The scheduled works must be constructed—
a
in the lines or situations shown on the deposited plans,
b
in accordance with the levels shown on the deposited sections, and
c
in the case of any station, depot or shaft for which an upper limit is shown on the deposited sections, within the limit so shown.
This is subject to sub-paragraph (2).
2
In constructing or maintaining any of the scheduled works, the nominated undertaker may deviate—
a
laterally to any extent from the lines or situations shown on the deposited plans, within the limits of deviation so shown,
b
vertically downwards to any extent from the level shown for that work on the deposited sections, and
c
vertically upwards to any extent not exceeding 3 metres from the level shown for that work on the deposited sections, but doing so in a case mentioned in sub-paragraph (1)(c) does not increase the limit referred to in that sub-paragraph.