Search Legislation

The Merchant Shipping (Passenger Ship Construction: Ships of Classes III to VI (A)) Regulations 1998

 Help about what version

What Version

 Help about advanced features

Advanced Features

 Help about opening options

Opening Options

More Resources

Changes over time for: Section 9

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The Merchant Shipping (Passenger Ship Construction: Ships of Classes III to VI (A)) Regulations 1998, Section 9. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Peak and machinery space bulkheads, shaft tunnelsU.K.

9.—(1) Every subdivided ship shall be provided with a collision bulkhead which shall be watertight up to the bulkhead deck and shall be fitted at a distance from the ship’s forward perpendicular of not less than five per cent of the length of the ship and not more than three metres plus five per cent of such length. If the ship has a forward superstructure, the collision bulkhead shall be extended weathertight to the deck next above the bulkhead deck. The extension shall not be required to be fitted directly over the bulkhead below, provided that it is at least five per cent of the length of the ship from the forward perpendicular and the part of the bulkhead deck which forms the step is made effectively weathertight. A collision bulkhead need not be provided if the design of the ship, its service or its operation makes its fitting unnecessary.

(2) Every such ship shall be provided with a watertight afterpeak bulkhead and with watertight bulkheads, dividing the space appropriate to the main and auxiliary propelling machinery (and boilers if any) from other spaces. Such bulkheads shall be watertight up to the bulkhead deck provided that the afterpeak bulkhead may be stopped below the bulkhead deck if the safety of the ship as regards subdivision is not thereby impaired.

(3) The stern gland of every such ship shall be situated in a watertight shaft tunnel or other watertight space separate from the stern tube compartment and of such a volume that if the tunnel or space is flooded the margin line will not be submerged.

Additional requirements for ships constructed on or after 1st September 1984

(4) Where bow doors are fitted and a sloping loading ramp forms part of the extension of the collision bulkhead above the bulkhead deck, any part of the ramp structure which is more than 2.3 metres above the bulkhead deck may extend forward of the limit specified in paragraph (1). The ramp shall form a complete weathertight closure of the collision bulkhead extension above the bulkhead deck.

Commencement Information

I1Reg. 9 in force at 12.11.1998, see reg. 1

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.