2009/125/EC.

(d)

Policies with the purpose of encouraging higher levels of energy efficiency of products, equipment, transport systems, vehicles and fuels, buildings and building elements, processes or markets shall be permitted.

(e)

Measures promoting the installation of small-scale renewable energy technologies on or in buildings may be eligible to be taken into account for the fulfilment of energy savings required under Article 7(1), provided that they result in verifiable, and measurable or estimable, energy savings. The calculation of energy savings shall comply with the requirements of this Annex.

(f)

For policies that accelerate the uptake of more efficient products and vehicles, full credit may be claimed, provided that it is shown that such uptake takes place before expiry of the average expected lifetime of the product or vehicle, or before the product or vehicle would usually be replaced, and the savings are claimed only for the period until end of the average expected lifetime of the product or vehicle to be replaced.

(g)

In promoting the uptake of energy efficiency measures, Member States shall, where relevant, ensure that quality standards for products, services and installation of measures are maintained or introduced where such standards do not exist.

(h)

To account for climatic variations between regions, Member States may choose to adjust the savings to a standard value or to accord different energy savings in accordance with temperature variations between regions.

(i)

The calculation of energy savings shall take into account the lifetime of the measures and the rate at which the savings decline over time. That calculation shall count the savings each individual action will achieve during the period from its date of implementation to 31 December 2020 or 31 December 2030 as appropriate. Alternatively, Member States may adopt another method that is estimated to achieve at least the same total quantity of savings. When using another method, Member States shall ensure that the total amount of energy savings calculated using that method does not exceed the amount of energy savings that would have been the result of their calculation when counting the savings each individual action will achieve during the period from its date of implementation to 31 December 2020 or 31 December 2030 as appropriate. Member States shall describe in detail in their integrated national energy and climate plans under Regulation (EU) 2018/1999 the other method and the provisions made to ensure that the binding calculation requirement is met.

3. Member States shall ensure that the following requirements for policy measures taken pursuant to Article 7b and Article 20(6) are met: U.K.

(a)

policy measures and individual actions produce verifiable end-use energy savings;

(b)

the responsibility of each participating party, entrusted party or implementing public authority, as relevant, is clearly defined;

(c)

the energy savings that are achieved or are to be achieved are determined in a transparent manner;

(d)

the amount of energy savings required or to be achieved by the policy measure is expressed in either final or primary energy consumption, using the conversion factors set out in Annex IV;

(e)

an annual report on the energy savings achieved by entrusted parties, participating parties and implementing public authorities be provided and made publicly available, as well as data on the annual trend of energy savings;

(f)

monitoring of the results and taking appropriate measures if progress is not satisfactory;

(g)

the energy savings from an individual action are not claimed by more than one party;

(h)

the activities of the participating party, entrusted party or implementing public authority are shown to be material to the achievement of the energy savings claimed.

4. In determining the energy saving from taxation related policy measures introduced under Article 7b, the following principles shall apply: U.K.

(a)

credit shall be given only for energy savings from taxation measures exceeding the minimum levels of taxation applicable to fuels as required in Council Directive 2003/96/EC (39) or 2006/112/EC (40) ;

(b)

price elasticities for the calculation of the impact of the (energy) taxation measures shall represent the responsiveness of energy demand to price changes, and shall be estimated on the basis of recent and representative official data sources;

(c)

the energy savings from accompanying taxation policy instruments, including fiscal incentives or payment to a fund, shall be accounted separately.

5. Notification of methodology U.K.

Member States shall in accordance with Regulation (EU) 2018/1999 notify to the Commission their proposed detailed methodology for the operation of the energy efficiency obligation schemes and alternative measures referred to in Articles 7a and 7b, and Article 20(6). Except in the case of taxation, such notification shall include details of:

(a)

the level of the energy savings required under point (b) of the first subparagraph of Article 7(1) or savings expected to be achieved over the whole period from 1 January 2021 to 31 December 2030 ;

(b)

the obligated, participating or entrusted parties, or implementing public authorities;

(c)

target sectors;

(d)

policy measures and individual actions, including the expected total amount of cumulative energy savings for each measure;

(e)

the duration of the obligation period for the energy efficiency obligation scheme;

(f)

the actions provided for by the policy measure;

(g)

the calculation methodology, including how additionality and materiality have been determined and which methodologies and benchmarks are used for deemed and scaled savings;

(h)

the lifetimes of measures, and how they are calculated or what they are based upon;

(i)

the approach taken to address climatic variations within the Member State;

(j)

the monitoring and verification systems for measures under Articles 7a and 7b and how their independence from the obligated, participating or entrusted parties is ensured;

(k)

in the case of taxation:

(i)

the target sectors and segment of taxpayers;

(ii)

the implementing public authority;

(iii)

the savings expected to be achieved;

(iv)

the duration of the taxation measure; and

(v)

the calculation methodology, including the price elasticities used and how they have been established.]

