SCHEDULE 9U.K.(This Schedule substantially reproduces, with minor modifications, the provisions of Annex VI to the High-Speed Directive and to the Conventional Directive)

VERIFICATION PROCEDURE FOR SUBSYSTEMSU.K.

STAGESU.K.

2.  The subsystem is checked at each of the following stages:

  • overall design;

  • construction of subsystem, including, in particular, civil-engineering activities, constituent assembly, overall adjustment;

  • final testing of the subsystem.