InterpretationE+W

2.—(1) In this Order—

“the 1961 Act” means the Land Compensation Act 1961(1);

“the 1965 Act” means the Compulsory Purchase Act 1965(2);

“the 1980 Act” means the Highways Act 1980(3);

“the 1984 Act” means the Road Traffic Regulation Act 1984(4);

“the 1990 Act” means the Town and Country Planning Act 1990(5);

“the 1991 Act” means the New Roads and Street Works Act 1991(6);

“the 1994 Act” means the Greater Nottingham Light Rapid Transit Act 1994(7);

“address” includes any number or address used for the purposes of electronic transmission;

“the authorised street tramway” means any street tramway authorised by this Order;

“the authorised tramroad” means any tramroad authorised by this Order;

“the authorised tramway” means the tramway (consisting of the authorised street tramway and the authorised tramroad) authorised by this Order, or any part of that tramway;

“the authorised works” means the scheduled works and any other works authorised by this Order, or any part of them;

“the book of reference” means the book of reference certified by the Secretary of State as the book of reference for the purposes of this Order;

“building” includes any structure or erection, or any part of a building, structure or erection;

“the canal” means the Nottingham Beeston Canal;

“carriageway” has the same meaning as in the 1980 Act;

“the City” means the City of Nottingham;

“the City Council” means Nottingham City Council;

“the County Council” means The Nottinghamshire County Council;

“cycle track” has the same meaning as in the 1980 Act;

“electric line” has the meaning given by section 64(1) of the Electricity Act 1989(8);

“electronic transmission” means a communication transmitted—

(a)

by means of an electronic communications network; or

(b)

by other means but while in electronic form;

“footway” has the same meaning as in the 1980 Act;

“highway” and “highway authority” have the same meaning as in the 1980 Act;

“the limits of deviation” means the limits of lateral deviation for the scheduled works mentioned in article 6(1)(a) and (2) (power to deviate);

“Line One” means the light rail transit system authorised by the 1994 Act, comprising railways and tramways and all works and conveniences provided in connection with those railways and tramways, as that system is constructed, extended or altered from time to time;

“maintain” includes inspect, repair, adjust, alter, remove, reconstruct and replace and “maintenance” shall be construed accordingly;

“the Nottingham Inclosure Act” means the Act of Parliament whose long title is “An Act for inclosing Lands in the Parish of Saint Mary in the Town and County of the Town of Nottingham”(9);

“the open space and exchange land plans” means the plans that are each headed “open space and exchange land plan”, which are attached to the works and land plans and which are certified by the Secretary of State as the open space and exchange land plans for the purposes of this Order;

“the Order limits” means the permanent limits and the temporary limits;

“owner”, in relation to land, has the same meaning as in the Acquisition of Land Act 1981(10);

“parking place” has the same meaning as in section 32 of the 1984 Act;

“the permanent limits” means the limits of deviation and of land to be acquired or used and the limits of additional land to be acquired or used, as shown on the works and land plans, described in the book of reference and (in the case of the additional land) specified in columns (1) and (2) of Schedule 2 (additional land which may be acquired or used);

“the promoter” means the County Council and the City Council, or either of them;

“the relevant part of the canal” means so much of the canal as is within the Order limits relating to Work No.7, or any part of it;

“the relevant part of the river” means so much of the River Trent as is within the Order limits relating to Work No.12, or any part of it;

“the scheduled works” means the works specified in Schedule 1 (scheduled works), or any part of them;

“the sections” means the sections included in the works and land plans;

“street” includes part of a street;

“street authority”, in relation to a street, has the same meaning as in Part 3 of the 1991 Act;

“street tramway” means any part of a tramway which is laid along a street, whether or not the section of the street in which its rails are laid may be used by other traffic;

“the temporary limits” means the limits of land to be used temporarily as shown on the works and land plans, described in the book of reference and specified in columns (1) and (2) of Schedule 9 (land of which temporary possession may be taken);

“the traffic regulation and rights of way plans” means the plans certified by the Secretary of State as the traffic regulation and rights of way plans for the purposes of this Order;

“tramcar” means any vehicle (whether or not used for the carriage of passengers) carried on flanged wheels along the rails of a tramway;

“tramroad” means any part of a tramway which is not a street tramway;

“tram services” means passenger services utilising the authorised tramway;

“tramway” means a system of transport used wholly or mainly for the carriage of passengers and employing parallel rails which—

(a)

provide support and guidance for vehicles carried on flanged wheels; and

(b)

are laid wholly or mainly along a street or in any other place to which the public has access (including a place to which the public has access only on making a payment);

“tramway premises” means any premises of the promoter used for or in connection with the operation or maintenance of the authorised tramway, including any depot, test track, building, park & ride site and any tramcar;

“the tribunal” means the Lands Tribunal;

“watercourse” includes all docks, rivers, streams, ditches, drains, canals, cuts, culverts, dykes, sluices, sewers and passages through which water flows (whether or not the flow is intermittent) except a public sewer or drain; and

“the works and land plans” means the plans and sections certified by the Secretary of State as the works and land plans for the purposes of this Order.

(2) References in this Order to rights over land include references to rights to do, or to place and maintain, anything in or on land or in the air space over its surface.

(3) Any reference in this Order to a work identified by the number of the work shall be construed as a reference to the work of that number authorised by this Order.

(4) References in this Order to points identified by letters, with or without numbers, or by numbers, shall be construed as references to the points so marked on the works and land plans or, in the case of Schedule 10 (traffic regulation), to the points so marked on the traffic regulation and rights of way plans.

(5) All distances, directions, lengths and points stated in the description of the scheduled works or in any description of powers or lands shall be construed as if the words “or thereabouts” were inserted after each such distance, direction, length and point, and distances between points on a scheduled work shall be taken to be measured along the scheduled work.

Commencement Information

I1Art. 2 in force at 9.6.2009, see art. 1

(6)

1991 c. 22. As amended by the Traffic Management Act 2004 c. 18.

(9)

8 & 9 Vict. c. 7.

Back to top

Options/Help

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?