ANNEX VIU.K. Minimum criteria for energy audits including those carried out as part of energy management systems

The energy audits referred to in Article 8 shall be based on the following guidelines:

(a)

be based on up-to-date, measured, traceable operational data on energy consumption and (for electricity) load profiles;

(b)

comprise a detailed review of the energy consumption profile of buildings or groups of buildings, industrial operations or installations, including transportation;

(c)

build, whenever possible, on life-cycle cost analysis (LCCA) instead of Simple Payback Periods (SPP) in order to take account of long-term savings, residual values of long-term investments and discount rates;

(d)

be proportionate, and sufficiently representative to permit the drawing of a reliable picture of overall energy performance and the reliable identification of the most significant opportunities for improvement.

Energy audits shall allow detailed and validated calculations for the proposed measures so as to provide clear information on potential savings.

The data used in energy audits shall be storable for historical analysis and tracking performance.

ANNEX VIIU.K. [F1Minimum requirements for billing and billing information based on actual consumption of electricity and gas]

1.Minimum requirements for billingU.K.

1.1.Billing based on actual consumptionU.K.

In order to enable final customers to regulate their own energy consumption, billing should take place on the basis of actual consumption at least once a year, and billing information should be made available at least quarterly, on request or where the consumers have opted to receive electronic billing or else twice yearly. Gas used only for cooking purposes may be exempted from this requirement.

1.2.Minimum information contained in the billU.K.

Member States shall ensure that, where appropriate, the following information is made available to final customers in clear and understandable terms in or with their bills, contracts, transactions, and receipts at distribution stations:

(a)

current actual prices and actual consumption of energy;

(b)

comparisons of the final customer’s current energy consumption with consumption for the same period in the previous year, preferably in graphic form;

(c)

contact information for final customers’ organisations, energy agencies or similar bodies, including website addresses, from which information may be obtained on available energy efficiency improvement measures, comparative end-user profiles and objective technical specifications for energy-using equipment.

In addition, wherever possible and useful, Member States shall ensure that comparisons with an average normalised or benchmarked final customer in the same user category are made available to final customers in clear and understandable terms, in, with or signposted to within, their bills, contracts, transactions, and receipts at distribution stations.

1.3.Advice on energy efficiency accompanying bills and other feedback to final customersU.K.

When sending contracts and contract changes, and in the bills customers receive or through websites addressing individual customers, energy distributors, distribution system operators and retail energy sales companies shall inform their customers in a clear and understandable manner of contact information for independent consumer advice centres, energy agencies or similar institutions, including their internet addresses, where they can obtain advice on available energy efficiency measures, benchmark profiles for their energy consumption and technical specifications of energy using appliances that can serve to reduce the consumption of these appliances.

[F3ANNEX VIIa U.K. Minimum requirements for billing and consumption information for heating, cooling and domestic hot water

1. Billing based on actual consumption or heat cost allocator readings U.K.

In order to enable final users to regulate their own energy consumption, billing shall take place on the basis of actual consumption or heat cost allocator readings at least once per year.

2. Minimum frequency of billing or consumption information U.K.

From 25 October 2020 , where remotely readable meters or heat cost allocators have been installed, billing or consumption information based on actual consumption or heat cost allocator readings shall be provided to final users at least quarterly upon request or where final customers have opted to receive electronic billing, or else twice a year.

From 1 January 2022 , where remotely readable meters or heat cost allocators have been installed, billing or consumption information based on actual consumption or heat cost allocator readings shall be provided to final users at least monthly. It may also be made available via the internet and be updated as frequently as allowed by the measurement devices and systems used. Heating and cooling may be exempted from that requirement outside the heating/cooling seasons.

3. Minimum information contained in the bill U.K.

Member States shall ensure that the following information is made available to final users in clear and comprehensible terms in or with their bills where those are based on actual consumption or heat cost allocator readings:

(a)

current actual prices and actual consumption of energy or total heat cost and heat cost allocator readings;

(b)

information about the fuel mix used and the related annual greenhouse gas emissions, including for final users supplied by district heating or district cooling, and a description of the different taxes, levies and tariffs applied. Member States may limit the scope of the requirement to provide information about greenhouse gas emissions to include only supplies from district heating systems with a total rated thermal input exceeding 20 MW;

(c)

comparisons of the final users current energy consumption with consumption for the same period in the previous year, in graphic form, climate corrected for heating and cooling;

(d)

contact information for final customers' organisations, energy agencies or similar bodies, including website addresses, from which information on available energy efficiency improvement measures, comparative end-user profiles and objective technical specifications for energy-using equipment may be obtained;

(e)

information about related complaints procedures, ombudsman services or alternative dispute resolution mechanisms, as applicable in the Member States;

(f)

comparisons with an average normalised or benchmarked final user in the same user category. In the case of electronic bills, such comparisons may instead be made available online and signposted to within the bills.

Bills that are not based on actual consumption or heat cost allocator readings shall contain a clear and comprehensible explanation of how the amount set out in the bill was calculated, and at least the information referred to in points (d) and (e).]

