http://www.legislation.gov.uk/uksi/2009/1300/part/2/crossheading/principal-powers/madeThe Nottingham Express Transit System Order 2009Compulsory purchaseRoad and pathway maintenanceLegislationRoad worksRoad signsKing's Printer of Acts of Parliament2018-04-13TRANSPORT AND WORKS, ENGLANDTRANSPORT, ENGLANDThis Order authorises Nottingham City Council and The Nottinghamshire County Council (referred to in this Order as the promoter) to construct and operate two extensions to the existing tram system (known as NET Line One) running between Nottingham City Centre and Hucknall, one running from the City Centre to Clifton via Wilford and the other running from the City Centre to Chilwell via the Queen’s Medical Centre and Beeston and, for that purpose, compulsorily or by agreement, to acquire land and rights in land and to use land. It contains a number of protective provisions for the benefit of affected undertakings.PART 2WORKS PROVISIONSPrincipal powers
Power to construct and maintain works5.(1)

The promoter may construct and maintain the scheduled works.

(2)

Subject to article 6 (power to deviate), the scheduled works may only be constructed in the lines or situations shown on the works and land plans and in accordance with the levels shown on the sections.

(3)

Subject to paragraph (7), the promoter may carry out and maintain such of the following works as may be necessary or expedient for the purposes of, or for purposes ancillary to, the construction of the scheduled works, namely—

(a)

stations, depots, platforms, junctions and stopping places;

(b)

works required for, or in connection with, the control of any vehicular and pedestrian traffic on the authorised tramway;

(c)

works required for the strengthening, improvement, maintenance or reconstruction of any street;

(d)

works for the strengthening, alteration or demolition of any building;

(e)

works to alter the position of any street furniture or apparatus, including mains, sewers, drains, pipes, cables and lights;

(f)

works to alter the course of, or otherwise interfere with, watercourses;

(g)

landscaping, ecological and other works to mitigate any adverse effects of the construction, maintenance or operation of the other authorised works; and

(h)

facilities and works for the benefit or protection of land or premises affected by the other authorised works.

(4)

Subject to paragraph (7), the promoter may carry out and maintain such other works (of whatever nature) as may be necessary or expedient for the purposes of, or for purposes ancillary to, the construction of the scheduled works.

(5)

The promoter may remove any works constructed by it pursuant to this Order which have been constructed as temporary works or which it no longer requires.

(6)

Where the promoter lays down conduits for the accommodation of cables or other apparatus for the purposes of or associated with the authorised works it may provide in, or in connection with, such conduits, accommodation for the apparatus of any other person, and manholes and other facilities for access to such accommodation, and may permit the use of such conduits and facilities on such terms and conditions as may be agreed between it and such other person.

(7)

Paragraphs (3) and (4) shall only authorise the carrying out or maintenance of works—

(a)

within the Order limits; or

(b)

within the boundaries of any street along which the construction of a street tramway is shown on the works and land plans, or which has a junction with such a street.

(8)

The powers of this article shall not be exercised within the boundaries of a street outside of the Order limits which has a junction with a street along which the construction of a street tramway is shown on the works and land plans without the consent of the street authority but such consent shall not be unreasonably withheld.

(9)

Section 109 of the Water Resources Act 1991

1991 c. 57.

, section 23 of the Land Drainage Act 1991

1991 c. 59.

and any byelaws made under those Acts shall not apply to anything done under or in pursuance of this Order.

(10)

Section 6 of the Ecclesiastical Jurisdiction Measure 1963

1963 No.1.

, section 7 of the Faculty Jurisdiction Measure 1964

1964 No.5.

and Part 3 of the Care of Churches and Ecclesiastical Jurisdiction Measure 1991

1991 No.1.

shall not apply to anything done under or in pursuance of this Order in relation to Work No.16A and the land numbered 1169 on the works and land plans.

(11)

The scheduled works may be constructed and maintained under the powers of this article regardless of anything contained in or done pursuant to section 53 of the Nottingham Inclosure Act or Part 1 of, or Schedule 2 to, the Commons Act 2006

2006 c. 26.

