C1C2C3C4C5C6C7C8C9C10C11 Part III Control over development

Annotations:
Modifications etc. (not altering text)
C1

Pt. 3 (ss. 55-106) except ss. 76, 90(2)(5) applied (with modifications) (17.7.1992) by S.I. 1992/1492, regs. 2(1)(b), 3-11

Pt. 3 (ss. 55-106): power to modify conferred (10.11.1993) by 1993 c. 28, s. 171(1)(a); S.I. 1993/2762, art. 3

Pt. 3 (ss. 55-106) applied (5.11.1993) by 1993 c. 42, s. 24(1) (with ss. 2, 30(1), Sch. 2 para.9)

Pt. 3 (ss. 55-106) extended (1.11.1995) by 1995 c. 25, s. 96(2) (with ss. 7(6), 115, 117); S.I. 1995/2765, art. 2

Pt. 3 (ss. 55-106) modified (1.4.1996) by 1994 c. 19, s. 20(3), Sch. 5 Pt. III paras. 15(1), 20 (with ss. 54(5)(7), 55(5), Sch. 17 paras. 22(1), 23(2)); S.I. 1995/3198, art. 4, Sch. 2

Pt. 3 (ss. 55-106) modified (18.12.1996) by 1996 c. 61, s. 9(1)(2)

Pt. 3 (ss. 55-106) modified (18.12.1996) by 1996 c. 61, s. 51

Pt. 3 (ss. 55-106) modified (2.4.2004) by The Docklands Light Railway (Woolwich Arsenal Extension) Order 2004 (S.I. 2004/757), art. 20(1)

Pt. 3 (ss. 55-106) modified (31.10.2005) by The London Thames Gateway Development Corporation (Planning Functions) Order 2005 (S.I. 2005/2721), art. 4

Pt. 3 (ss. 55-106) modified (25.11.2005) by The Docklands Light Railway (Capacity Enhancement) Order 2005 (S.I. 2005/3105), art. 21(1) (with arts. 3(5), 15(3))

Pt. 3 (ss. 55-106) applied (7.6.2006) by Planning and Compulsory Purchase Act 2004 (c. 5), ss. 89, 121, Sch. 4 para. 3(2) (with s. 111); S.I. 2006/1281, art. 2

Pt. 3 (ss. 55-106) modified (22.11.2006) by The Docklands Light Railway (Stratford International Extension) Order 2006 (S.I. 2006/2905), art. 17(1) (with art. 43)

Pt. 3 (ss. 55-106) modified (13.12.2006) by The Luton Dunstable Translink Order 2006 (S.I. 2006/3118), art. 18(1)

C4

Pt. 3 modified (22.7.2008) by Crossrail Act 2008 (c. 18), s. 10(1)

F2F4England: consultation before applying for planning permission F1or permission in principle

Annotations:
Amendments (Textual)
F2

Ss. 61W-61Y and cross-heading inserted (15.11.2011 for specified purposes, 17.12.2013 in so far as not already in force) by Localism Act 2011 (c. 20), ss. 122(1), 240(5)(l) (with ss. 122(3), 144) (as amended (25.4.2024) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 122, 255(3)(b) (with s. 247); S.I. 2024/452, reg. 3(h)); S.I. 2013/2931, art. 2

F4

Words in s. 61W cross-heading substituted (6.9.2015 for specified purposes, 1.3.2016 in so far as not already in force) by Planning (Wales) Act 2015 (anaw 4), ss. 17(5), 58(2)(b)(4)(b); S.I. 2016/52, art. 2(a) (with art. 6)

F1

Words in s. 61W cross-heading inserted (13.7.2016) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 12 para. 3; S.I. 2016/733, reg. 3(d)

61XDuty to take account of responses to consultation

1

Subsection (2) applies where a person—

a

has been required by section 61W(1) to carry out consultation on a proposed application for planning permission F3or permission in principle, and

b

proposes to go ahead with making an application for planning permission F3or permission in principle (whether or not in the same terms as the proposed application).

2

The person must, when deciding whether the application that the person is actually to make should be in the same terms as the proposed application, have regard to any responses to the consultation that the person has received.