[F10ANNEX VIII U.K. Potential for efficiency in heating and cooling

The comprehensive assessment of national heating and cooling potentials referred to in Article 14(1) shall include and be based on the following:

Part I U.K. OVERVIEW OF HEATING AND COOLING

1. heating and cooling demand in terms of assessed useful energy (41) and quantified final energy consumption in GWh per year (42) by sectors: U.K.

(a)

residential;

(b)

services;

(c)

industry;

(d)

any other sector that individually consumes more than 5 % of total national useful heating and cooling demand;

2. identification, or in the case of point 2(a)(i), identification or estimation, of current heating and cooling supply: U.K.

(a)

by technology, in GWh per year (43) , within sectors mentioned under point 1 where possible, distinguishing between energy derived from fossil and renewable sources:

(i)

provided on-site in residential and service sites by:

  • heat only boilers;

  • high-efficiency heat and power cogeneration;

  • heat pumps;

  • other on-site technologies and sources;

(ii)

provided on-site in non-service and non-residential sites by:

  • heat only boilers;

  • high-efficiency heat and power cogeneration;

  • heat pumps;

  • other on-site technologies and sources;

(iii)

provided off-site by:

  • high-efficiency heat and power cogeneration;

  • waste heat;

  • other off-site technologies and sources;

(b)

identification of installations that generate waste heat or cold and their potential heating or cooling supply, in GWh per year:

(i)

thermal power generation installations that can supply or can be retrofitted to supply waste heat with a total thermal input exceeding 50 MW;

(ii)

heat and power cogeneration installations using technologies referred to in Part II of Annex I with a total thermal input exceeding 20 MW;

(iii)

waste incineration plants;

(iv)

renewable energy installations with a total thermal input exceeding 20 MW other than the installations specified under point 2(b)(i) and (ii) generating heating or cooling using the energy from renewable sources;

(v)

industrial installations with a total thermal input exceeding 20 MW which can provide waste heat;

(c)

reported share of energy from renewable sources and from waste heat or cold in the final energy consumption of the district heating and cooling (44) sector over the past 5 years, in line with Directive (EU) 2018/2001;

3. a map covering the entire national territory identifying (while preserving commercially sensitive information): U.K.

(a)

heating and cooling demand areas following from the analysis of point 1, while using consistent criteria for focusing on energy dense areas in municipalities and conurbations;

(b)

existing heating and cooling supply points identified under point 2(b) and district heating transmission installations;

(c)

planned heating and cooling supply points of the type described under point 2(b) and district heating transmission installations;

4. a forecast of trends in the demand for heating and cooling to maintain a perspective of the next 30 years in GWh and taking into account in particular projections for the next 10 years, the change in demand in buildings and different sectors of the industry, and the impact of policies and strategies related to the demand management, such as long-term building renovation strategies under Directive (EU) 2018/844; U.K.

Part II U.K. OBJECTIVES, STRATEGIES AND POLICY MEASURES

5. planned contribution of the Member State to its national objectives, targets and contributions for the five dimensions of the energy union, as laid out in Article 3(2)(b) of Regulation (EU) 2018/1999, delivered through efficiency in heating and cooling, in particular related to points 1 to 4 of Article 4(b) and to paragraph (4)(b) of Article 15, identifying which of these elements is additional compared to integrated national energy and climate plans; U.K.

6. general overview of the existing policies and measures as described in the most recent report submitted in accordance with Articles 3, 20, 21 and 27(a) of Regulation (EU) 2018/1999; U.K.

Part III U.K. ANALYSIS OF THE ECONOMIC POTENTIAL FOR EFFICIENCY IN HEATING AND COOLING

7. an analysis of the economic potential (45) of different technologies for heating and cooling shall be carried out for the entire national territory by using the cost-benefit analysis referred to in Article 14(3) and shall identify alternative scenarios for more efficient and renewable heating and cooling technologies, distinguishing between energy derived from fossil and renewable sources where applicable. U.K.

The following technologies should be considered:

(a)

industrial waste heat and cold;

(b)

waste incineration;

(c)

high efficiency cogeneration;

(d)

renewable energy sources (such as geothermal, solar thermal and biomass) other than those used for high efficiency cogeneration;

(e)

heat pumps;

(f)

reducing heat and cold losses from existing district networks;

8. this analysis of economic potential shall include the following steps and considerations: U.K.

(a)

Considerations:

(i)

the cost-benefit analysis for the purposes of Article 14(3) shall include an economic analysis that takes into consideration socioeconomic and environmental factors (46) , and a financial analysis performed to assess projects from the investors' point of view. Both economic and financial analyses shall use the net present value as criterion for the assessment;

(ii)

the baseline scenario should serve as a reference point and take into account existing policies at the time of compiling this comprehensive assessment (47) , and be linked to data collected under Part I and point 6 of Part II of this Annex;

(iii)

alternative scenarios to the baseline shall take into account energy efficiency and renewable energy objectives of Regulation (EU) 2018/1999. Each scenario shall present the following elements compared to the baseline scenario:

  • economic potential of technologies examined using the net present value as criterion;

  • greenhouse gas emission reductions;

  • primary energy savings in GWh per year;

  • impact on the share of renewables in the national energy mix.

