Search Legislation

The Electricity (Non-Fossil Fuel Sources) (England and Wales) Order 1997

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)

More Resources

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

  1. Introductory Text

  2. 1.Citation, commencement and application

  3. 2.Interpretation

  4. 3.Requirement to make arrangements etc.

  5. 4.(1) Where— (a) any relevant arrangements provide that the availability...

  6. Signature

    1. SCHEDULE 1

      SPECIFIED AGGREGATE AMOUNTS OF GENERATING CAPACITY

      1. PART I NAEROBIC DIGESTION GENERATING STATIONS

        1. 1.Table A below relates to anaerobic digestion generating stations— Table...

        2. 2.In this Order, “anaerobic digestion generating stations” means generating stations...

      2. PART II BIOMASS GENERATING STATIONS

        1. 1.Table B below relates to biomass generating stations— Table B...

        2. 2.In this Order, “biomass generating stations” means generating stations which—...

      3. PART III HYDRO GENERATING STATIONS

        1. 1.Table C below relates to hydro generating stations— Table C...

        2. 2.In this Order, “hydro generating stations” means generating stations of...

      4. PART IV LANDFILL GAS GENERATING STATIONS

        1. 1.Table D below relates to landfill gas generating stations— Table...

        2. 2.In this Order, “landfill gas generating stations” means generating stations...

      5. PART V MUNICIPAL AND INDUSTRIAL WASTE WITH COMBINED HEAT AND POWER GENERATING STATIONS

        1. 1.Table E below relates to municipal and industrial waste with...

        2. 2.In this Order, “municipal and industrial waste with combined heat...

      6. PART VI MUNICIPAL AND INDUSTRIAL WASTE FLUIDISED BED COMBUSTION GENERATING STATIONS

        1. 1.Table F below relates to municipal and industrial waste fluidised...

        2. 2.In this Order, “municipal and industrial waste fluidised bed combustion...

      7. PART VII WIND GENERATING STATIONS

        1. 1.Table G below relates to wind generating stations exceeding 0.768...

        2. 2.Table H below relates to wind generating stations not exceeding...

        3. 3.In this Order— “declared net capacity”, in the case of...

    2. SCHEDULE 2

      CONDITIONS PRECEDENT

      1. 1.The requirements referred to in article 4(1)(a) are—

      2. 2.In this Schedule— “connection agreement” means an agreement providing for...

    3. SCHEDULE 3

      TERMINATION EVENTS

  7. Explanatory Note

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources