| General |
---|
1 | Viable micro-organisms shall be contained in a system which separates the process from the workplace and wider environment (closed system) | required where and to extent the risk assessment shows it is required | required | required | required |
2 | Closed systems located within a controlled area | not required | required where and to extent the risk assessment shows they are required | required | required and required to be purpose built |
3 | Control of exhaust gases from the closed system | not required | required so as to minimise release | required so as to prevent release | required so as to prevent release |
4 | Control of aerosols during sample collection, addition of material to a closed system or transfer of material to another closed system | required where and to extent the risk assessment shows it is required | required so as to minimise release | required so as to prevent release | required so as to prevent release |
5 | Inactivation of bulk culture fluids before removal from the closed system | required where and to extent the risk assessment shows it is required | required by validated means | required by validated means | required by validated means |
6 | Seals shall be designed so as to minimise or prevent release | not required | required so as to minimise release | required so as to prevent release | required so as to prevent release |
7 | The controlled area designed to contain spillage of the entire contents of the closed system | required where and to extent the risk assessment shows it is required | required where and to extent the risk assessment shows it is required | required | required |
8 | The controlled area sealable to permit fumigation | not required | required where and to extent the risk assessment shows it is required | required where and to extent the risk assessment shows it is required | required |
9 | Biohazard signs posted | required where and to extent the risk assessment shows it is required | required | required | required |
| Equipment |
---|
10 | Entry via airlock | not required | not required | required where and to extent the risk assessment shows it is required | required |
11 | Surfaces resistant to water, acids, alkalis, solvents, disinfectants and decontamination agents and easy to clean | required for any bench | required for any bench | required for floor and any bench | required for bench, floor, ceiling and walls |
12 | Specific measures to adequately ventilate the controlled areas in order to minimise air contamination | required where and to extent the risk assessment shows they are required | required where and to extent the risk assessment shows they are required | required where and to extent the risk assessment shows they are required | required |
13 | The controlled area maintained at an air pressure negative to the immediate surroundings | not required | not required | required where and to extent the risk assessment shows it is required | required |
14 | Extract and input air from the controlled area shall be HEPA filtered | not required | not required | required for extract air, optional for input air | required for input and extract air |
| System of work |
---|
15 | Access restricted to authorised personnel only | not required | required | required | required |
16 | Decontamination and washing facilities provided for personnel | required | required | required | required |
17 | Personnel shall shower before leaving the controlled area | not required | not required | required where and to extent the risk assessment shows it is required | required |
18 | Personnel shall wear protective clothing | work clothing required | work clothing required | required | complete change required before exit and entry |
19 | Written procedures and records of staff training | not required | not required | required | required |
| Waste |
---|
20 | Inactivation of GMMs in effluent from handwashing sinks and showers or similar effluents | not required | not required | required where and to extent the risk assessment shows it is required | required |
21 | Inactivation of GMMs in contaminated material and waste including those in process effluent before final discharge | required by validated means | required by validated means | required by validated means | required by validated means |