Scenarios that are not feasible due to technical reasons, financial reasons or national regulation may be excluded at an early stage of the cost-benefit analysis, if justified based on careful, explicit and well-documented considerations.

The assessment and decision-making should take into account costs and energy savings from the increased flexibility in energy supply and from a more optimal operation of the electricity networks, including avoided costs and savings from reduced infrastructure investment, in the analysed scenarios.

(b)

Costs and benefits

The costs and benefits referred to under point 8(a) shall include at least the following benefits and costs:

(i)

Benefits:

  • value of output to the consumer (heating, cooling and electricity);

  • external benefits such as environmental, greenhouse gas emissions and health and safety benefits, to the extent possible;

  • labour market effects, energy security and competitiveness, to the extent possible.

(ii)

Costs:

  • capital costs of plants and equipment;

  • capital costs of the associated energy networks;

  • variable and fixed operating costs;

  • energy costs;

  • environmental, health and safety costs, to the extent possible;

  • labour market costs, energy security and competitiveness, to the extent possible.

(c)

Relevant scenarios to the baseline:

All relevant scenarios to the baseline shall be considered, including the role of efficient individual heating and cooling.

(i)

the cost-benefit analysis may either cover a project assessment or a group of projects for a broader local, regional or national assessment in order to establish the most cost-effective and beneficial heating or cooling solution against a baseline for a given geographical area for the purpose of planning;

(ii)

Member States shall designate the competent authorities responsible for carrying out the cost-benefit analyses pursuant to Article 14. They shall provide the detailed methodologies and assumptions in accordance with this Annex and establish and make public the procedures for the economic analysis.

(d)

Boundaries and integrated approach:

(i)

the geographical boundary shall cover a suitable well-defined geographical area;

(ii)

the cost-benefit analyses shall take into account all relevant centralised or decentralised supply resources available within the system and geographical boundary, including technologies considered under point 7 of Part III of this Annex, and heating and cooling demand trends and characteristics.

(e)

Assumptions:

(i)

Member States shall provide assumptions, for the purpose of the cost-benefit analyses, on the prices of major input and output factors and the discount rate;

(ii)

the discount rate used in the economic analysis to calculate net present value shall be chosen according to European or national guidelines;

(iii)

Member States shall use national, European or international energy price development forecasts if appropriate in their national and/or regional/local context;

(iv)

the prices used in the economic analysis shall reflect socio economic costs and benefits. External costs, such as environmental and health effects, should be included to the extent possible, i.e. when a market price exists or when it is already included in European or national regulation.

(f)

Sensitivity analysis:

(i)

a sensitivity analysis shall be included to assess the costs and benefits of a project or group of projects and be based on variable factors having a significant impact on the outcome of the calculations, such as different energy prices, levels of demand, discount rates and other.

Part IV U.K. POTENTIAL NEW STRATEGIES AND POLICY MEASURES

9. overview of new legislative and non-legislative policy measures (48) to realise the economic potential identified in accordance with points 7 and 8, along with their foreseen: U.K.

(a)

greenhouse gas emission reductions;

(b)

primary energy savings in GWh per year;

(c)

impact on the share of high-efficiency cogeneration;

(d)

impact on the share of renewables in the national energy mix and in the heating and cooling sector;

(e)

links to national financial programming and cost savings for the public budget and market participants;

(f)

estimated public support measures, if any, with their annual budget and identification of the potential aid element.]

ANNEX IXU.K. COST-BENEFIT ANALYSIS

F11 Part 1 U.K. General principles of the cost-benefit analysis

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Part 2 U.K. Principles for the purpose of Article 14(5) and (7)

The cost-benefit analyses shall provide information for the purpose of the measures in Article 14(5) and (7):

If an electricity-only installation or an installation without heat recovery is planned, a comparison shall be made between the planned installations or the planned refurbishment and an equivalent installation producing the same amount of electricity or process heat, but recovering the waste heat and supplying heat through high-efficiency cogeneration and/or district heating and cooling networks.

Within a given geographical boundary the assessment shall take into account the planned installation and any appropriate existing or potential heat demand points that could be supplied from it, taking into account rational possibilities (for example, technical feasibility and distance).

The system boundary shall be set to include the planned installation and the heat loads, such as building(s) and industrial process. Within this system boundary the total cost of providing heat and power shall be determined for both cases and compared.

Heat loads shall include existing heat loads, such as an industrial installation or an existing district heating system, and also, in urban areas, the heat load and costs that would exist if a group of buildings or part of a city were provided with and/or connected into a new district heating network.

The cost-benefit analysis shall be based on a description of the planned installation and the comparison installation(s), covering electrical and thermal capacity, as applicable, fuel type, planned usage and the number of planned operating hours annually, location and electricity and thermal demand.

For the purpose of the comparison, the thermal energy demand and the types of heating and cooling used by the nearby heat demand points shall be taken into account. The comparison shall cover infrastructure related costs for the planned and comparison installation.

