PART 2Subsystems

Project subsystems: verification assessment procedureI19

1

Subject to regulation 15(3), the appropriate verification assessment procedure in relation to a project subsystem for the purpose of regulation 8(3)(b), shall be—

a

in so far as that subsystem is required to conform with all or part of a TSI, the procedures specified in the TSI or part of the TSI, with which that subsystem is required to conform;

b

in so far as that subsystem is required to conform with notified national technical rules, such procedures as are reasonably appropriate to assess that project subsystem against the notified national technical rules with which it is required to conform; and

c

the procedures set out in Schedule 9.

2

The notified body shall—

a

compile the technical file; and

b

verify the interface between the project subsystem and the rail system in which it will be placed in service.