Search Legislation

The Weights and Measures (Local and Working Standard Capacity Measures and Testing Equipment) Regulations 1990

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)
 Help about opening options

Opening OptionsExpand opening options

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

  1. Introductory Text

  2. Expand +/Collapse -

    PART I GENERAL

    1. 1.Citation, commencement and revocation

    2. 2.Interpretation

  3. Expand +/Collapse -

    PART II WORKING STANDARD CAPACITY MEASURES

    1. 3.(1) Working standard capacity measures made of glass and provided...

    2. Method 1

    3. Method 2

    4. 4.Method 2

  4. Expand +/Collapse -

    PART III TESTING EQUIPMENT

    1. 5.Reference meters

    2. 6.A reference meter shall have been tested over the range...

    3. 7.A reference meter shall have been tested at a single...

    4. 8.Reference meters for water

    5. 9.A reference meter for water shall have been tested over...

    6. 10.Multifillers

    7. 11.Every multifiller shall have been tested within six months before...

    8. 12.Burettes and pipettes

    9. 13.A pipette shall be tested as a measure of its...

    10. 14.A burette shall be tested as a measure of its...

    11. 15.Displacement plungers

    12. 16.A displacement plunger shall have been tested within 12 months...

    13. 17.Differential pressure gauges

    14. 18.Piston provers

  5. Expand +/Collapse -

    PART IV WORKING STANDARD CAPACITY MEASURES AND TESTING EQUIPMENT

    1. 19.(1) Where an inspector has reasonable cause to believe that...

  6. Expand +/Collapse -

    PART V LOCAL STANDARD CAPACITY MEASURES

    1. 20.Prescribed limits of error

    2. 21.Periods of validity of certificates of fitness of local standard capacity measures

  7. Signature

    1. Expand +/Collapse -

      SCHEDULE 1

      DISPLACEMENT PLUNGERS

    2. Expand +/Collapse -

      SCHEDULE 2

      DIFFERENTIAL PRESSURE GAUGES

      1. PISTON PROVERS

    3. Expand +/Collapse -

      SCHEDULE 3

      WORKING STANDARD CAPACITY MEASURES AND TESTING EQUIPMENT

      1. PROVING TANKS

      2. PROVING TANKS FOR WATER

      3. GRADUATED MEASURING CYLINDERS

    4. Expand +/Collapse -

      SCHEDULE 4

      LOCAL STANDARD CAPACITY MEASURES

      1. PROVING TANKS

      2. PROVING TANKS FOR WATER

  8. Explanatory Note

Back to top

Options/Help