xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

SCHEDULES

Article 4

SCHEDULE 1E+W+STHE SCHEDULED WORKS

Commencement Information

I1Sch. 1 in force at 9.11.2001, see art. 1

In this Schedule—

“the East London Line” means the railway of the Company that runs between Shoreditch station and New Cross station and New Cross Gate station and the extensions authorised by this Order;

“the London Bridge to New Cross railway” means so much of that part of the railway of Railtrack that runs between London Bridge station and New Cross station;

“the London Bridge to Brockley railway” means so much of that part of the railway of Railtrack that runs between London Bridge station and Brockley station; and

“the South London Line” means so much of that part of the railway of Railtrack that runs between South Bermondsey station and Queens Road Peckham station.

In the London borough of Southwark and the London borough of Lewisham—

In the London borough of Lewisham—