2007 No. 3531

CHANNEL TUNNEL
HEALTH AND SAFETY

The Channel Tunnel (Safety) Order 2007

Made

Laid before Parliament

Coming into force in accordance with article 1(1)

The Secretary of State for Transport makes the following Order in exercise of the powers conferred by section 11(1) (a) and (g), (2) (a) and (b), and (3) (a), (b) and (f) of the Channel Tunnel Act 19871.

Citation, commencement and extentI11

1

This Order may be cited as the Channel Tunnel (Safety) Order 2007 and comes into force on the date on which the Regulation comes into force in accordance with article 77 of the Regulation. That date will be notified in the London, Edinburgh and Belfast Gazettes.

2

Subject to paragraph (3), this Order does not extend to Northern Ireland.

3

The following articles of this Order extend to Northern Ireland—

a

article 3 in so far as it relates to article 75 of the Regulation; and

b

article 9.

Annotations:
Commencement Information
I1

Art. 1 comes into force in accordance with art. 1(1)

InterpretationI22

In this Order—

  • “the 1974 Act” means the Health and Safety at Work etc. Act 19742;

  • “the Fixed Link” means the Channel fixed link as defined in Article 1(2) of the Treaty;

  • “the Intergovernmental Commission” means the Commission established under Article 10 of the Treaty to supervise, in the name and on behalf of the Government of the United Kingdom of Great Britain and Northern Ireland and the Government of the French Republic, all matters concerning the construction and operation of the Fixed Link;

  • “railway undertaking” has the same meaning as in article 1xx of the Regulation;

  • “Regulation” means the provisions set out in the Schedule (being a regulation drawn up by the Intergovernmental Commission, under Article 10(3) (e) of the Treaty, on the safety of the Fixed Link); and

  • the Treaty” means the Treaty between the United Kingdom of Great Britain and Northern Ireland and the French Republic concerning the construction and operation by private concessionaires of the Fixed Link signed at Canterbury on 12th February 19863.

Annotations:
Commencement Information
I2

Art. 2 comes into force in accordance with art. 1(1)

Regulation has the force of lawI33

The Regulation has the force of law.

Annotations:
Commencement Information
I3

Art. 3 comes into force in accordance with art. 1(1)

Enforcement of the RegulationI44

1

Subject to paragraphs (5) and (6), it is the duty of the Office of Rail Regulation to make adequate arrangements for the enforcement of the Regulation.

2

Subject to paragraphs (4) to (6), the provisions of the 1974 Act specified in paragraph (3) (the “specified provisions”) apply for the purposes of the enforcement of the Regulation as if in the specified provisions—

a

a reference to the “enforcing authority” was a reference to the Office of Rail Regulation;

b

a reference to the “relevant statutory provisions” was a reference to the Regulation and to the specified provisions; and

c

a reference to “health and safety regulations” was a reference to the Regulation.

3

The provisions of the 1974 Act referred to in paragraph (2) are—

a

sections 19 and 20 (appointment and powers of inspectors)4, excluding section 20 (3);

b

sections 21 and 22 (improvement and prohibition notices)5;

c

section 23 (provisions supplementary to sections 21 and 22)6, excluding section 23(6);

d

section 24 (appeal against improvement or prohibition notice)7;

e

section 25 (power to deal with cause of imminent danger);

f

section 26 (power to indemnify inspectors);

g

section 28 (restrictions on disclosure of information)8;

h

sections 33 (1) (c), (e) to (h), (k) to (o), (2), (2A) and (3), 34 (1) (c) and (d) and (2) to (5), 35, 36 (1) and (2), 37 to 41 and 42 (1) to (3) (provisions as to offences)9; and

i

section 46 (service of notices).

4

For the purposes of the enforcement of the Regulation section 33(1)(c) of the 1974 Act (offences) only applies to contraventions of—

a

articles 13 iv, 15 iv, 16, 22 to 25, 27, 34 (a) and (b), 39, 51, 52 (a) and (b) and 61 of the Regulation; and

b

any requirement or prohibition to which a person is subject by virtue of the terms of or any condition or restriction attached to any—

i

authorisation of rolling stock;

ii

safety authorisation; or

iii

Part B certificate;

given under the Regulation, including any deemed authorisation or Part B certificate referred to in articles 66, 73 or 74 of the Regulation.

5

Paragraphs (1) and (2) do not apply in respect of the following articles of the Regulation—

a

articles 6 and 7 (safety authority);

b

articles 56 to 60 (access to training facilities); and

c

articles 67 to 72 (investigations into accidents and incidents).

6

Paragraphs (1) and (2) do not apply for the purpose of enforcing the obligations of the Intergovernmental Commission under the Regulation.

Annotations:
Commencement Information
I4

Art. 4 comes into force in accordance with art. 1(1)

Access to training facilitiesI55

1

Any railway undertaking whose train drivers or staff performing vital safety tasks are denied the entitlements conferred by articles 56, 57(a) and 58 of the Regulation has a right of appeal to the Office of Rail Regulation.

2

In relation to training services to which article 59 of the Regulation applies, a railway undertaking which considers that the price charged for access to those services is unreasonable or discriminatory has a right of appeal to the Office of Rail Regulation.

3

A person who is denied any entitlement conferred on him by article 60 of the Regulation has a right of appeal to the Office of Rail Regulation.

4

The provisions of regulation 5(3) to (5) of the Railways (Access to Training Services) Regulations 200610 (appeal to the regulatory body) apply to any appeal made under this article as if reference to an appeal in those provisions included reference to an appeal under this article.

Annotations:
Commencement Information
I5

Art. 5 comes into force in accordance with art. 1(1)

Civil liabilityI66

1

Breach of a duty requirement or prohibition imposed by articles 13 iv, 15 iv, 22 to 25, 27, 34 (a) and (b), 39, 51, 52 (a) and (b) and 61 of the Regulation is, so far as it causes damage, actionable.

2

Subject to paragraphs (1) and (3) and to article 5 of this Order, nothing in this Order is to be construed as conferring a right of action in any civil proceedings in respect of any failure to comply with any duty requirement or prohibition imposed by the Regulation.

3

Paragraph (2) is without prejudice to any right to apply for judicial review which an aggrieved person may have under article 76 of the Regulation.

4

Paragraphs (1) and (2) are without prejudice to any right of action which exists apart from the provisions of this Order.

5

Any term of an agreement which purports to exclude or restrict the operation of paragraph (1), or any liability arising by virtue of that paragraph, is void.

6

In this article “damage” includes the death of, or injury to, any person (including any disease and any impairment of a person’s physical or mental condition).

Annotations:
Commencement Information
I6

Art. 6 comes into force in accordance with art. 1(1)

Investigations into accidents and incidentsI77

Nothing in this Order or the Regulation prejudices or affects the provisions of Part 1 of the Railways and Transport Safety Act 200311 or the Railways (Accident Investigation and Reporting) Regulations 200512.

Annotations:
Commencement Information
I7

Art. 7 comes into force in accordance with art. 1(1)

Power to impose chargesI88

The Intergovernmental Commission may impose charges reflecting their administrative costs of processing applications for the following—

a

Part B certificates as required by article 39(ii) of the Regulation, including their renewal under article 50 or modification under article 52 of the Regulation, and

b

authorisation under article 61 of the Regulation for operating rolling stock on the Fixed Link.

Annotations:
Commencement Information
I8

Art. 8 comes into force in accordance with art. 1(1)

Amendments to the Channel Tunnel (International Arrangements) Order 2005I99

1

The Channel Tunnel (International Arrangements) Order 200513 is amended as follows.

2

In the Schedule (International Articles)—

a

in Article 6 (exercise of access or transit rights) for paragraph (c) substitute—

c

has received and continues to hold a safety certificate as required by article 39 of the Regulation of the Intergovernmental Commission transposing Directive 2004/49/EC of the European Parliament and of the Council (the Railway Safety Directive) signed on 24th January 2007;

b

in Article 12 (regulatory body) for sub-paragraph (1) (f) substitute—

f

arrangements for access to the network.

