Part 3E+W+SNationally significant infrastructure projects

EnergyE+W+S

20Gas transporter pipe-linesE+W

(1)The construction of a pipe-line by a gas transporter is within section 14(1)(f) only if (when constructed) each of the conditions in subsections (2) to (5) is expected to be met in relation to the pipe-line.

(2)The pipe-line must be wholly or partly in England.

(3)Either—

(a)the pipe-line must be more than 800 millimetres in diameter and more than 40 kilometres in length, or

(b)the construction of the pipe-line must be likely to have a significant effect on the environment.

(4)The pipe-line must have a design operating pressure of more than 7 bar gauge.

(5)The pipe-line must convey gas for supply (directly or indirectly) to at least 50,000 customers, or potential customers, of one or more gas suppliers.

(6)In the case of a pipe-line that (when constructed) will be only partly in England, the construction of the pipe-line is within section 14(1)(f) only to the extent that the pipe-line will (when constructed) be in England.

(7)Gas supplier” has the same meaning as in Part 1 of the Gas Act 1986 (c. 44) (see section 7A(11) of that Act).