Cost-benefit analyses for the purposes of Article 14(5) shall include an economic analysis covering a financial analysis reflecting actual cash flow transactions from investing in and operating individual installations.

Projects with positive cost-benefit outcome are those where the sum of discounted benefits in the economic and financial analysis exceeds the sum of discounted costs (cost-benefit surplus).

Member States shall set guiding principles for the methodology, assumptions and time horizon for the economic analysis.

Member States may require that the companies responsible for the operation of thermal electric generation installations, industrial companies, district heating and cooling networks, or other parties influenced by the defined system boundary and geographical boundary, contribute data for use in assessing the costs and benefits of an individual installation.

ANNEX XU.K. Guarantee of origin for electricity produced from high-efficiency cogeneration

(a)

Member States shall take measures to ensure that:

(i)

the guarantee of origin of the electricity produced from high-efficiency cogeneration:

  • enable producers to demonstrate that the electricity they sell is produced from high-efficiency cogeneration and is issued to this effect in response to a request from the producer,

  • is accurate, reliable and fraud-resistant,

  • is issued, transferred and cancelled electronically;

(ii)

the same unit of energy from high-efficiency cogeneration is taken into account only once.

(b)

The guarantee of origin referred to in Article 14(10) shall contain at least the following information:

(i)

the identity, location, type and capacity (thermal and electrical) of the installation where the energy was produced;

(ii)

the dates and places of production;

(iii)

the lower calorific value of the fuel source from which the electricity was produced;

(iv)

the quantity and the use of the heat generated together with the electricity;

(v)

the quantity of electricity from high-efficiency cogeneration in accordance with Annex II that the guarantee represents;

(vi)

the primary energy savings calculated in accordance with Annex II based on the harmonised efficiency reference values indicated in point (f) of Annex II;

(vii)

the nominal electric and thermal efficiency of the plant;

(viii)

whether and to what extent the installation has benefited from investment support;

(ix)

whether and to what extent the unit of energy has benefited in any other way from a national support scheme, and the type of support scheme;

(x)

the date on which the installation became operational; and

(xi)

the date and country of issue and a unique identification number.

The guarantee of origin shall be of the standard size of 1 MWh. It shall relate to the net electricity output measured at the station boundary and exported to the grid.

ANNEX XIU.K. Energy efficiency criteria for energy network regulation and for electricity network tariffs

1.Network tariffs shall be cost-reflective of cost-savings in networks achieved from demand-side and demand- response measures and distributed generation, including savings from lowering the cost of delivery or of network investment and a more optimal operation of the network.U.K.

2.Network regulation and tariffs shall not prevent network operators or energy retailers making available system services for demand response measures, demand management and distributed generation on organised electricity markets, in particular:U.K.

(a)

the shifting of the load from peak to off-peak times by final customers taking into account the availability of renewable energy, energy from cogeneration and distributed generation;

(b)

energy savings from demand response of distributed consumers by energy aggregators;

(c)

demand reduction from energy efficiency measures undertaken by energy service providers, including energy service companies;

(d)

the connection and dispatch of generation sources at lower voltage levels;

(e)

the connection of generation sources from closer location to the consumption; and

(f)

the storage of energy.

For the purposes of this provision the term ‘organised electricity markets’ shall include over-the-counter markets and electricity exchanges for trading energy, capacity, balancing and ancillary services in all timeframes, including forward, day-ahead and intra-day markets.

3.Network or retail tariffs may support dynamic pricing for demand response measures by final customers, such as:U.K.

(a)

time-of-use tariffs;

(b)

critical peak pricing;

(c)

real time pricing; and

(d)

peak time rebates.

ANNEX XIIU.K. ENERGY EFFICIENCY REQUIREMENTS FOR TRANSMISSION SYSTEM OPERATORS AND DISTRIBUTION SYSTEM OPERATORS

Transmission system operators and distribution system operators shall:

(a)

[F1set up and make public their standard rules relating to the bearing and sharing of costs of technical adaptations, such as grid connections, grid reinforcements and the introduction of new grids, improved operation of the grid and rules on the non-discriminatory implementation of the grid codes, which are necessary in order to integrate new producers feeding electricity produced from high-efficiency cogeneration into the interconnected grid;]

(b)

provide any new producer of electricity produced from high-efficiency cogeneration wishing to be connected to the system with the comprehensive and necessary information required, including:

(i)

a comprehensive and detailed estimate of the costs associated with the connection;

(ii)

a reasonable and precise timetable for receiving and processing the request for grid connection;

(iii)

a reasonable indicative timetable for any proposed grid connection. The overall process to become connected to the grid should be no longer than 24 months, bearing in mind what is reasonably practicable and non-discriminatory;

(c)

provide standardised and simplified procedures for the connection of distributed high-efficiency cogeneration producers to facilitate their connection to the grid.

The standard rules referred to in point (a) shall be based on objective, transparent and non-discriminatory criteria taking particular account of all the costs and benefits associated with the connection of those producers to the grid. They may provide for different types of connection.

