Search Legislation

The Pollution Prevention and Control (Industrial Emissions) Regulations (Northern Ireland) 2013

 Help about what version

What Version

 Help about advanced features

Advanced Features

 Help about opening options

Opening OptionsExpand opening options

Changes over time for: Paragraph 3

 Help about opening options

Version Superseded: 18/12/2020

Alternative versions:

Status:

Point in time view as at 10/12/2014. This version of this provision has been superseded. Help about Status

Changes to legislation:

There are currently no known outstanding effects for the The Pollution Prevention and Control (Industrial Emissions) Regulations (Northern Ireland) 2013, Paragraph 3. Help about Changes to Legislation

Exercise of relevant functionsN.I.

This section has no associated Explanatory Memorandum

3.—(1) The chief inspector must exercise his functions under regulation 7 so as to ensure compliance with the following provisions of Chapter IV of the IED—

(a)Article 42 (scope);

(b)Article 45(1) to (2) and (4) (permit conditions);

(c)Article 46 (control of emissions);

(d)Article 47 (breakdown);

(e)Article 48(1) to (4) (monitoring of emissions), which shall be read as if the words “Member States” were replaced by “the chief inspector”;

(f)Article 49 (compliance with emission limit values);

(g)Article 50 (operating conditions);

(h)Article 51(1) to (3) (authorisation to change operating conditions) but ignore the words “Member States may lay down rules governing these authorisations” in Article 51(1);

(i)Article 52 (delivery and reception of waste);

(j)Article 53 (residues);

(k)Article 54 (substantial change);

(l)Article 55 (reporting and public information on waste incineration plants and waste co-incineration plants); and

(m)Article 82(5) and (6) (transitional provisions).

(2) The chief inspector shall ensure that a permit which authorises the incineration or co-incineration of waste with energy recovery shall contain conditions ensuring that the recovery of energy shall take place with a high level of energy efficiency.

(3) The chief inspector shall ensure that a permit which authorises the operation of a waste incineration installation shall contain such conditions as the chief inspector considers necessary to give effect to Article 14 of Directive 2006/66/EC(1) of the European Parliament and of the Council of 6 September 2006 on batteries and accumulators and waste batteries and accumulators.

Commencement Information

I1Sch. 11 para. 3 in operation at 20.6.2013, see reg. 1

(1)

O.J. No. L266, 26.9.2006, p.1

Back to top

Options/Help

You have chosen to open The Whole Rule

The Whole Rule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Rule as a PDF

The Whole Rule you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Rule

The Whole Rule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?