Annotations:
Commencement Information
I9

Art. 9 comes into force in accordance with art. 1(1)

Amendment to the Railways and Other Guided Transport Systems (Safety) Regulations 2006I1010

For paragraph 1 (b) (i) of Schedule 2 to the Railways and Other Guided Transport Systems (Safety) Regulations 200614 (application for a safety certificate) substitute—

i

a copy of a current certificate issued to the applicant by—

aa

the Office of Rail Regulation, other than a deemed safety certificate;

bb

a safety authority in another member State;

cc

a safety authority in Northern Ireland; or

dd

the safety authority for the tunnel system within the meaning of section 1(7) of the Channel Tunnel Act 198715,

under provisions giving effect to article 10(2)(a) of the Directive which relates to an equivalent railway operation; or

Annotations:
Commencement Information
I10

Art. 10 comes into force in accordance with art. 1(1)

Signed by authority of the Secretary of State for Transport

Tom HarrisParliamentary Under Secretary of StateDepartment for Transport

SCHEDULEREGULATION OF THE INTERGOVERNMENTAL COMMISSION ON THE SAFETY OF THE CHANNEL FIXED LINK

Article 3

The Intergovernmental Commission (Intergovernmental Commission">IGC), established to supervise all matters concerning the construction and operation of the Fixed Link in the name of the British and French governments and by delegation from them;

Having regard to the Treaty between the United Kingdom of Great Britain and Northern Ireland and the French Republic concerning the construction and operation by private concessionaires of a cross-channel Fixed Link, signed at Canterbury on 12th February 1986 (“the Treaty”), and in particular Articles 1 and 10 thereof;

Having regard to Council Directive 95/18/EC dated 19 June 199516 on the licensing of railway undertakings, amended by Directive 2001/13/EC of the European Parliament and of the Council of 26th February 200117 and Directive 2004/49/EC of the European Parliament and of the Council of 29th April 200418;

Having regard to Directive 2004/49/EC of the European Parliament and the Council of 29th April 2004 on the safety of Community railways and amending Council Directive 95/18/EC on the licensing of railway undertakings as well as Directive 2001/14/EC19 on the allocation of railway infrastructure capacity and the levying of charges for the use of railway infrastructure and safety certification;

Having regard to Directive 2004/50/EC of the European Parliament and of the Council of 29th April 200420 amending Council Directive 96/48/EC21 on the interoperability of the trans-European high-speed railway system and to Directive 2001/16/EC of the European Parliament and of the Council22 on the interoperability of the trans-European conventional railway system;

Having regard to Directive 2004/51/EC of the European Parliament and the Council of 29th April 200423 modifying Council Directive 91/440/EEC24 on the development of the Community’s railways;

Having regard to Regulation (EC) 881/2004 of the European Parliament and of the Council of 29th April 200425 establishing a European Railway Agency;

Having regard to Decision 884/2004/EC of the European Parliament and of the Council of 29th April 200426 amending Decision 1692/96/EC27 on Community guidelines for the development of the trans-European transport network;

Having regard to the provisions made by the United Kingdom of Great Britain and Northern Ireland and the French Republic for the transposition of Articles 19 to 25 of Directive 2004/49/EC;

Having regard to the quadripartite Concession signed on 14th March 1986 between the Secretary of State for Transport of the United Kingdom of Great Britain and Northern Ireland and the ministre de l'urbanisme, du logement et des transports representing the French State on the one part, and France-Manche SA and the Channel Tunnel Group Ltd on the other part (the Concession)28;

Having regard to the regulation of the Intergovernmental Commission of 25th October 200529 concerning the use of the Channel Tunnel by international groupings or railway undertakings;

Considering the specific nature of the investment undertaken to assure the design, financing, construction and, since 1994, operation of the Channel Tunnel;

Considering the need to ensure a unified safety regime within the boundaries of the cross-border infrastructure of the Fixed Link;

Considering that the unified safety regime takes account of the specific risks of the Fixed Link;.

Having consulted the Safety Authority established by the Treaty;

Has adopted the following regulation:

Chapter 1

DefinitionsI111

i

“Accident” means an unwanted or unintended sudden event or a specific chain of such events which have harmful consequences; accidents are divided into the following categories: collisions, derailments, level-crossing accidents, accidents to persons caused by rolling stock in motion, fires and others.

ii

“Agency” means the European Railway Agency, that is to say, the Community agency for railway safety and interoperability established by the aforementioned Regulation (EC) No 881/2004.

iii

“Common safety indicators” (“CSIs”) means the common safety indicators referred to in Annex 2 to this Regulation.

iv

“Common safety methods” (“CSMs”) means the methods to be developed by the Agency to describe how safety levels and achievement of safety targets and compliance with other safety requirements are assessed.

v

“Common safety targets” (“CSTs”) means the safety levels, to be drawn up by the Agency, that must at least be reached by different parts of the rail system (such as the high speed rail system and long railway tunnels) and by the system as a whole, expressed in risk acceptance criteria.

vi

“Common Section” means that part of the Fixed Link which is normally used by all categories of trains for the delivery of the services described in Article 1 of the Intergovernmental Commission Regulation of 25 October 2005 concerning the use of the Channel Tunnel by international groupings or railway undertakings.

vii

“Concession” has the meaning given in Article 1 of the Treaty.

viii

“Concessionaires” has the meaning given in Article 1 of the Treaty.

ix

“Fixed Link” means the Channel Fixed Link as defined in Article 1.2 of the Treaty.

x

“Incident” means any occurrence, other than accident or serious accident, associated with the operation of trains and affecting the safety of operations.

xi

“Infrastructure manager” means any body or undertaking that is responsible in particular for establishing and maintaining railway infrastructure, or a part thereof, as defined in Article 3 of Directive 91/440/EEC. The Concessionaires are the infrastructure manager for the Fixed Link, in accordance with the Treaty, and are responsible also for the management of infrastructure control and safety systems.

xii

Intergovernmental Commission” (“Intergovernmental Commission">IGC”) means the Intergovernmental Commission, established by Article 10 of the Treaty to supervise, in the name and on behalf of the governments of the United Kingdom of Great Britain and Northern Ireland and of the French Republic, all matters concerning the construction and operation of the Fixed Link.

xiii

“Interoperability constituents” means any elementary component, group of components, subassembly or complete assembly of equipment incorporated or intended to be incorporated into a subsystem upon which the interoperability of the high-speed or conventional rail system depends either directly or indirectly, as defined in Directives 96/48/EC and 2001/16/EC. The concept of a “constituent” covers both tangible objects and intangible objects such as software.

xiv

“Investigation” means a process conducted for the purpose of accident and incident prevention which includes the gathering and analysis of information, the drawing of conclusions, including the determination of causes and, when appropriate, the making of safety recommendations.

xv

“Investigating bodies” means the national British and French investigating bodies, respectively:

a

the Rail Accident Investigation Branch (“RAIB”) established by the Railways and Transport Safety Act 200330;

b

the French Office for the investigation of land transport accidents (bureau d'enquêtes sur les accidents de transport terrestre “BEA-TT”) established by law n° 2002 — 3 of 3rd January 2002 and decree n° 2004 — 85 of 26th January 2004 amended.

xvi

“Notified bodies” means the bodies which are responsible for assessing the conformity or suitability for use of the interoperability constituents or for appraising the EC procedure for verification of the sub-systems, as defined in Directives 96/48/EC (interoperability of the trans-European high-speed rail system) and 2001/16/EC (interoperability of the trans-European conventional rail system).

xvii

“Part A certificate” means safety certification confirming acceptance of a railway undertaking’s safety management system, issued by the safety authority in the Member State where that railway undertaking first established its operations.

