Explanatory Note
This Order provides for the construction of railway and other works for the purposes of increasing the operating capacity of Network Rail’s railways serving St. Pancras, Farringdon, Blackfriars and London Bridge Stations and improving facilities. The Order also provides for the lengthening of platforms and related works at 61 other stations (most of them outside Central London) to enable the existing Thameslink network to be upgraded and extended.
A copy of the deposited plans and the deposited sections prescribed by rule 7(1)(a), 7(2) and 7(3) of the Transport and Works (Applications and Objections Procedure) Rules 1992 and certified in accordance with article 48 may be inspected at the offices of the Company Secretary to, Network Rail Infrastructure Limited, 40 Melton Street, Euston Square, London NW1 2EE.
Back to top