Search Legislation

The River Humber (Upper Burcom Tidal Stream Generator) Order 2008

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)
 Help about opening options

Opening OptionsExpand opening options

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

Power to deviate

4.  In constructing or maintaining any scheduled works, the undertaker may deviate—

(a)laterally from the lines or situations shown on the works plans to any extent within the limits of deviation; and

(b)vertically from the levels shown on the sections to any extent not exceeding 2 metres upwards and to any extent downwards.

Back to top

Options/Help