ANNEX XIIIU.K. Minimum items to be included in energy performance contracts with the public sector or in the associated tender specifications

  • Clear and transparent list of the efficiency measures to be implemented or the efficiency results to be obtained.

  • Guaranteed savings to be achieved by implementing the measures of the contract.

  • Duration and milestones of the contract, terms and period of notice.

  • Clear and transparent list of the obligations of each contracting party.

  • Reference date(s) to establish achieved savings.

  • Clear and transparent list of steps to be performed to implement a measure or package of measures and, where relevant, associated costs.

  • Obligation to fully implement the measures in the contract and documentation of all changes made during the project.

  • Regulations specifying the inclusion of equivalent requirements in any subcontracting with third parties.

  • Clear and transparent display of financial implications of the project and distribution of the share of both parties in the monetary savings achieved (i.e. remuneration of the service provider).

  • Clear and transparent provisions on measurement and verification of the guaranteed savings achieved, quality checks and guarantees.

  • Provisions clarifying the procedure to deal with changing framework conditions that affect the content and the outcome of the contract (i.e. changing energy prices, use intensity of an installation).

  • Detailed information on the obligations of each of the contracting party and of the penalties for their breach.

ANNEX XIVU.K. GENERAL FRAMEWORK FOR REPORTING

Part 1 U.K. General framework for annual reports

The annual reports referred to in Article 24(1) provide a basis for the monitoring of the progress towards national 2020 targets. Member States shall ensure that the reports include the following minimum information:

(a)

an estimate of following indicators in the year before last (year X(49) - 2):

(i)

primary energy consumption;

(ii)

total final energy consumption;

(iii)

final energy consumption by sector

  • industry

  • transport (split between passenger and freight transport, if available)

  • households

  • services;

(iv)

gross value added by sector

  • industry

  • services;

(v)

disposable income of households;

(vi)

gross domestic product (GDP);

(vii)

electricity generation from thermal power generation;

(viii)

electricity generation from combined heat and power;

(ix)

heat generation from thermal power generation;

(x)

heat generation from combined heat and power plants, including industrial waste heat;

(xi)

fuel input for thermal power generation;

(xii)

passenger kilometres (pkm), if available;

(xiii)

tonne kilometres (tkm), if available;

(xiv)

combined transport kilometres (pkm + tkm), in case (xii) and (xiii) are not available;

(xv)

population.

In sectors where energy consumption remains stable or is growing, Member States shall analyse the reasons for it and attach their appraisal to the estimates.

The second and subsequent reports shall also include points (b) to (e):

(b)

updates on major legislative and non-legislative measures implemented in the previous year which contribute towards the overall national energy efficiency targets for 2020;

(c)

the total building floor area of the buildings with a total useful floor area over 500 m2 and as of 9 July 2015 over 250 m2 owned and occupied by the Member States’ central government that, on 1 January of the year in which the report is due, did not meet the energy performance requirements referred to in Article 5(1);

(d)

the total building floor area of heated and/or cooled buildings owned and occupied by the Member States’ central government that was renovated in the previous year referred to in Article 5(1) or the amount of energy savings in eligible buildings owned and occupied by their central government as referred to in Article 5(6);

(e)

energy savings achieved through the national energy efficiency obligation schemes referred to in Article 7(1) or the alternative measures adopted in application of Article 7(9).

The first report shall also include the national target referred to in Article 3(1).

In the annual reports referred to in Article 24(1) Member States may also include additional national targets. These may be related in particular to the statistical indicators enumerated in point (a) of this Part or combinations thereof, such as primary or final energy intensity or sectoral energy intensities.

Part 2 U.K. General framework for National Energy Efficiency Action Plans

National Energy Efficiency Action Plans referred to in Article 24(2) shall provide a framework for the development of national energy efficiency strategies.

The National Energy Efficiency Action Plans shall cover significant energy efficiency improvement measures and expected/achieved energy savings, including those in the supply, transmission and distribution of energy as well as energy end-use. Member States shall ensure that the National Energy Efficiency Action Plans include the following minimum information:

1.

Targets and strategies

  • the indicative national energy efficiency target for 2020 as required by Article 3(1),

  • the national indicative energy savings target set in Article 4(1) of Directive 2006/32/EC,

  • other existing energy efficiency targets addressing the whole economy or specific sectors.

2.

Measures and energy savings

The National Energy Efficiency Action Plans shall provide information on measures adopted or planned to be adopted in view of implementing the main elements of this Directive and on their related savings.

(a)

Primary energy savings

The National Energy Efficiency Action Plans shall list significant measures and actions taken towards primary energy saving in all sectors of the economy. For every measure or package of measures/actions estimations of expected savings for 2020 and savings achieved by the time of the reporting shall be provided.

Where available, information on other impacts/benefits of the measures (greenhouse gas emissions reduction, improved air quality, job creation, etc.) and the budget for the implementation should be provided.

(b)

Final energy savings

The first and second National Energy Efficiency Action Plans shall include the results with regard to the fulfilment of the final energy savings target set out in Article 4(1) and (2) of the Directive 2006/32/EC. If calculation/estimation of savings per measure is not available, sector level energy reduction shall be shown due to (the combination) of measures.

