Search Legislation

The Boiler (Efficiency) Regulations 1993

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)

More Resources

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

  1. Introductory Text

  2. 1.Citation and commencement

  3. 2.Interpretation

  4. 3.Boilers and appliances to which the Regulations do not apply

  5. 4.Supply of boilers

  6. 5.Efficiency requirements for boilers

  7. 6.Supply of appliances

  8. 7.The EC mark

  9. 8.Notified bodies

  10. 9.Failure to comply with Regulations: powers of notified bodies

  11. 10.Optional marking of products to indicate energy performance

  12. 11.Requirement to keep information about boilers etc

  13. 12.Enforcement

  14. 13.Offences and penalties

  15. 14.Defences.

  16. 15.Liability of a person other than principal offender

  17. 16.Transitional provisions

    1. SCHEDULE 1

      SPECIMEN FORM OF EC MARK

      1. 1.(1) The conformity marking shall consist of the initials “CE”...

      2. 2.Before 1st January 1995, paragraph 1 shall have effect as...

    2. SCHEDULE 2

      THE EFFICIENCY REQUIREMENTS

    3. SCHEDULE 3

      BOILERS AND APPLIANCES TO WHICH THESE REGULATIONS DO NOT APPLY

      1. Part I DESCRIPTION OF BOILERS ETC.

        1. 1.A hot-water boiler which is capable of being fired by...

        2. 2.Equipment for the instantaneous preparation of hot water.

        3. 3.A boiler designed to be fired by industrial waste gas,...

        4. 4.A cooker or other appliance which is designed mainly to...

        5. 5.A device with an effective rated output of less than...

        6. 6.A boiler manufactured on a one-off basis.

        7. 7.A back boiler or boiler designed to be installed in...

        8. 8.An appliance intended to form part of any product specified...

      2. Part II INTERPRETATION OF SCHEDULE 3

        1. 9.In Part I of this Schedule “back boiler” means a...

    4. SCHEDULE 4

      EC TYPE-EXAMINATION

      1. 1.This Schedule describes that part of the procedure by which...

      2. 2.(1) The application for EC type-examination shall be lodged by...

      3. 3.The technical documents shall enable the conformity of the product...

      4. 4.The notified body shall— (a) examine the technical documents, verify...

      5. 5.(1) Where the type meets the relevant provisions of these...

      6. 6.The applicant shall inform the notified body which holds the...

      7. 7.Each notified body shall communicate to the other notified bodies...

      8. 8.The other notified bodies may receive copies of the EC...

    5. SCHEDULE 5

      CONFORMITY TO TYPE AND QUALITY ASSURANCE

      1. Part I

        1. 1.Conformity to type

        2. 2.The manufacturer shall take all measures necessary to ensure that...

        3. 3.A notified body chosen by the manufacturer shall perform or...

      2. Part II

        1. 4.Production quality assurance

        2. 5.The manufacturer shall operate an approved quality system for production,...

        3. 6.Quality system

        4. 7.Monitoring under the responsibility of the notified body

        5. 8.Each notified body shall give the other notified bodies the...

      3. Part III

        1. 9.Product quality assurance

        2. 10.Quality system

        3. 11.(1) Under the quality system, each boiler or appliance shall...

        4. 12.Monitoring under the responsibility of the notified body

    6. SCHEDULE 6

      NOTIFIED BODIES

      1. Part I

        1. 1.Requirements for approval of a notified body

        2. 2.The body has access to the equipment required for special...

        3. 3.The staff responsible for inspection have— (a) sound technical and...

      2. Part II

        1. 4.Requirements to be imposed on notified bodies

        2. 5.The body and its staff shall carry out the verification...

        3. 6.The impartiality of inspection staff shall be guaranteed. Their remuneration...

        4. 7.The body shall take out liability insurance.

        5. 8.The staff of the body shall be required by the...

    7. SCHEDULE 7

      LABELLING INDICATING ENERGY PERFORMANCE

      1. Part I

        1. 1.If the efficiency of a boiler at rated output and...

        2. 2.If the efficiency of a boiler at rated output and...

        3. 3.Every extra step of efficiency of three points at rated...

      2. Part II The energy performance label awarded under regulation 10 consists of the following symbol:

      3. Part III Efficiency requirements to be met both at nominal output and at part load 0.3 Pn

  18. Explanatory Note

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources