Article 7U.K.Ship recycling plan
1.A ship-specific ship recycling plan shall be developed prior to any recycling of a ship. The ship recycling plan shall address any ship-specific considerations that are not covered in the ship recycling facility plan or that require special procedures.
2.The ship recycling plan shall:
(a)be developed by the operator of the ship recycling facility in accordance with the relevant provisions of the Hong Kong Convention and taking into account the relevant IMO guidelines and the ship-relevant information provided by the ship owner in accordance with Article 6(1)(a) so that its contents are consistent with the information contained in the inventory of hazardous materials;
(b)clarify whether and to what extent any preparatory work, such as pre-treatment, identification of potential hazards and removal of stores, is to take place at a location other than the ship recycling facility identified in the ship recycling plan. The ship recycling plan should include the location where the ship will be placed during recycling operations and a concise plan for the arrival and safe placement of the specific ship to be recycled;
(c)include information concerning the establishment, maintenance and monitoring of the safe-for-entry and safe-for-hot work conditions for the specific ship, taking into account features such as its structure, configuration and previous cargo, and other necessary information on how the ship recycling plan is to be implemented;
(d)include information on the type and amount of hazardous materials and of waste to be generated by the recycling of the specific ship, including the materials and the waste identified in the inventory of hazardous materials, and on how they will be managed and stored in the ship recycling facility as well as in subsequent facilities; and
(e)be prepared separately, in principle, for each ship recycling facility involved where more than one ship recycling facility is to be used, and identify the order of use and the authorised activities that will occur at those facilities.
3.The ship recycling plan shall be tacitly or explicitly approved by the competent authority in accordance with the requirements of the state where the ship recycling facility is located, where applicable.
Explicit approval shall be given when the competent authority sends a written notification of its decision on the ship recycling plan to the operator of the ship recycling facility, the ship owner and the administration.
Tacit approval shall be deemed given, if no written objection to the ship recycling plan is communicated by the competent authority to the operator of the ship recycling facility, the ship owner and the administration within a review period laid down in accordance with the requirements of the state where the ship recycling facility is located, where applicable, and notified in accordance with Article 15(2)(b).
4.[The Secretary of State may require the] administration to send to the competent authority of the state where the ship recycling facility is located the information provided by the ship owner pursuant to Article 6(1)(b) and the following details:
(i)
the date on which the ship was registered within the State whose flag it flies;
(ii)
the ship’s identification number (IMO number);
(iii)
the hull number on new-building delivery;
(iv)
the name and type of the ship;
(v)
the port at which the ship is registered;
(vi)
the name and address of the ship owner as well as the IMO registered owner identification number;
(vii)
the name and address of the company;
(viii)
the name of any classification societies with which the ship is classed;
(ix)
the ship’s main particulars (Length overall (LOA), Breadth (Moulded), Depth (Moulded), LDT, Gross and Net tonnage, and engine type and rating).