xviii

“Part B certificate” means safety certification issued to railway undertakings by the Intergovernmental Commission under this Regulation and valid solely in respect of their operations on the Common Section.

xix

“Railway system” means the whole of the railway network of the Fixed Link:

a

which is constituted by all or part of the subsystems in the structural and functional fields as defined in Directives 96/48/EC and 2001/16/EC, including:

  • the railway infrastructure and fixed equipment;

  • the rolling stock authorised to run on this infrastructure;

  • the equipment for preventing and protecting against risks in the Tunnel;

  • the elements necessary for the management and operation of the railway system as a whole,

b

and which also incorporates the Concessionaires' shuttle services for road vehicles.

xx

“Railway undertaking” means any railway undertaking as defined in Directive 2001/14/EC and any other public or private undertaking, the activity of which is to provide transport of goods and/or passengers by rail on the basis that the undertaking must provide traction; this also includes undertakings which provide traction only. However, it does not include the Concessionaires, whose transport operations are limited to the provision of shuttle services for road vehicles through the Channel Tunnel.

xxi

“Safety Authority” means the body appointed by France and the United Kingdom to perform the tasks relating to the safety of the Fixed Link in accordance with Article 3.g and Article 16 of Directive 2004/49/EC in order to ensure a unified safety regime for the specific cross-border infrastructure of the Channel Tunnel.

xxii

“Safety management system” (“SMS”) means the organisation and provisions drawn up by an infrastructure manager or a railway undertaking to ensure the safe management of its activities.

xxiii

“Serious accident” means any train collision or derailment resulting in at least one fatality or serious injury to at least five persons, or extensive damage to rolling stock, to the infrastructure, or to the environment, and any other similar accident having an obvious impact on the regulation or the management of railway safety; “extensive damage” means damage which may be immediately assessed by the competent investigating body at a total of at least 2 million euro.

xxiv

“Technical specifications for interoperability” (“TSI”) means the specifications by which each subsystem or part of a subsystem is covered in order to meet the essential requirements and ensure the interoperability of the trans-European high-speed and conventional rail systems as defined in Directives 96/48/EC and 2001/16/EC.

xxv

“Treaty” means the Treaty between the United Kingdom of Great Britain and Northern Ireland and the French Republic concerning the construction and operation by private concessionaires of a cross-channel fixed link, signed at Canterbury on 12th February 1986.

xxvi

“Unified safety rules” means the safety rules as notified to the European Commission which apply to the Fixed Link and describe the safety requirements to be observed in the design, maintenance and operation of the railway system. The objective of these rules is to contribute to the overall level of safety.

Annotations:
Commencement Information
I11

Sch. Pt. 1 para. 1 comes into force in accordance with art. 1(1)

Chapter 2Duties and responsibilities

Safety Authority

I122

The Intergovernmental Commission is the Safety Authority for the Fixed Link.

Annotations:
Commencement Information
I12

Sch. Pt. 2 para. 2 comes into force in accordance with art. 1(1)

I133

The Intergovernmental Commission, taking into account the specific characteristics of the railway system, shall ensure that the overall safety level of the Fixed Link is maintained and, where that is reasonably practicable, continuously improved, by taking account of changes to Community legislation, as well as technical and scientific progress, and by giving priority to the prevention of serious accidents.

Annotations:
Commencement Information
I13

Sch. Pt. 2 para. 3 comes into force in accordance with art. 1(1)

I144

The tasks of the Intergovernmental Commission, as Safety Authority, shall be at least the following:

i

authorising the placing in service (in accordance with the requirements of Article 14 of both Directive 96/48/EC and Directive 2001/16/EC), of any structural subsystems which would constitute part of the trans-European high speed rail system, or part of the trans-European conventional rail system, which are proposed to be located or operated within the Fixed Link;

ii

verifying that any such structural subsystems placed in service are operated and maintained in accordance with the relevant essential requirements;

iii

supervising, in so far as relevant for the railway system, that the interoperability constituents are in compliance with the essential requirements as required by Article 12 of both Directives 96/48/EC and 2001/16/EC;

iv

authorising the placing in service in the Fixed Link of new or substantially modified rolling stock that is not covered by a technical specification of interoperability;

v

as already established through the Concession, authorising the placing in service in the Fixed Link of new or substantially modified rolling stock used for operating shuttle services for road vehicles;

vi

issuing, renewing, amending and revoking relevant parts of safety certification granted to railway undertakings in so far as it relates to the Fixed Link;

vii

issuing, renewing, amending and revoking relevant parts of the safety authorisation granted to the Concessionaires;

viii

verifying that with regard to the Fixed Link the conditions and requirements of safety certification and authorisation are fulfilled and that the activities of railway undertakings and the Concessionaires comply with the requirements of Community and national legislation and the regulations of the Intergovernmental Commission;

ix

monitoring, promoting and, where appropriate, enforcing and developing the safety regulatory framework applicable to the railway system, including the unified safety rules;

x

checking that the rolling stock authorised to run on the Fixed Link is duly registered with safety related information in a national register drawn up in accordance with Article 14 of both Directive 96/48/EC and Directive 2001/16/EC, and that the information so registered is correct and kept up to date;

xi

by 30th September 2007 and thereafter annually by 30th September at the latest each year, publishing and sending to the Agency an annual report concerning its activities in the preceding year, including information on the development of railway safety, common safety indicators, safety certification and safety authorisation; any important changes in legislation and regulation concerning railway safety in the Fixed Link; and the results of and experience relating to the supervision of the Concessionaires and railway undertakings.

Annotations:
Commencement Information
I14

Sch. Pt. 2 para. 4 comes into force in accordance with art. 1(1)

I155

a

The Intergovernmental Commission shall perform its tasks in an open, non-discriminatory and transparent way. In particular, it shall allow all parties to be heard and shall indicate the reasons for its decisions.

b

It shall promptly respond to requests and applications and communicate its requests for information without delay and adopt all its decisions within four months after all requested information has been provided.

Annotations:
Commencement Information
I15

Sch. Pt. 2 para. 5 comes into force in accordance with art. 1(1)

I166

a

To carry out the aforementioned tasks, the Intergovernmental Commission:

i

may request, at any time, technical assistance from the Concessionaires, the railway undertakings or other qualified bodies;

ii

shall carry out any inspections and investigations necessary, invoking the assistance of the authorities of each Government or any body or expert of its choice in accordance with the provisions of Articles 10(7), 10(8), 11(6) and 11(8) of the Treaty. Without prejudice to the powers of inspection granted to the Intergovernmental Commission under the Concession, in France such inspections and investigations are conducted under the same conditions as those established for inspections and investigations undertaken by the safety authorities of the French Republic in fulfilling their functions outside the Fixed Link, and in Great Britain are conducted in accordance with relevant statutory powers.

b

To assist the Intergovernmental Commission in carrying out the aforementioned tasks the Concessionaires and railway undertakings shall, on request, give the Intergovernmental Commission access to all relevant documents and to their premises, installations and equipment.

Annotations:
Commencement Information
I16

Sch. Pt. 2 para. 6 comes into force in accordance with art. 1(1)

I177

The Intergovernmental Commission may duly authorise persons for the purposes of Article 6(a)ii. Such persons shall carry out these tasks in such a way as to cause the minimum of disruption to the operation of the Fixed Link consistent with the purpose for which the persons concerned are lawfully there, which is to check compliance with safety requirements in accordance with the conditions for award of safety authorisation to the Concessionaires and of Part B certificates to railway undertakings.

Annotations:
Commencement Information
I17

Sch. para. 7 comes into force in accordance with art. 1(1)

I188

The Concessionaires and the railway undertakings shall provide information on request to the Intergovernmental Commission on any question relating to safety. In addition, they shall advise the Intergovernmental Commission immediately of:

i

serious accidents on the railway system;

ii

any other accidents or incidents which fall within categories specified and notified to them by the Intergovernmental Commission.