.

Power to deviate6.(1)

In constructing or maintaining any of the scheduled works, the promoter may—

(a)

deviate laterally from the lines or situations shown on the works and land plans within the Order limits relating to that work shown on those plans; and

(b)

deviate vertically from the levels shown on the sections—

(i)

to any extent not exceeding 3 metres upwards; and

(ii)

to any extent downwards as may be necessary or expedient.

(2)

In constructing or maintaining any work or part of a work shown on the works and land plans as being situated in a street and for which no limits of deviation are shown on those plans, the promoter may deviate laterally within the boundaries of that street.

(3)

The promoter may, in constructing or maintaining the authorised tramway, lay down—

(a)

double lines of rails in place of single lines;

(b)

single lines of rails in place of double lines;

(c)

interlacing lines of rails in place of double or single lines; or

(d)

double or single lines of rails in place of interlacing lines.

(4)

The power in paragraph (3) shall not be exercised in the case of the authorised street tramway without the consent of the street authority, but such consent shall not be unreasonably withheld.

(5)

The promoter may in constructing or maintaining the authorised street tramway lay down such number of switches and crossings as may be necessary or expedient.

(6)

The promoter may in constructing and maintaining the authorised tramroad provide within the limits of deviation for the tramroad such number of lines of rails and sidings, switchings and crossings as may be necessary or expedient.

(7)

Without limiting the scope of paragraph (1)—

(a)

in constructing and maintaining Works Nos. 3, 5, 6, 6A, 10, 10A, 10B, 12, 15 and 15A the promoter may, to the extent it thinks fit, deviate from the design of the bridges shown on the sections, including by varying the number of any supporting columns or other structures, the distances between them and the height or clearance above the level of any land underneath the bridges; and

(b)

in constructing and maintaining the scheduled works the promoter may, to the extent it thinks fit, deviate laterally from their points of commencement and termination shown on the works and land plans.

Designation of works7.(1)

Regardless of anything in the description of the scheduled works contained in Schedule 1 (scheduled works)—

(a)

the whole or any part of the authorised street tramway may be constructed within the limits of deviation for that work off-street as a tramroad, and so far as it is so constructed shall be treated for the purposes of this Order as if it were so designated; and

(b)

the whole or any part of the authorised tramroad may be constructed within the limits of deviation for that work along a street as a street tramway, and so far as it is constructed shall be treated for the purposes of this Order as if it were so designated.

(2)

Where, by means of the creation or extinguishment of rights of way, any part of the authorised tramway which has been constructed as a tramroad becomes a street tramway, or any part which was constructed as a street tramway becomes a tramroad, it shall be treated for the purposes of this Order as if it were so designated.