The first and second National Energy Efficiency Action Plans shall also include the measurement and/or calculation methodology used for calculating the energy savings. If the ‘recommended methodology’(50) is applied, the National Energy Efficiency Action Plan should provide references to this.

3.

Specific information related to this Directive

3.1.

Public bodies (Article 5)

National Energy Efficiency Action Plans shall include the list of public bodies having developed an energy efficiency plan in accordance with Article 5(7).

3.2.

Energy efficiency obligations (Article 7)

National Energy Efficiency Action Plans shall include the national coefficients chosen in accordance with Annex IV.

The first National Energy Efficiency Action Plan shall include a short description of the national scheme referred to in Article 7(1) or the alternative measures adopted in application of Article 7(9).

3.3.

Energy audits and management systems (Article 8)

National Energy Efficiency Action Plans shall include:

(a)

the number of energy audits carried out in the previous period;

(b)

the number of energy audits carried out in large enterprises in the previous period;

(c)

the number of large companies in their territory, with an indication of the number of those to which Article 8(5) is applicable.

3.4.

Promotion of efficient heating and cooling (Article 14)

National Energy Efficiency Action Plans shall include an assessment of the progress achieved in implementing the comprehensive assessment referred to in Article 14(1).

3.5.

Energy transmission and distribution (Article 15)

The first National Energy Efficiency Action Plan and the subsequent reports due every 10 years thereafter shall include the assessment made, the measures and investments identified to utilise the energy efficiency potentials of gas and electricity infrastructure referred to in Article 15(2).

3.6.

Member States shall report, as part of their National Energy Efficiency Action Plans, on the measures undertaken to enable and develop demand response as referred to in Article 15.

3.7.

Availability of qualification, accreditation and certification schemes (Article 16)

National Energy Efficiency Action Plans shall include information on the available qualification, accreditation and certification schemes or equivalent qualification schemes for the providers of energy services, energy audits and energy efficiency improvement measures.

3.8.

Energy Services (Article 18)

National Energy Efficiency Action Plans shall include an internet link to the website where the list or the interface of energy services providers referred to in point (c) of Article 18(1) can be accessible.

3.9.

Other measures to promote energy efficiency (Article 19)

The first National Energy Efficiency Action Plan shall include a list of the measures referred to in Article 19(1).

ANNEX XVU.K.

Correlation table

Directive 2004/8/ECThis Directive
Article 1Article 1(1)
Article 2Article 1(1)
Article 3, point (a)Article 2, point (30)
Article 3, point (b)Article 2, point (32)
Article 3, point (c)Article 2, point (31)
Article 3, point (d)Article 2, point (33)
Article 3, points (e) and (f)
Article 3, point (g)Article 2, point (35)
Article 3, point (h)
Article 3, point (i)Article 2, point (34)
Article 3, point (j)
Article 3, point (k)Article 2, point (36)
Article 3, point (l)Article 2, point (37)
Article 3, point (m)Article 2, point (39)
Article 3, point (n)Article 2, point (38)
Article 3, point (o)
Article 2, points (40), (41), (42), (43), and (44)
Article 4(1)Annex II, point (f), first subpoint
Article 4(2)Article 14(10), second subparagraph
Article 4(3)
Article 5Article 14(10), first subparagraph and Annex X
Article 6Article 14(1) and (3), Annex VIII and IX
Article 7(1)Article 14(11)
Article 7(2) and (3)
Article 8Article 15(5)
Article 15(6), (7), (8) and (9)
Article 9
Article 10(1) and (2)Article 14(1) and 24(2), Annex XIV, Part 2
Article 10(3)Article 24(6)
Article 11Article 24(3)
Article 24(5)
Article 12(1) and (3)
Article 12(2)Annex II, point (c)
Article 13Article 22(2)
Article 14
Article 15Article 28
Article 16
Article 17Article 29
Article 18Article 30
Annex IAnnex I, Part II
Annex IIAnnex I, Part I and Part II, last subparagraph
Annex IIIAnnex II
Annex IVAnnex VIII
Annex IX
Directive 2006/32/ECThis Directive
Article 1Article 1(1)
Article 2Article 1(1)
Article 3, point (a)Article 2, point (1)
Article 3, point (b)Article 2, point (4)
Article 3, point (c)Article 2, point (6)
Article 3, point (d)Article 2, point (5)
Article 2, points (2) and (3)
Article 3, point (e)Article 2, point (7)
Article 3, points (f), (g), (h) and (i)
Article 2, points (8) to (19)
Article 3, point (j)Article 2, point (27)
Article 2, point (28)
Article 3, point (k)
Article 3, point (l)Article 2, point (25)
Article 2, point (26)
Article 3, point (m)
Article 3, point (n)Article 2, point (23)
Article 3, point (o)Article 2, point (20)
Article 3, point (p)Article 2, point (21)
Article 3, point (q)Article 2, point (22)
Article 3, points (r) and (s)
Article 2, points (24), (29), (44) and (45)
Article 3
Article 4
Article 4
Article 5Articles 5 and 6
Article 6(1)(a)Article 7(8), points (a) and (b)
Article 6(1)(b)Article 18(3)
Article 6(2)Article 7(1), (5), (6), (7), (9), (10), (11) and (12)
Article 7(2) and (3)
Article 6(3)Article 18(2), points (b) and (c)
Article 6(5)
Article 7Article 17
Article 8Article 16(1)
Article 16(2) and (3)
Article 9(1)Article 19
Article 9(2)Article 18(1), point (d), subpoint (i)
Article 18(1), points (a), (b), (c), (d), subpoint (ii), and (e)
Article 10(1)Article 15(4)
Article 10(2)Article 15(3)
Article 15(7), (8) and (9)
Article 11Article 20
Article 12(1)Article 8(1)
Article 12(2)
Article 8(2), (3), (4), (5), (6) and (7)
Article 12(3)
Article 13(1)Article 9
Article 13(2)Article 10 and Annex VII, point 1.1
Article 13(3)Annex VII, points 1.2 and 1.3
Article 11
Article 12
Article 13
Article 15(1) and (2)
Article 18(2), points (a) and (d)
Article 21
Article 14(1) and (2)Article 24(1) and (2)
Article 14(3)
Article 14(4) and (5)Article 24(3)
Article 24(4) and (7) to (11)
Article 22(1)
Article 15(1)Article 22(2)
Article 15(2), (3) and (4)
Article 23
Article 25
Article 16Article 26
Article 17Article 27
Article 18Article 28
Article 19Article 29
Article 20Article 30
Annex I
Annex IIAnnex IV
Annex III
Annex IV
Annex V
Annex VIAnnex III
Annex V
Annex VI
Annex VII
Annex XI
Annex XII
Annex XIII
Annex XIV
Annex XV
(3)

