Search Legislation

The Merchant Shipping (Passenger Ship Construction: Ships of Classes III to VI (A)) Regulations 1998

 Help about what version

What Version

 Help about advanced features

Advanced Features

 Help about opening options

Opening Options

More Resources

Changes over time for: Section 52

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The Merchant Shipping (Passenger Ship Construction: Ships of Classes III to VI (A)) Regulations 1998, Section 52. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Boilers and other pressure vesselsU.K.

52.—(1) Every boiler or other pressure vessel and its respective mountings shall, before being put into service for the first time, be subjected to a hydraulic test to a pressure suitably in excess of the working pressure which will ensure that the boiler or other pressure vessel and its mountings are adequate in strength and design for the service for which it is intended and having regard to—

(a)the design and the material of which it is constructed;

(b)the purpose for which it is intended to be used; and

(c)the working conditions under which it is intended to be used;

and every such boiler or other pressure vessel and its respective mountings shall at any time thereafter be capable of withstanding such a test and shall be maintained in an efficient condition.

(2) Means shall be provided which will prevent overpressure in any part of boilers and other pressure vessels, and in particular every boiler and every unfired steam generator shall be provided with not less than two safety valves. Provided that, having regard to the output or any other feature of any boiler or unfired steam generator, only one safety valve may be fitted if it can be shown that adequate protection against overpressure is provided.

(3) In every ship where oil fired water tube boilers are fitted, an automatic boiler water low level alarm and an automatic boiler water level shut-off valve in the fuel supply pipe to the furnace fronts shall be provided.

Additional requirements for ships constructed on or after 1st September 1984

(4) Every water tube boiler serving turbine machinery shall be fitted with a high water level alarm.

(5) Every oil fired boiler which is not continuously attended shall be provided with arrangements to shut off the fuel supply and give an alarm at an attended location in the event of low boiler water level, combustion air supply failure or flame failure.

(6) Every boiler designed to contain water at a specific level shall be provided with at least two means for indicating the water level, at least one of which shall be a direct reading gauge glass.

(7) Means shall be provided to test and control the quality of the water in the boilers.

Commencement Information

I1Reg. 52 in force at 12.11.1998, see reg. 1

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.