This XML file does not appear to have any style information associated with it. The document tree is shown below.
<akomaNtoso xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xsi:schemaLocation="http://docs.oasis-open.org/legaldocml/ns/akn/3.0 http://docs.oasis-open.org/legaldocml/akn-core/v1.0/cos01/part2-specs/schemas/akomantoso30.xsd">
<act name="uksi">
<meta>
<identification source="#">
<FRBRWork>
<FRBRthis value="http://www.legislation.gov.uk/id/uksi/2009/1300"/>
<FRBRuri value="http://www.legislation.gov.uk/id/uksi/2009/1300"/>
<FRBRdate date="2009-05-19" name="made"/>
<FRBRauthor href="http://www.legislation.gov.uk/id/government/uk"/>
<FRBRcountry value="GB-UKM"/>
<FRBRsubtype value="order"/>
<FRBRnumber value="1300"/>
<FRBRname value="S.I. 2009/1300"/>
<FRBRprescriptive value="true"/>
</FRBRWork>
<FRBRExpression>
<FRBRthis value="http://www.legislation.gov.uk/uksi/2009/1300/made"/>
<FRBRuri value="http://www.legislation.gov.uk/uksi/2009/1300/made"/>
<FRBRdate date="2009-05-19" name="made"/>
<FRBRauthor href="#"/>
<FRBRlanguage language="eng"/>
</FRBRExpression>
<FRBRManifestation>
<FRBRthis value="http://www.legislation.gov.uk/uksi/2009/1300/made/data.akn"/>
<FRBRuri value="http://www.legislation.gov.uk/uksi/2009/1300/made/data.akn"/>
<FRBRdate date="2024-12-02Z" name="transform"/>
<FRBRauthor href="http://www.legislation.gov.uk"/>
<FRBRformat value="application/akn+xml"/>
</FRBRManifestation>
</identification>
<lifecycle source="#">
<eventRef refersTo="#made" date="2009-05-19" eId="date-made" source="#"/>
<eventRef refersTo="#coming-into-force" date="2009-06-09" eId="date-cif-1" source="#"/>
</lifecycle>
<analysis source="#">
<otherAnalysis source=""/>
</analysis>
<references source="#">
<TLCEvent eId="made" href="" showAs="Made"/>
<TLCEvent eId="cif" href="" showAs="ComingIntoForce"/>
</references>
<proprietary xmlns:ukm="http://www.legislation.gov.uk/namespaces/metadata" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:dct="http://purl.org/dc/terms/" source="#">
<dc:identifier>http://www.legislation.gov.uk/uksi/2009/1300/part/2/crossheading/principal-powers/made</dc:identifier>
<dc:title>The Nottingham Express Transit System Order 2009</dc:title>
<dc:subject>Compulsory purchase</dc:subject>
<dc:subject>Road and pathway maintenance</dc:subject>
<dc:subject>Legislation</dc:subject>
<dc:subject>Road works</dc:subject>
<dc:subject>Road signs</dc:subject>
<dc:publisher>King's Printer of Acts of Parliament</dc:publisher>
<dc:modified>2018-04-13</dc:modified>
<dc:subject scheme="SIheading">TRANSPORT AND WORKS, ENGLAND</dc:subject>
<dc:subject scheme="SIheading">TRANSPORT, ENGLAND</dc:subject>
<dc:description>This Order authorises Nottingham City Council and The Nottinghamshire County Council (referred to in this Order as the promoter) to construct and operate two extensions to the existing tram system (known as NET Line One) running between Nottingham City Centre and Hucknall, one running from the City Centre to Clifton via Wilford and the other running from the City Centre to Chilwell via the Queen’s Medical Centre and Beeston and, for that purpose, compulsorily or by agreement, to acquire land and rights in land and to use land. It contains a number of protective provisions for the benefit of affected undertakings.</dc:description>
<ukm:SecondaryMetadata>
<ukm:DocumentClassification>
<ukm:DocumentCategory Value="secondary"/>
<ukm:DocumentMainType Value="UnitedKingdomStatutoryInstrument"/>
<ukm:DocumentStatus Value="final"/>
<ukm:DocumentMinorType Value="order"/>
</ukm:DocumentClassification>
<ukm:Year Value="2009"/>
<ukm:Number Value="1300"/>
<ukm:DepartmentCode Value="DfT00213L"/>
<ukm:Made Date="2009-05-19"/>
<ukm:ComingIntoForce>
<ukm:DateTime Date="2009-06-09"/>
</ukm:ComingIntoForce>
<ukm:ISBN Value="9780111479810"/>
</ukm:SecondaryMetadata>
<ukm:Alternatives>
<ukm:Alternative Date="2009-05-29" URI="http://www.legislation.gov.uk/uksi/2009/1300/pdfs/uksi_20091300_en.pdf" Title="Print Version"/>
