- Latest available (Revised)
- Original (As made)
This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
Articles 2(1), 3(1) and 4
1. The works which the undertaker is authorised to construct and maintain by article 3(1) are the following works on the bed of the North Sea adjoining the coast at Overstrand near Cromer in the district of North Norfolk, county of Norfolk:
(a)Up to 30 wind turbines fixed to the seabed by tripod foundations and extending to a height of up to 137.8 metres above the level of high water, fitted with rotating blades with a diameter of up to 110 metres and situated at the following locations:
Wind turbine number | Latitude North | Longitude East |
---|---|---|
A 1 | 52° 58.655− | 01° 22.193− |
A 2 | 52° 59.013− | 01° 22.111− |
A 3 | 52° 59.371− | 01° 22.029− |
A 4 | 52° 59.728− | 01° 21.947− |
A 5 | 53° 00.086− | 01° 21.865− |
A 6 | 53° 00.444− | 01° 21.783− |
A 7 | 53° 00.802− | 01° 21.701− |
A 8 | 53° 01.160− | 01° 21.619− |
A 9 | 53° 01.517− | 01° 21.537− |
A 10 | 53° 01.875− | 01° 21.455− |
B 1 | 52° 58.707− | 01° 22.808− |
B 2 | 52° 59.064− | 01° 22.726− |
B 3 | 52° 59.422− | 01° 22.645− |
B 4 | 52° 59.780− | 01° 22.563− |
B 5 | 53° 00.138− | 01° 22.481− |
B 6 | 53° 00.496− | 01° 22.399− |
B 7 | 53° 00.853− | 01° 22.317− |
B 8 | 53° 01.211− | 01° 22.235− |
B 9 | 53° 01.569− | 01° 22.153− |
B 10 | 53° 01.927− | 01° 22.071− |
C 1 | 52° 58.758− | 01° 23.424− |
C 2 | 52° 59.116− | 01° 23.342− |
C 3 | 52° 59.474− | 01° 23.260− |
C 4 | 52° 59.831− | 01° 23.178− |
C 5 | 53° 00.189− | 01° 23.097− |
C 6 | 53° 00.547− | 01° 23.015− |
C 7 | 53° 00.905− | 01° 22.933− |
C 8 | 53° 01.263− | 01° 22.851− |
C 9 | 53° 01.620− | 01° 22.769− |
C 10 | 53° 01.978− | 01° 22.687− |
(b)a network of cables buried under the seabed, connecting the wind turbines to each other;
(c)up to three marine feeder cables buried under the seabed connecting the wind turbines to the shore commencing by a connection with wind turbine number A1 and then proceeding in a southerly direction for 6811 metres until they reach a point beneath the level of high water.
2. In this schedule references to the locations of a wind turbine are references to the centre point of that turbine. Chart datum is WGS 84.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: