The term provision is used to describe a definable element in a piece of legislation that has legislative effect – such as a Part, Chapter or section. A version of a provision is prospective either:
- where the provision (Part, Chapter or section) has never come into force or;
- where the text of the provision is subject to change, but no date has yet been appointed by the appropriate person or body for those changes to come into force.
Commencement Orders listed in the ‘Changes to Legislation’ box as not yet applied may bring this prospective version into force.
Changes to legislation:
There are currently no known outstanding effects for the The Weighing Equipment (Automatic Gravimetric Filling Instruments) Regulations 2000, SCHEDULE 4.
Changes to Legislation
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
regulation 6(b)
SCHEDULE 4E+W+S(Descriptive markings and verification markings: Extract from Part 1 of OIML R 61 and additional marking)
Descriptive markingsE+W+S
3.10 Filling instruments shall bear the following markings.
Markings shown in fullE+W+S
3.10.1
• name or identification mark of the manufacturer |
• name or identification mark of the importer (if applicable) |
• serial number and type designation of the instrument |
• product(s) designation (i.e. materials that may be weighed) |
• temperature range (if applicable, see 2.5.1 in Schedule 2) in the form: | …°C/…°C |
• electrical supply voltage in the form: | …V |
• electrical supply frequency in the form: |
…Hz |
• working fluid pressure (if applicable) in the form: | …kPa |
• average number of loads per fill (if applicable) | … |
• maximum fill (if applicable) | … |
• rated minimum fill (if applicable) | … |
• maximum rate of operation (if applicable) in the form: | …loads per minute |
Markings shown in codeE+W+S
3.10.2
• pattern approval sign |
• indication of the accuracy class X(x) |
• reference value for accuracy class Ref(x) |
• scale interval (if applicable) in the form: | d=… |
• maximum capacity in the form: | Max=… |
• minimum capacity (or minimum discharge where applicable) in the form: | Min=… |
• maximum additive tare in the form: | T=+… |
• maximum subtractive tare in the form: | T=−… |
An instrument may be verified for different materials for which different classes apply or which require different operating parameters to maintain limits of error. Marking shall be such that the alternative class or operating parameters are clearly associated with the appropriate material designation.
Presentation of descriptive markingsE+W+S
3.10.3 The descriptive markings shall be indelible and of a size, shape and clarity to enable legibility under normal conditions of use of the filling instrument. They shall be grouped together in a clearly visible place on the filling instrument, either on a data plate fixed to the instrument or on the filling instrument itself.
Where the markings are placed on a data plate, it shall be possible to seal the plate bearing the markings. Where they are marked on the filling instrument itself, it shall not be possible to remove them without destroying them.
The descriptive markings may be shown on a programmable display which is controlled by software. In this case, means shall be provided for any access to reprogramming of the markings to be automatically and non-erasably recorded, e.g. by traceable access software. When a programmable display is used, the plate on the instrument shall bear at least the following markings:
type and designation of the instrument,
name or identification mark of the manufacturer,
pattern approval number,
electrical supply voltage,
electrical supply frequency,
pneumatic pressure.
Verification marksE+W+S
PositionE+W+S
3.11.1 The filling instrument shall have a place for the application of verification marks. This place shall:
be such that the part on which it is located cannot be removed from the filling instrument without damaging the marks,
allow easy application of the mark without changing the metrological qualities of the filling instrument,
be visible without the filling instrument having to be moved when it is in service.
MountingE+W+S
3.11.2 Filling instruments required to bear verification marks shall have a verification mark support, at the place provided for above, which shall ensure the conservation of the marks.
When the mark is made with a stamp, this support may consist of a strip of lead or any other material with similar qualities, inserted into a plate fixed to the filling instrument or a cavity bored in the filling instrument itself.
Additional descriptive markingE+W+S
Filling instruments shall bear the additional descriptive marking “ R 61” which shall be presented in accordance with the provisions of clause 3.10.3 of Part 1 of OIML R 61 and, when a programmable display is used, the plate on the instrument shall bear that marking also.