Search Legislation

The Railtrack (Shortlands Junction) Order 2001

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

Articles 2(1) and 4

SCHEDULE 1THE SCHEDULED WORKS

In this Schedule references to “the Catford Loop Lines” are to the railway between Nunhead and Shortlands and references to “the Chatham Main Lines”, “the Chatham Lines”, “the Chatham Fast Line” and “the Chatham Slow Line” are to the railway between London Victoria and Chatham.

In the London Borough of Bromley—

  • Work No. 1—A railway (1,045 metres in length) commencing by a junction with the Catford Loop Lines at a point 343 metres north of the northern side of the bridge (number 490) carrying Downs Hill over that railway, passing southwards beneath that road, then passing through a reinforced concrete tunnel box under the Chatham Lines between Beckenham Junction and Shortlands Stations and terminating by a junction with the up Chatham Fast Line at Shortlands Station at a point 61 metres south-east of the southern side of the bridge (number 55) carrying that up fast line over Beckenham Lane, including the said tunnel box and the provision of a reinforced concrete box at the western end of the said bridge carrying Downs Hill so as to carry the railway under that road.

  • Work No. 1A—A railway (302 metres in length), forming a connection between Work No. 1 and the down Chatham Fast Line, commencing by a junction with Work No.1 at a point 232 metres north-west of the western side of the bridge (number 55) carrying the said down fast line over Beckenham Lane, passing south-eastwards and terminating by a junction with that down fast line at Shortlands Station at a point 53 metres south-east of the southern side of the said bridge number 55.

  • Work No. 2—A railway (442 metres in length), being a realignment of the Catford Loop Lines, commencing by a junction with Work No.1 at a point 10 metres south-east of its commencement, passing southwards beneath Downs Hill, and terminating by a junction with the Catford Loop Lines at a point 97 metres south-east of the southern side of the bridge (number 490) carrying Downs Hill over that railway.

  • Work No. 3—A railway (690 metres in length), being a realignment of the Chatham Fast Lines between Beckenham Junction and Shortlands Stations, commencing by a junction with the Chatham Main Lines at a point 6 metres east of the eastern side of the bridge (number 54) carrying Downs Bridge Road over the said railway, passing eastwards then south-eastwards and terminating by a junction with Work No.1 at a point 4 metres north-west of the northern side of the bridge (number 55) carrying the up Chatham Fast Line over Beckenham Lane, including a subway under the railway to gain access for maintenance purposes.

  • Work No. 4—A railway (401 metres in length), being a raising of the Chatham Slow Lines, commencing by a junction with the Chatham Main Lines at a point 6 metres east of the eastern side of the bridge (number 54) carrying Downs Bridge Road over the said railway, passing eastwards over the tunnel box comprised in Work No. 1 and terminating by a junction with the Chatham Slow Lines at a point 395 metres east of the eastern side of the said bridge number 54.

  • Work No. 4A—A railway (357 metres in length), forming a connection between the up Chatham Slow Line and the down Chatham Fast Line, commencing by a junction with Work No. 4 at a point 359 metres east of the eastern side of the bridge (number 54) carrying Downs Bridge Road over the Chatham Lines, passing south-eastwards and terminating by a junction with Work No. 1A at a point 4 metres north-west of the bridge (number 55) carrying the down Chatham Fast Line over Beckenham Lane.

  • Work No. 5A—An access road, including a reconstruction of the existing access to 31 Downs Hill, commencing at the junction of that access with Downs Hill, passing south-eastwards and terminating at a point 133 metres south-east of its commencement.

  • Work No. 5B—An access road for construction purposes, commencing by a junction with the access road (Work No. 5A) at its commencement, passing southwards and terminating at a point 83 metres south of its commencement.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources