C1C2C3C4C5C6C7C8C9C10C11 Part III Control over development

Annotations:
Modifications etc. (not altering text)
C1

Pt. 3 (ss. 55-106) except ss. 76, 90(2)(5) applied (with modifications) (17.7.1992) by S.I. 1992/1492, regs. 2(1)(b), 3-11

Pt. 3 (ss. 55-106): power to modify conferred (10.11.1993) by 1993 c. 28, s. 171(1)(a); S.I. 1993/2762, art. 3

Pt. 3 (ss. 55-106) applied (5.11.1993) by 1993 c. 42, s. 24(1) (with ss. 2, 30(1), Sch. 2 para.9)

Pt. 3 (ss. 55-106) extended (1.11.1995) by 1995 c. 25, s. 96(2) (with ss. 7(6), 115, 117); S.I. 1995/2765, art. 2

Pt. 3 (ss. 55-106) modified (1.4.1996) by 1994 c. 19, s. 20(3), Sch. 5 Pt. III paras. 15(1), 20 (with ss. 54(5)(7), 55(5), Sch. 17 paras. 22(1), 23(2)); S.I. 1995/3198, art. 4, Sch. 2

Pt. 3 (ss. 55-106) modified (18.12.1996) by 1996 c. 61, s. 9(1)(2)

Pt. 3 (ss. 55-106) modified (18.12.1996) by 1996 c. 61, s. 51

Pt. 3 (ss. 55-106) modified (2.4.2004) by The Docklands Light Railway (Woolwich Arsenal Extension) Order 2004 (S.I. 2004/757), art. 20(1)

Pt. 3 (ss. 55-106) modified (31.10.2005) by The London Thames Gateway Development Corporation (Planning Functions) Order 2005 (S.I. 2005/2721), art. 4

Pt. 3 (ss. 55-106) modified (25.11.2005) by The Docklands Light Railway (Capacity Enhancement) Order 2005 (S.I. 2005/3105), art. 21(1) (with arts. 3(5), 15(3))

Pt. 3 (ss. 55-106) applied (7.6.2006) by Planning and Compulsory Purchase Act 2004 (c. 5), ss. 89, 121, Sch. 4 para. 3(2) (with s. 111); S.I. 2006/1281, art. 2

Pt. 3 (ss. 55-106) modified (22.11.2006) by The Docklands Light Railway (Stratford International Extension) Order 2006 (S.I. 2006/2905), art. 17(1) (with art. 43)

Pt. 3 (ss. 55-106) modified (13.12.2006) by The Luton Dunstable Translink Order 2006 (S.I. 2006/3118), art. 18(1)

C4

Pt. 3 modified (22.7.2008) by Crossrail Act 2008 (c. 18), s. 10(1)

Revocation and modification of planning permission F4or permission in principle

Annotations:
Amendments (Textual)
F4

Words in s. 97 cross-heading inserted (13.7.2016) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 12 para. 24; S.I. 2016/733, reg. 3(d)

97 Power to revoke or modify planning permission F5or permission in principle.

1

If it appears to the local planning authority that it is expedient to revoke or F7modify—

a

any permission (including permission in principle) to develop land granted on an application made under this Part, or

b

any permission in principle granted by a development order,

the authority may by order revoke or modify the permission to such extent as they consider expedient.

2

In exercising their functions under subsection (1) the authority shall have regard to the development plan and to any other material considerations.

3

The power conferred by this section may be exercised—

a

F6in the case of planning permission that relates to the carrying out of building or other operations, at any time before those operations have been completed;

b

F6in the case of planning permission that relates to a change of the use of any land, at any time before the change has taken place.

4

The revocation or modification of F3planning permission for the carrying out of building or other operations shall not affect so much of those operations as has been previously carried out.

5

References in this section to the local planning authority are to be construed in relation to development consisting of the winning and working of minerals as references to the mineral planning authority, F1. . ..

F26

Part II of Schedule 5 shall have effect for the purpose of making special provision with respect to the conditions that may be imposed by an order under this section which revokes or modifies permission for development—

a

consisting of the winning and working of minerals; or

b

involving the depositing of refuse or waste materials.

F97

Subsection (1) does not permit the revocation or modification of the condition under paragraph 13 of Schedule 7A (the biodiversity gain condition), subject as follows.

8

The Secretary of State may by regulations make provision—

a

for the condition under paragraph 13 of Schedule 7A to apply in relation to the modification of planning permission under this section, subject to such modifications as may be specified in the regulations;

b

for planning permission modified under this section to be subject to other conditions relating to meeting the biodiversity gain objective referred to in paragraph 2 of Schedule 7A (including conditions of a kind referred to in paragraph 20(3) of that Schedule).

F89

Subsection (1) does not permit the revocation or modification of the condition under section 90B (condition relating to development progress reports in England).