</ukm:Alternatives>
<ukm:Statistics>
<ukm:TotalParagraphs Value="211"/>
<ukm:BodyParagraphs Value="88"/>
<ukm:ScheduleParagraphs Value="123"/>
<ukm:AttachmentParagraphs Value="0"/>
<ukm:TotalImages Value="0"/>
</ukm:Statistics>
</proprietary>
</meta>
<body>
<part eId="part-2">
<num>PART 2</num>
<heading>WORKS PROVISIONS</heading>
<hcontainer name="crossheading" ukl:Name="Pblock" eId="part-2-crossheading-principal-powers" uk:target="true">
<heading>Principal powers</heading>
<article eId="article-5">
<heading>Power to construct and maintain works</heading>
<num>5.</num>
<paragraph eId="article-5-1">
<num>(1)</num>
<content>
<p>The promoter may construct and maintain the scheduled works.</p>
</content>
</paragraph>
<paragraph eId="article-5-2">
<num>(2)</num>
<content>
<p>Subject to article 6 (power to deviate), the scheduled works may only be constructed in the lines or situations shown on the works and land plans and in accordance with the levels shown on the sections.</p>
</content>
</paragraph>
<paragraph eId="article-5-3">
<num>(3)</num>
<intro>
<p>
Subject to paragraph (7),
<abbr title="Nottinghamshire County Council and Nottingham City Council, or either of them">the promoter</abbr>
may carry out and maintain such of the following works as may be necessary or expedient for the purposes of, or for purposes ancillary to, the construction of the scheduled works, namely—
</p>
</intro>
<level class="para1" eId="article-5-3-a">
<num>(a)</num>
<content>
<p>stations, depots, platforms, junctions and stopping places;</p>
</content>
</level>
<level class="para1" eId="article-5-3-b">
<num>(b)</num>
<content>
<p>works required for, or in connection with, the control of any vehicular and pedestrian traffic on the authorised tramway;</p>
</content>
</level>
<level class="para1" eId="article-5-3-c">
<num>(c)</num>
<content>
<p>works required for the strengthening, improvement, maintenance or reconstruction of any street;</p>
</content>
</level>
<level class="para1" eId="article-5-3-d">
<num>(d)</num>
<content>
<p>works for the strengthening, alteration or demolition of any building;</p>
</content>
</level>
<level class="para1" eId="article-5-3-e">
<num>(e)</num>
<content>
<p>works to alter the position of any street furniture or apparatus, including mains, sewers, drains, pipes, cables and lights;</p>
</content>
</level>
<level class="para1" eId="article-5-3-f">
<num>(f)</num>
<content>
<p>
works to alter the course of, or otherwise interfere with,
<abbr title="includes all docks, rivers, streams, ditches, drains, canals, cuts, culverts, dykes, sluices, sewers and passages through which water flows (whether or not the flow is intermittent) except a public sewer or drain">watercourse</abbr>
s;
</p>
</content>
</level>
<level class="para1" eId="article-5-3-g">
<num>(g)</num>
<content>
<p>landscaping, ecological and other works to mitigate any adverse effects of the construction, maintenance or operation of the other authorised works; and</p>
</content>
</level>
<level class="para1" eId="article-5-3-h">
<num>(h)</num>
<content>
<p>facilities and works for the benefit or protection of land or premises affected by the other authorised works.</p>
</content>
</level>
</paragraph>
<paragraph eId="article-5-4">
<num>(4)</num>
<content>
<p>
Subject to paragraph (7),
<abbr title="Nottinghamshire County Council and Nottingham City Council, or either of them">the promoter</abbr>
may carry out and maintain such other works (of whatever nature) as may be necessary or expedient for the purposes of, or for purposes ancillary to, the construction of the scheduled works.
</p>
</content>
</paragraph>
<paragraph eId="article-5-5">
<num>(5)</num>
<content>
<p>The promoter may remove any works constructed by it pursuant to this Order which have been constructed as temporary works or which it no longer requires.</p>
</content>
</paragraph>
<paragraph eId="article-5-6">
<num>(6)</num>
<content>