Annotations:
Commencement Information
I18

Sch. para. 8 comes into force in accordance with art. 1(1)

I199

The Concessionaires and any railway undertakings which use the Common Section shall, on request, provide to the Intergovernmental Commission appropriate information on significant incidents, incidents from which worthwhile safety lessons may be learned, and investigations that are likely to have relevance to the safety of the railway system.

Annotations:
Commencement Information
I19

Sch. para. 9 comes into force in accordance with art. 1(1)

I2010

In order to monitor and evaluate the implementation of the safety requirements applicable to the Fixed Link, and without prejudice to its rights under the Concession to receive reports and information from the Concessionaires, the Intergovernmental Commission shall collect relevant material through the common safety indicators described in Annex 2 and through any other indicators relating to the Fixed Link which it thinks appropriate.

Annotations:
Commencement Information
I20

Sch. para. 10 comes into force in accordance with art. 1(1)

Infrastructure manager

I2111

The Concessionaires are the infrastructure manager for the Fixed Link.

Annotations:
Commencement Information
I21

Sch. para. 11 comes into force in accordance with art. 1(1)

I2212

Without prejudice to civil liability established in conformity with legal requirements, the Concessionaires are responsible for the railway system and its safe operation, including the supply of material and the contracting of services, vis-à-vis users, customers, the workers concerned and third parties.

Annotations:
Commencement Information
I22

Sch. para. 12 comes into force in accordance with art. 1(1)

I2313

For this purpose and without prejudice to their responsibilities under the Concession, the Concessionaires shall take all necessary measures and in particular shall:

i

implement any necessary risk control measures, where appropriate in co-operation with railway undertakings;

ii

comply with Community and national legislation and the unified safety rules applying to the railway system;

iii

be responsible for the compliance of the shuttle service operations for road vehicles with the safety requirements for the Common Section;

iv

ensure that rolling stock used for operating shuttle services for road vehicles is authorised to run on the Common Section;

v

ensure that rolling stock used to operate their shuttle services for road vehicles is in safe condition;

vi

ensure that railway undertakings and sub-contractors have access to all information necessary for them to fulfil their responsibilities on the training and certification of staff undertaking safety-related work, including information on specific procedures for preventing and protecting against risks in the tunnel;

vii

ensure that their staff undertaking safety-related work have been trained, and possess and maintain the appropriate skills and certification;

viii

take any necessary protective measures if they identify, or are advised of, a situation presenting a clear and present safety risk arising from a serious or repeated failure of the railway undertakings to respect the unified safety rules;

ix

advise the Intergovernmental Commission of any serious or repeated failure of the railway undertakings to respect the unified safety rules and of any protective measures taken, in order for the Commission to assess the action to be taken, in particular action under Article 54.

Annotations:
Commencement Information
I23

Sch. para. 13 comes into force in accordance with art. 1(1)

Railway undertakings

I2414

Without prejudice to civil liability established in conformity with legal requirements, every railway undertaking is responsible for the safe operation of its activities on the Common Section, including the supply of material and the contracting of services vis-à-vis users, customers, the workers concerned and third parties.

Annotations:
Commencement Information
I24

Sch. para. 14 comes into force in accordance with art. 1(1)

I2515

For this purpose railway undertakings shall take all appropriate measures and in particular shall:

i

implement any necessary risk control measures, where appropriate in cooperation with the Concessionaires;

ii

comply with the requirements of the unified safety rules applying to the railway system;

iii

ensure that their staff undertaking safety-related work have been trained, and possess and maintain the appropriate certification and skills, including those relating to the procedures for preventing and protecting against risks in the tunnel;

iv

ensure that the rolling stock used for carrying out their railway transport activities is authorised to run on the Common Section;

v

ensure that the rolling stock used for carrying out their railway transport activities is in safe condition.

Annotations:
Commencement Information
I25

Sch. para. 15 comes into force in accordance with art. 1(1)

Annual safety reportI2616

Every year from 2007 onwards, the Concessionaires and all railway undertakings operating on the Common Section shall submit to the Intergovernmental Commission by 30th June an annual report on safety, relating to their activities within the Fixed Link during the previous calendar year. It shall cover:

i

information on the extent to which the Concessionaires or the railway undertakings have achieved their own safety objectives;

ii

the results of their safety plans;

iii

the common safety indicators referred to in Annex 2 insofar as these indicators are relevant to their activities;

iv

the results of their internal safety audits; and

v

observations on deficiencies and malfunctions of railway operations and infrastructure management that might be relevant for the Intergovernmental Commission.

Annotations:
Commencement Information
I26

Sch. para. 16 comes into force in accordance with art. 1(1)

Unified safety rules

I2717

The Intergovernmental Commission shall ensure that the binding unified safety rules are published in French and English and are made available to Concessionaires, adjacent infrastructure managers, railway undertakings, applicants for a safety certificate and applicants for safety authorisation.

Annotations:
Commencement Information
I27

Sch. para. 17 comes into force in accordance with art. 1(1)

I2818

The unified safety rules supplement the requirements of the technical specifications for interoperability (TSIs) which apply to all or part of the railway system.

Annotations:
Commencement Information
I28

Sch. para. 18 comes into force in accordance with art. 1(1)

I2919

The Intergovernmental Commission shall, taking into account the specific characteristics of the railway system, ensure any necessary amendment of the unified safety rules to take account of the adoption and revision of common safety methods and to achieve at least the common safety targets in accordance with the timescale for the implementation of those targets.

Annotations:
Commencement Information
I29

Sch. para. 19 comes into force in accordance with art. 1(1)

I3020

The Intergovernmental Commission shall advise the governments of France and the United Kingdom of any need to notify the European Commission of any modification to existing unified safety rules or new unified safety rules unless the amendments or proposals wholly relate to the implementation of technical specifications of interoperability.

Annotations:
Commencement Information
I30

Sch. para. 20 comes into force in accordance with art. 1(1)

I3121

In developing the unified safety rules, the Intergovernmental Commission shall consult all persons involved and parties with an interest.

Annotations:
Commencement Information
I31

Sch. para. 21 comes into force in accordance with art. 1(1)

Chapter 3Safety management systems, safety authorisation of Concessionaires and Part B certification of railway undertakings

Safety management systems (SMS)

I3222

The Concessionaires shall draw up and put into effect a safety management system which shows their ability to assume their responsibility for safety.

Annotations:
Commencement Information
I32

Sch. para. 22 comes into force in accordance with art. 1(1)

I3323

The Concessionaires' safety management system shall meet the requirements and contain the elements set out in Annex 1 to this Regulation, adapted with regard to the nature, the importance and other characteristics of the activities undertaken with the aim of ensuring a unified safety regime for the Fixed Link under the conditions set out by the Intergovernmental Commission. Without prejudice to existing national and international liability rules, the Concessionaires' safety management system shall take account, where appropriate and reasonable, of the risks arising as a result of the activities of third parties.

Annotations:
Commencement Information
I33

Sch. para. 23 comes into force in accordance with art. 1(1)

I3424

The Concessionaires' safety management system shall take account of the effect on operating safety of the activities carried out by the different railway undertakings that use the Common Section, and make provision to allow all railway undertakings to operate in accordance with applicable TSIs, relevant national and unified safety rules, and with conditions laid down in their Part B certificate. It shall provide for the co-ordination of the Concessionaires' emergency procedures with those of all the railway undertakings using the Common Section.

Annotations:
Commencement Information
I34

Sch. para. 24 comes into force in accordance with art. 1(1)

I3525

The Concessionaires' safety management system shall contain the necessary provisions to manage risks relating to the introduction of a new element into the railway system or the modification of an existing element of that system.

Annotations:
Commencement Information
I35

Sch. para. 25 comes into force in accordance with art. 1(1)

I3626

Railway undertakings must provide proof to the Intergovernmental Commission of the acceptance of a safety management system by the Member State in which they first established their activities.