Position of the European Parliament of 11 September 2012 (not yet published in the Official Journal) and decision of the Council of 4 October 2012.

(24)

[F3Regulation (EU) 2018/1999 of the European Parliament and of the Council of 11 December 2018 on the Governance of the Energy Union and Climate Action, amending Regulations (EC) No 663/2009 and (EC) No 715/2009 of the European Parliament and of the Council, Directives 94/22/EC, 98/70/EC, 2009/31/EC, 2009/73/EC, 2010/31/EU, 2012/27/EU and 2013/30/EU of the European Parliament and of the Council, Council Directives 2009/119/EC and (EU) 2015/652 and repealing Regulation (EU) No 525/2013 of the European Parliament and of the Council ( OJ L 328, 21.12.2018, p. 1 ).]

(36)

Member States may apply different conversion factors if these can be justified.

(37)

[F1Regulation (EC) No 443/2009 of the European Parliament and of the Council of 23 April 2009 setting emission performance standards for new passenger cars as part of the Community's integrated approach to reduce CO 2 emissions from light-duty vehicles ( OJ L 140, 5.6.2009, p. 1 ).]

(38)

[F1Regulation (EU) No 510/2011 of the European Parliament and of the Council of 11 May 2011 setting emission performance standards for new light commercial vehicles as part of the Union's integrated approach to reduce CO 2 emissions from light-duty vehicles ( OJ L 145, 31.5.2011, p. 1 ).]

(39)

[F1Council Directive 2003/96/EC of 27 October 2003 restructuring the Community framework for the taxation of energy products and electricity ( OJ L 283, 31.10.2003, p. 51 ).]

(40)

[F1Council Directive 2006/112/EC of 28 November 2006 on the common system of value added tax ( OJ L 347, 11.12.2006, p. 1 ).]

(41)

[F10The amount of thermal energy needed to satisfy the heating and cooling demand of end-users.]

(42)

[F10The most recent data available should be used.]

(43)

[F10The most recent data available should be used.]

(44)

[F10The identification of renewable cooling shall, after the methodology for calculating the quantity of renewable energy used for cooling and district cooling is established in accordance with Article 35 of Directive (EU) 2018/2001, be carried out in accordance with that Directive. Until then it shall be carried out according to an appropriate national methodology.]

(45)

[F10The analysis of the economic potential should present the volume of energy (in GWh) that can be generated per year by each technology analysed. The limitations and interrelations within the energy system should also be taken into account. The analysis may make use of models based on assumptions representing the operation of common types of technologies or systems.]

(46)

[F10Including the assessment referred to in Article 15, paragraph 7 of Directive (EU) 2018/2001.]

(47)

[F10The cut-off date for taking into account policies for the baseline scenario is the end of the year preceding to the year by the end of which the comprehensive assessment is due. That is to say, policies enacted within a year prior to the deadline for submission of the comprehensive assessment do not need to be taken into account.]

(48)

[F10This overview shall include financing measures and programmes that may be adopted over the period of the comprehensive assessment, not prejudging a separate notification of the public support schemes for a State aid assessment,]

(49)

X = current year.

(50)