Search Legislation

The Nottingham Express Transit System Order 2009

 Help about what version

What Version

 Help about advanced features

Advanced Features

 Help about opening options

Opening OptionsExpand opening options

Changes over time for: Section 7

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The Nottingham Express Transit System Order 2009, Section 7. Help about Changes to Legislation

Designation of worksE+W

7.—(1) Regardless of anything in the description of the scheduled works contained in Schedule 1 (scheduled works)—

(a)the whole or any part of the authorised street tramway may be constructed within the limits of deviation for that work off-street as a tramroad, and so far as it is so constructed shall be treated for the purposes of this Order as if it were so designated; and

(b)the whole or any part of the authorised tramroad may be constructed within the limits of deviation for that work along a street as a street tramway, and so far as it is constructed shall be treated for the purposes of this Order as if it were so designated.

(2) Where, by means of the creation or extinguishment of rights of way, any part of the authorised tramway which has been constructed as a tramroad becomes a street tramway, or any part which was constructed as a street tramway becomes a tramroad, it shall be treated for the purposes of this Order as if it were so designated.

Commencement Information

I1Art. 7 in force at 9.6.2009, see art. 1

Back to top

Options/Help

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?