Annotations:
Commencement Information
I36

Sch. para. 26 comes into force in accordance with art. 1(1)

Safety authorisation for the Concessionaires

I3727

The Concessionaires may only manage and operate the Fixed Link if they possess a safety authorisation from the Intergovernmental Commission so to do.

Annotations:
Commencement Information
I37

Sch. para. 27 comes into force in accordance with art. 1(1)

I3828

The safety authorisation confirms acceptance by the Intergovernmental Commission of:

a

the Concessionaires' safety management system; and

b

the measures taken by the Concessionaires to comply with specific requirements necessary for the safe design, maintenance and operation of the railway system.

Annotations:
Commencement Information
I38

Sch. para. 28 comes into force in accordance with art. 1(1)

I3929

The Intergovernmental Commission shall provide guidance on the procedures for obtaining the safety authorisation, its duration, and the procedures for issuing, updating, amending, revising, renewing, suspending and revoking it.

Annotations:
Commencement Information
I39

Sch. para. 29 comes into force in accordance with art. 1(1)

I4030

The period of validity of a safety authorisation shall not exceed five years, and will be clearly indicated on the safety authorisation.

Annotations:
Commencement Information
I40

Sch. para. 30 comes into force in accordance with art. 1(1)

I4131

The Concessionaires must submit any request for renewal of their safety authorisation at least four months before its expiry.

Annotations:
Commencement Information
I41

Sch. para. 31 comes into force in accordance with art. 1(1)

I4232

The Intergovernmental Commission shall take a decision on an application for a safety authorisation without delay and in any event not more than four months after all information required, and any supplementary information requested by the Intergovernmental Commission, has been submitted. If the applicant is requested to submit supplementary information, this must be provided promptly.

Annotations:
Commencement Information
I42

Sch. para. 32 comes into force in accordance with art. 1(1)

I4333

Unless otherwise agreed with the Intergovernmental Commission, all applications for a safety authorisation, and supporting documents, shall be submitted in English and French.

Annotations:
Commencement Information
I43

Sch. para. 33 comes into force in accordance with art. 1(1)

I4434

a

The Concessionaires shall without delay inform the Intergovernmental Commission of any substantial changes proposed to the infrastructure, signalling, energy supply or rolling stock or to the principles of their operation and maintenance, and shall propose any appropriate modifications to the safety authorisation.

b

In proposing any introduction of a new element into the railway system or the modification of an existing element of that system the Concessionaires shall ensure that such new elements or modifications would not reduce the overall level of safety and, where reasonably practicable, would improve it.

c

The Intergovernmental Commission’s procedures for considering such proposals will be the same as for considering an application for a safety authorisation.

d

The period of validity of the safety authorisation shall not be affected by the approval of any such proposals unless the decision of the Intergovernmental Commission indicates otherwise and the safety authorisation is modified accordingly.

Annotations:
Commencement Information
I44

Sch. para. 34 comes into force in accordance with art. 1(1)

I4535

The Intergovernmental Commission may require that the safety authorisation be revised following substantial changes to the safety regulatory framework.

Annotations:
Commencement Information
I45

Sch. para. 35 comes into force in accordance with art. 1(1)

I4636

If the Intergovernmental Commission finds that the Concessionaires no longer satisfy the conditions for a safety authorisation it may, without prejudice to any emergency actions needed, after formal notice and giving the Concessionaires an opportunity to make representations and after considering any representations made, modify, restrict, suspend or revoke the authorisation, giving reasons for its decision. The Concessionaires shall take the appropriate measures to inform railway undertakings operating through the Common Section of any consequent impact upon their operations.

Annotations:
Commencement Information
I46

Sch. para. 36 comes into force in accordance with art. 1(1)

I4737

The Intergovernmental Commission shall inform the Agency, within one month, of the issue, renewal, amendment or revocation of the safety authorisation. The notification shall state the name and address of the Concessionaires, the date of issue, the scope and the validity of the safety authorisation, and, in the case of revocation, the reasons for its decision.

Annotations:
Commencement Information
I47

Sch. para. 37 comes into force in accordance with art. 1(1)

I4838

A safety authorisation issued by the Intergovernmental Commission to the Concessionaires, including a deemed safety authorisation under Article 73(a), may also, if the Intergovernmental Commission thinks fit and so indicates in writing, constitute certification confirming acceptance by the Intergovernmental Commission of the Concessionaires' safety management system in accordance with Article 10(2) (a) of Directive 2004/49/EC where this is required for the purposes of any operation by the Concessionaires of their rolling stock outside the fixed link.

Annotations:
Commencement Information
I48

Sch. para. 38 comes into force in accordance with art. 1(1)

Part B certification for railway undertakings

I4939

In order to use the Common Section, a railway undertaking must hold a safety certificate comprising:

i

a Part A certificate; and

ii

a Part B certificate issued by the Intergovernmental Commission.

Annotations:
Commencement Information
I49

Sch. para. 39 comes into force in accordance with art. 1(1)

I5040

A part B certificate may only be granted for rail transport activities which are equivalent to those specified in the part A certificate held by the railway undertaking.

Annotations:
Commencement Information
I50

Sch. para. 40 comes into force in accordance with art. 1(1)

I5141

The duration of validity of the Part B certificate shall not exceed five years and will be clearly indicated on it. It shall in any case cease to be valid if the part A certificate ceases to be valid.

Annotations:
Commencement Information
I51

Sch. para. 41 comes into force in accordance with art. 1(1)

I5242

In order to obtain a Part B certificate, a railway undertaking must provide:

i

proof that it holds a valid Part A certificate confirming acceptance of its SMS,

ii

evidence of the measures taken to ensure compliance with the specific requirements necessary for safe use of the Common Section. This shall include documentation on:

a

the TSIs or, if appropriate, parts only of the TSIs and, where relevant, unified safety rules and other rules applicable to the operations of the railway undertaking, its staff and its rolling stock and how compliance with them is ensured by the safety management system;

b

the different categories of staff employed or contracted for the railway undertaking’s operation, including evidence that they meet the requirements of TSIs and the unified safety rules and any other rules applicable to the operations, and that those staff have been duly certified;

c

the different types of rolling stock used for the railway undertaking’s operations, including evidence that they meet requirements of TSIs and the unified safety rules and have been duly certified; and

d

the training and certification of train drivers and staff performing vital safety tasks relating to their knowledge of the TSIs, unified safety rules and the emergency procedures for the Channel Tunnel.

Annotations:
Commencement Information
I52

Sch. para. 42 comes into force in accordance with art. 1(1)

I5343

To avoid duplication of work and reduce the amount of information only summary documentation should be submitted concerning elements that comply with TSIs and other requirements of Directives 96/48/EC and 2001/16/EC.

Annotations:
Commencement Information
I53

Sch. para. 43 comes into force in accordance with art. 1(1)

I5444

Unless otherwise agreed with the Intergovernmental Commission, all applications for a Part B certificate, and supporting documents, shall be submitted in English and French.

Annotations:
Commencement Information
I54

Sch. para. 44 comes into force in accordance with art. 1(1)

I5545

The Part B certificate confirms acceptance by the Intergovernmental Commission of the measures taken by the railway undertaking to comply with the specific requirements necessary for safe use of the Common Section.

Annotations:
Commencement Information
I55

Sch. para. 45 comes into force in accordance with art. 1(1)

I5646

Railway undertakings shall, on request, produce to the Concessionaires their Part B certificate.

Annotations:
Commencement Information
I56

Sch. para. 46 comes into force in accordance with art. 1(1)

I5747

The Intergovernmental Commission shall take a decision on applications for a Part B certificate without delay and in any event not more than four months after all information required, and any supplementary information requested by the Intergovernmental Commission, has been submitted. If the applicant is requested to submit supplementary information, this must be provided promptly.

Annotations:
Commencement Information
I57

Sch. para. 47 comes into force in accordance with art. 1(1)

I5848

The Intergovernmental Commission shall seek the Concessionaires' opinion on any request from a railway undertaking for a Part B certificate, at the time it starts its consideration of the application.

Annotations:
Commencement Information
I58

Sch. para. 48 comes into force in accordance with art. 1(1)

I5949

The Intergovernmental Commission shall provide guidance on the procedures for applying for, issuing, updating, amending, revising, renewing and revoking a Part B certificate.

Annotations:
Commencement Information
I59

Sch. para. 49 comes into force in accordance with art. 1(1)

I6050

In order to renew a Part B certificate a railway undertaking must apply for the renewal at least four months before the current certificate’s expiry.

Annotations:
Commencement Information
I60

Sch. para. 50 comes into force in accordance with art. 1(1)

I6151

The holder of a Part B certificate shall without delay inform the Intergovernmental Commission of all major changes to the conditions of its Part A certificate, and whenever new categories of staff or new types of rolling stock are proposed for introduction.

Annotations:
Commencement Information
I61

Sch. para. 51 comes into force in accordance with art. 1(1)

I6252

a

The holder of a Part B certificate shall inform the Intergovernmental Commission without delay and propose appropriate modifications to its Part B certificate whenever it proposes to alter substantially the type or extent of its operations or where any proposed changes referred to in Article 51 would necessitate modifications to the certificate.

b

In proposing any introduction of a new element into the railway system or the modification of an existing element of that system the holder of a Part B certificate shall ensure that such new elements or modifications would not reduce the overall level of safety and, where reasonably practicable, would improve it.

c

The Intergovernmental Commission’s procedures for considering such proposals will be the same as for considering an application for a Part B certificate. The period of validity of the Part B certificate shall not be affected by the approval of any such proposals unless the decision of the Intergovernmental Commission indicates otherwise and the Part B certificate is modified accordingly.

Annotations:
Commencement Information
I62

Sch. para. 52 comes into force in accordance with art. 1(1)

I6353

The Intergovernmental Commission may require that the relevant sections of the Part B certificate be revised following substantial changes in the safety regulatory framework.

Annotations:
Commencement Information
I63

Sch. para. 53 comes into force in accordance with art. 1(1)

I6454

If the Intergovernmental Commission finds that the holder of a Part B certificate no longer satisfies the conditions for that certificate, it may, without prejudice to any emergency actions needed, after formal notice and giving the certificate holder an opportunity to make representations and after considering any representations made, modify, restrict, suspend or revoke the Part B certificate, giving reasons for its decision. The Intergovernmental Commission shall without delay advise the safety authority that granted the Part A certificate and the Concessionaires.

Annotations:
Commencement Information
I64

Sch. para. 54 comes into force in accordance with art. 1(1)

I6555

The Intergovernmental Commission shall revoke the Part B certificate if it is not used as intended within the year following its issue.

Annotations:
Commencement Information
I65

Sch. para. 55 comes into force in accordance with art. 1(1)

Chapter 4Specific provisions for training of train drivers and staff performing vital safety tasks

Access to training facilities

I6656

Fair and non-discriminatory access to training necessary to obtain a Part B certificate in accordance with the requirements in Article 42.ii.d shall be provided by the Concessionaires, by railway undertakings or by appropriate training services, to train drivers and staff performing vital safety tasks of any railway undertaking.

Annotations:
Commencement Information
I66

Sch. para. 56 comes into force in accordance with art. 1(1)

I6757

a

Training must cover knowledge of the relevant aspects of the railway system, in particular knowledge of the route; operating rules and procedures; the signalling and control command system; and emergency procedures.

b

If training services do not include examinations and the granting of certificates to assess personnel and certify that they meet the relevant requirements of the Part B certificate, the Intergovernmental Commission shall ensure that railway undertakings have access to such certification if it is a requirement of the Part B certificate.

Annotations:
Commencement Information
I67

Sch. para. 57 comes into force in accordance with art. 1(1)

I6858

The provision of training services and, where appropriate, the issue of certification required for a Part B certificate must meet the safety requirements laid down in TSIs or in the unified safety rules.

Annotations:
Commencement Information
I68

Sch. para. 58 comes into force in accordance with art. 1(1)

I6959

If the training services are only offered by a single railway undertaking or the Concessionaires, they shall be made available to other infrastructure managers and railway undertakings at a reasonable and non-discriminatory price, which is cost-related and may include a profit margin.

Annotations:
Commencement Information
I69

Sch. para. 59 comes into force in accordance with art. 1(1)

I7060

Persons currently or previously employed as train drivers and staff performing vital safety tasks may, by simple request to the relevant bodies, have access to the documents proving their training, qualifications and experience, and be given copies of them and be free to pass them on.

Annotations:
Commencement Information
I70

Sch. para. 60 comes into force in accordance with art. 1(1)

Chapter 5Provisions relating to rolling stock

Authorisation of railway undertakings' in-use rolling stock

I7161

Rolling stock which has been authorised for placing in service in a Member State but which is not fully covered by the relevant TSIs may not be operated on the Fixed Link unless it has received authorisation from the Intergovernmental Commission.

Annotations:
Commencement Information
I71

Sch. para. 61 comes into force in accordance with art. 1(1)

I7262

The applicant for this authorisation shall submit a technical file to the Intergovernmental Commission concerning the rolling stock or type of rolling stock, indicating the use intended on the Common Section. The dossier shall provide the necessary justification and contain the following information:

i

evidence that the rolling stock has been authorised to be placed in service in another Member State of the European Union and copies of records which show the history of its operation, maintenance and, if applicable, technical modification;

ii

technical data, maintenance programmes and operational characteristics requested by the Intergovernmental Commission and needed for this authorisation;

iii

evidence on technical and operational characteristics that show that the rolling stock is in compliance with the railway system and with the unified safety rules;

iv

information on any exemptions from the unified safety rules that are needed to grant this authorisation, and evidence, based on risk assessment, showing that the acceptance of the rolling stock does not introduce undue risks to the Fixed Link.

Annotations:
Commencement Information
I72

Sch. para. 62 comes into force in accordance with art. 1(1)

I7363

The Intergovernmental Commission shall seek the advice of the Concessionaires on the application and may require trials of rolling stock on the Fixed Link to verify compliance with the requirements specific to the railway system. The Intergovernmental Commission shall set out the scope and content of these trials. Charges may be levied for capacity used for the purpose of these trials. Such charges shall not exceed the net cost, to the Concessionaires, of the trials and shall be payable by the applicant.

Annotations:
Commencement Information
I73

Sch. para. 63 comes into force in accordance with art. 1(1)

I7464

The Intergovernmental Commission shall inform the railway undertaking of its decision on the application as soon as possible and no later than four months after submission of the complete technical dossier, including documents relating to any tests. The certificate of authorisation may contain conditions for use and other restrictions.

Annotations:
Commencement Information
I74

Sch. para. 64 comes into force in accordance with art. 1(1)

I7565

The Intergovernmental Commission shall inform the Concessionaires of its decision on the request of the railway undertaking without delay and shall provide a copy of any authorisation given.

Annotations:
Commencement Information
I75

Sch. para. 65 comes into force in accordance with art. 1(1)

I7666

Any approval or authorisation of rolling stock for use on the Fixed Link, (including revisions to it), issued by the Intergovernmental Commission and which is current immediately before the date this Regulation comes into force, shall be deemed to be an authorisation within the meaning of Article 61 above.

Annotations:
Commencement Information
I76

Sch. para. 66 comes into force in accordance with art. 1(1)

Chapter 6Investigations into accidents and incidents

I7767

Investigations into serious accidents and those incidents and accidents which, under slightly different conditions, might have led to serious accidents, including technical failures of the structural subsystems or of interoperability constituents, occurring within the Fixed Link, will be undertaken by the investigating bodies, which are functionally independent of the Intergovernmental Commission.

Annotations:
Commencement Information
I77

Sch. para. 67 comes into force in accordance with art. 1(1)

I7868

In deciding whether to carry out an investigation and in the exercise of their functions, the investigating bodies will act in accordance with their national laws and any reciprocal co-operation arrangements agreed between them. They shall include in their consideration relevant aspects of the safety regime for the Fixed Link established by the two Governments and the Intergovernmental Commission.

Annotations:
Commencement Information
I78

Sch. para. 68 comes into force in accordance with art. 1(1)

I7969

The Intergovernmental Commission, the Concessionaires and the railway undertakings may request the investigating bodies to undertake an investigation. The respective investigating bodies will, in considering any such requests, act in accordance with their respective national laws and any reciprocal co-operation arrangements made between them.

Annotations:
Commencement Information
I79

Sch. para. 69 comes into force in accordance with art. 1(1)

I8070

The Concessionaires, the railway undertakings and if necessary the Intergovernmental Commission shall advise one or other of the investigating bodies immediately of any accidents and incidents as referred to in Article 8 above, without prejudice to the arrangements for reciprocal notification contained in the co-operation arrangements.

Annotations:
Commencement Information
I80

Sch. para. 70 comes into force in accordance with art. 1(1)

I8171

The Intergovernmental Commission shall take the measures necessary to ensure that recommendations by the investigating bodies concerning the Fixed Link are duly taken into consideration by the Concessionaires and the railway undertakings and, where appropriate, acted upon.

Annotations:
Commencement Information
I81

Sch. para. 71 comes into force in accordance with art. 1(1)

I8272

The Intergovernmental Commission shall report back at least annually to the relevant investigating body on measures that are taken or planned as a consequence of recommendations.

Annotations:
Commencement Information
I82

Sch. para. 72 comes into force in accordance with art. 1(1)

Chapter 7Transitional and miscellaneous provisions

Transitional provisions on safety authorisation and Part B certificates

I8373

a

Any notification of acceptance (including revisions to it) which is current immediately before the date this Regulation comes into force, issued by the Intergovernmental Commission to the Concessionaire in relation to a safety case (or revisions to it) submitted by the Concessionaire to the Intergovernmental Commission concerning the Fixed Link, shall be deemed to be a safety authorisation within the meaning of Article 28 above.

b

The deemed safety authorisation referred to in Article 73(a) shall remain valid for one year after the date this Regulation comes into force or until replaced by a new safety authorisation issued pursuant to this Regulation, whichever is the first to occur.

Annotations:
Commencement Information
I83

Sch. para. 73 comes into force in accordance with art. 1(1)

I8474

a

Any notification of acceptance (including revisions to it) which is current immediately before the date this Regulation comes into force, issued by the Intergovernmental Commission in respect of a railway undertaking in relation to a safety case (or revisions to it) submitted to the Intergovernmental Commission concerning the Common Section, shall be deemed to be a Part B certificate within the meaning of Article 39(ii) above.

b

The deemed Part B certificate referred to in Article 74(a) shall remain valid for two years after the date this Regulation comes into force or until replaced by a new Part B certificate issued pursuant to this Regulation, whichever is the first to occur.

Annotations:
Commencement Information
I84

Sch. para. 74 comes into force in accordance with art. 1(1)

Miscellaneous provisions

I8575

The Regulation of the Intergovernmental Commission concerning the use of the Channel Tunnel by international groupings or railway undertakings signed on 25th October 2005 shall be amended as follows:—

i

Article 6(c) shall be replaced by the following provision:

c

has received and continues to hold a safety certificate as required by Article 39 of the Regulation of the Intergovernmental Commission transposing Directive 2004/49/EC of the European Parliament and of the Council (the Railway Safety Directive) signed on 24th January 2007;

ii

Article 12(1) (f) shall be replaced by the following provision:

f

arrangements for access to the network.

Annotations:
Commencement Information
I85

Sch. para. 75 comes into force in accordance with art. 1(1)

I8676

The decisions of the Intergovernmental Commission taken by virtue of bi-national regulations made pursuant to Article 10(3) (e) of the Treaty may be subject to judicial review by the authorities of either France or the United Kingdom under the conditions laid down by national law applicable to those authorities. The lodging of an application for judicial review before the authorities of one State precludes the lodging of an application for judicial review of the same matter before the authorities of the other State.

Annotations:
Commencement Information
I86

Sch. para. 76 comes into force in accordance with art. 1(1)

I8777

This Regulation shall enter into force on the date of the later of the notifications by the two Governments of the completion of their necessary internal procedures.

Done by the Intergovernmental Commission on 24th January 2007 in the English and French languages, both texts being equally authoritative.

Roy Griffins.

Marc Abadie.

Head of UK Delegation,

Head of French Delegation,

Intergovernmental Commission

Intergovernmental Commission

Annotations:
Commencement Information
I87

Sch. para. 77 comes into force in accordance with art. 1(1)

Annex 1SAFETY MANAGEMENT SYSTEMS

Requirements on the safety management systemI881

The safety management system must be documented in all relevant parts and shall in particular describe the distribution of responsibilities within the organisation of the infrastructure manager or the railway undertaking. It shall show how control by the management on different levels is secured, how staff and their representatives on all levels are involved and how continuous improvement of the safety management system is ensured.

Annotations:
Commencement Information
I88

Sch. Pt. 8 para. 1 comes into force in accordance with art. 1(1)

Basic elements of the safety management systemI892

The basic elements of the safety management system are:

a

a safety policy approved by the organisation’s chief executive and communicated to all staff;

b

qualitative and quantitative targets of the organisation for the maintenance and enhancement of safety, and plans and procedures for reaching these targets;

c

procedures to meet existing, new and altered technical and operational standards or other prescriptive conditions as laid down:

  • in TSIs,

  • or

  • in the unified safety rules referred to in Article 1 xxvi,

  • or

  • in other relevant rules,

  • or

  • in authority decisions;

or where necessary to achieve common safety targets or adherence to common safety methods, when these are adopted; and procedures to assure compliance with the standards and other prescriptive conditions throughout the life-cycle of equipment and operations;

d

procedures and methods for carrying out risk evaluation and implementing risk control measures whenever a change of the operating conditions or new material imposes new risks on the infrastructure or on operations;

e

provision of programmes for training of staff and systems to ensure that the staff’s competence is maintained and tasks carried out accordingly;

f

arrangements for the provision of sufficient information within the organisation and, where appropriate, between organisations operating on the same infrastructure;

g

procedures and formats for how safety information is to be documented and designation of procedure for configuration control of vital safety information;

h

procedures to ensure that accidents, incidents, near misses and other dangerous occurrences are reported, investigated and analysed and that necessary preventive measures are taken;

i

provision of plans for action and alerts and information in case of emergency, agreed upon with the appropriate public authorities; and

j

provisions for recurrent internal auditing of the safety management system.

Annotations:
Commencement Information
I89

Sch. Pt. 8 para. 2 comes into force in accordance with art. 1(1)

Annex 2COMMON SAFETY INDICATORS

If new facts or errors are discovered after the submission of an Annual Safety Report, the indicators for one particular year shall be amended or corrected by the infrastructure manager, railway undertaking or the Intergovernmental Commission as the case may be, at the first convenient opportunity and at the latest in the next annual report.

For indicators relating to accidents under heading 1 below, Regulation (EC) No. 91/2003 of the European Parliament and of the Council of 16th December 200231 on rail transport statistics shall be applied as far as the information is available.

Indicators relating to accidentsI901

1

Total and relative (to train kilometres) number of accidents and a break-down on the following types of accidents:

a

collisions of trains, including collisions with obstacles within the clearance gauge;

b

derailments of trains;

c

level-crossing accidents, including accidents involving pedestrians at level-crossings;

d

accidents to persons caused by rolling stock in motion, with the exception of suicides;

e

suicides;

f

fires in rolling stock; and

g

others.

Each accident shall be reported under the type of the primary accident, even if the consequences of the secondary accident are more severe, eg a fire following a derailment.

2

Total and relative (to train kilometres) number of persons seriously injured and killed by type of accident divided into the following categories:

a

passengers (also in relation to total number of passenger-kilometres);

b

employees including the staff of contractors;

c

level-crossing users;

d

unauthorised persons on railway premises; and

e

others.

Annotations:
Commencement Information
I90

Sch. Pt. 9 para. 1 comes into force in accordance with art. 1(1)

Indicators relating to incidents and near-missesI912

1

Total and relative (to train kilometres) number of broken rails, track buckles and wrong-side signalling failures.

2

Total and relative (to train kilometres) number of signals passed at danger.

3

Total and relative (to train kilometres) number of broken wheels and axles on rolling stock in service.

Annotations:
Commencement Information
I91

Sch. Pt. 9 para. 2 comes into force in accordance with art. 1(1)

Indicators relating to consequences of accidentsI923

1

Total and relative (to train kilometres) costs in euro of all accidents where, if possible, the following costs should be calculated and included:

a

deaths and injuries;

b

compensation for loss of or damage to property of passengers, staff or third parties —including damage caused to the environment;

c

replacement or repair of damaged rolling stock and railway installations; and

d

delays, disturbances and re-routing of traffic, including extra costs for staff and loss of future revenue.

  • From the above costs shall be deducted indemnity or compensation recovered or estimated to be recovered from third parties such as motor vehicle owners involved in level crossing accidents. Compensation recovered by insurance policies held by railway undertakings or infrastructure managers shall not be deducted.

2

Total and relative (to number of hours worked) number of working hours of staff and contractors lost as a consequence of accidents.

Annotations:
Commencement Information
I92

Sch. Pt. 9 para. 3 comes into force in accordance with art. 1(1)

Indicators relating to technical safety of infrastructure and its implementationI934

1

Percentage of tracks with Automatic Train Protection (ATP) in operation, percentage of train kilometres using operational ATP systems.

2

Number of level crossings (total and per line kilometre). Percentage of level crossings with automatic or manual protection.

Annotations:
Commencement Information
I93

Sch. Pt. 9 para. 4 comes into force in accordance with art. 1(1)

Indicators relating to the management of safetyI945

Internal audits accomplished by infrastructure managers and railway undertakings as set out in the documentation of the safety management system. Total number of accomplished audits and the number as a percentage of audits required (and/or planned).

Annotations:
Commencement Information
I94

Sch. Pt. 9 para. 5 comes into force in accordance with art. 1(1)

Additional indicators.I956

The above listed indicators in this Annex are derived from Annex 1 of the Railway Safety Directive 2004/49/EC. Additional indicators may be required by the Intergovernmental Commission specifically for the risks in the tunnel.

Annotations:
Commencement Information
I95

Sch. Pt. 9 para. 6 comes into force in accordance with art. 1(1)

(This note is not part of the Order)

This Order brings into effect, for the Channel Tunnel, Directive 2004/49/EC of the European Parliament and of the Council of 29th April 2004 (O.J. No. L 220, 21.6.04 p. 16), (“the Railway Safety Directive”). It does so by giving the force of law to a Regulation transposing that Directive (“the Regulation”) made on 24th January 2007 by the Channel Tunnel Intergovernmental Commission, (under Article 10(3) (e) of the Treaty of Canterbury, Cm 1827), on behalf of the Governments of the United Kingdom of Great Britain and Northern Ireland and the French Republic. The text of the Regulation is set out in the Schedule to the Order.

Article 1 provides that the Order comes into force on the date of the later of the notifications by the two Governments of the completion of their necessary internal procedures to give the Regulation the force of law in the respective countries. That date will be notified in the London, Edinburgh and Belfast Gazettes. It provides that the Order does not extend to Northern Ireland except for limited purposes.

Article 3 provides that the Regulation has the force of law.

Article 4 makes the Office of Rail Regulation responsible for the enforcement of the Regulation, (except for those matters identified in paragraphs (5) and (6)). It applies for this purpose various enforcement provisions of the Health and Safety at Work etc Act 1974, such as the powers to appoint inspectors and for inspectors to serve improvement and prohibition notices and institute proceedings for their breach or other offences. It identifies those articles of the Regulation which, if contravened, would give rise to an offence under section 33(1) (c) of that Act (ie where a contravention of the Regulation would give rise to an offence without an inspector having first to serve an improvement notice or a prohibition notice and show that the terms of the notice had been contravened).

Article 5 provides various rights of appeal to the Office of Rail Regulation for the benefit of railway undertakings, or persons currently or previously employed as train drivers or staff performing vital safety tasks, should they be denied any entitlement conferred upon them by articles 56 to 60 of the Regulation, (rights to fair and non discriminatory access to training facilities and rights to receive copies of documents verifying training, qualifications and experience).

Article 6 makes various provisions concerning civil liability. In particular it provides that a breach of a duty requirement or prohibition imposed by certain articles of the Regulation is, in so far as it causes damage, actionable.

Article 7 provides that the Order does not affect the operation of Part 1 of the Railways and Transport Safety Act 2003, or the Railways (Accident Investigation and Reporting) Regulations 2005, as these measures already implement the accident and incident investigation requirements of the Railway Safety Directive and also apply to the Channel Tunnel.

Article 8 empowers the Intergovernmental Commission to impose charges reflecting their administrative costs for processing applications for certain certificates and authorisations under the Regulation.

Article 9 makes amendments to the Channel Tunnel (International Arrangements) Order 2005 which are consequential upon article 75 of the Regulation and the Railway Safety Directive.

Article 10 re-enacts paragraph 1(b) (i) of Schedule 2 (application for a safety certificate) to the Railways and Other Guided Transport Systems (Safety) Regulations 2006 with the addition of the Intergovernmental Commission to the list of safety authorities whose certificates may be recognised by the Office of Rail Regulation for the purpose of their consideration of applications for “safety certificates” under regulation 7 of those Regulations. This gives effect to article 38 of the Regulation.

The key provisions of the Regulation itself are briefly as follows—

1

The Intergovernmental Commission is made the safety authority for the Channel Tunnel (chapter 2).

2

The Concessionaires, who are the infrastructure managers of the Channel Tunnel, are to draw up and put into effect a safety management system which shows their ability to assume responsibility for safety. They may only manage and operate the Channel Tunnel if they possess a safety authorisation from the Intergovernmental Commission (chapter 3).

3

A railway undertaking may not operate through the Channel Tunnel unless it has a safety certificate. Part A of the certificate provides confirmation of the acceptance of its safety management system by the Member State in which it first established its operations. Part B confirms acceptance by the Intergovernmental Commission of the measures taken by the railway undertaking to comply with the specific requirements necessary for safe use of the Channel Tunnel (chapter 3).

4

Provision is made for staff to have access to necessary training (chapter 4).

5

Provision is made for requiring rolling stock to be authorised by the Intergovernmental Commission before it may be operated through the Channel Tunnel where, although it is authorised to be placed in service in a Member State, it is not fully covered by relevant technical specifications for interoperability (chapter 5).

6

Provision is made relating to the investigation of accidents and incidents in the Channel Tunnel (chapter 6).

7

Transitional and miscellaneous provisions are made (chapter 7).

An impact assessment of the effect that this Order will have on the costs of business can be obtained from the Department for Transport, Great Minister House, 76 Marsham Street, London SW1P 4DR. A transposition note in relation to the implementation of the Railway Safety Directive by this Order can also be obtained from this address. They are also annexed to the Explanatory Memorandum published with this Order on the Office of Public Sector Information website www.opsi.gov.uk