<p>
Where
<abbr title="Nottinghamshire County Council and Nottingham City Council, or either of them">the promoter</abbr>
lays down conduits for the accommodation of cables or other apparatus for the purposes of or associated with the authorised works it may provide in, or in connection with, such conduits, accommodation for the apparatus of any other person, and manholes and other facilities for access to such accommodation, and may permit the use of such conduits and facilities on such terms and conditions as may be agreed between it and such other person.
</p>
</content>
</paragraph>
<paragraph eId="article-5-7">
<num>(7)</num>
<intro>
<p>Paragraphs (3) and (4) shall only authorise the carrying out or maintenance of works—</p>
</intro>
<level class="para1" eId="article-5-7-a">
<num>(a)</num>
<content>
<p>within the Order limits; or</p>
</content>
</level>
<level class="para1" eId="article-5-7-b">
<num>(b)</num>
<content>
<p>within the boundaries of any street along which the construction of a street tramway is shown on the works and land plans, or which has a junction with such a street.</p>
</content>
</level>
</paragraph>
<paragraph eId="article-5-8">
<num>(8)</num>
<content>
<p>The powers of this article shall not be exercised within the boundaries of a street outside of the Order limits which has a junction with a street along which the construction of a street tramway is shown on the works and land plans without the consent of the street authority but such consent shall not be unreasonably withheld.</p>
</content>
</paragraph>
<paragraph eId="article-5-9">
<num>(9)</num>
<content>
<p>
Section 109 of the Water Resources Act 1991
<authorialNote class="footnote" eId="f00015" marker="15">
<p>
<ref eId="c00019" href="http://www.legislation.gov.uk/id/ukpga/1991/57">1991 c. 57</ref>
.
</p>
</authorialNote>
, section 23 of the Land Drainage Act 1991
<authorialNote class="footnote" eId="f00016" marker="16">
<p>
<ref eId="c00020" href="http://www.legislation.gov.uk/id/ukpga/1991/59">1991 c. 59</ref>
.
</p>
</authorialNote>
and any byelaws made under those Acts shall not apply to anything done under or in pursuance of this Order.
</p>
</content>
</paragraph>
<paragraph eId="article-5-10">
<num>(10)</num>
<content>
<p>
Section 6 of the Ecclesiastical Jurisdiction Measure 1963
<authorialNote class="footnote" eId="f00017" marker="17">
<p>
<ref eId="c00021" href="http://www.legislation.gov.uk/id/ukla/1963/1">1963 No.1</ref>
.
</p>
</authorialNote>
, section 7 of the Faculty Jurisdiction Measure 1964
<authorialNote class="footnote" eId="f00018" marker="18">
<p>
<ref eId="c00022" href="http://www.legislation.gov.uk/id/ukla/1964/5">1964 No.5</ref>
.
</p>
</authorialNote>
and Part 3 of the Care of Churches and Ecclesiastical Jurisdiction Measure 1991
<authorialNote class="footnote" eId="f00019" marker="19">
<p>
<ref eId="c00023" href="http://www.legislation.gov.uk/id/ukla/1991/1">1991 No.1</ref>
.
</p>
</authorialNote>
shall not apply to anything done under or in pursuance of this Order in relation to Work No.16A and the land numbered 1169 on the works and land plans.
</p>
</content>
</paragraph>
<paragraph eId="article-5-11">
<num>(11)</num>
<content>
<p>
The scheduled works may be constructed and maintained under the powers of this article regardless of anything contained in or done pursuant to section 53 of the
<abbr title="Act of Parliament whose long title is 'An Act for inclosing Lands in the Parish of Saint Mary in the Town and County of the Town of Nottingham'">Nottingham Inclosure Act</abbr>
or Part 1 of, or Schedule 2 to, the Commons Act 2006
<authorialNote class="footnote" eId="f00020" marker="20">
<p>
<ref eId="c00024" href="http://www.legislation.gov.uk/id/ukpga/2006/26">2006 c. 26</ref>
.
</p>
</authorialNote>
.
</p>
</content>
</paragraph>
</article>
<article eId="article-6">
<heading>Power to deviate</heading>
<num>6.</num>
<paragraph eId="article-6-1">
<num>(1)</num>
<intro>
<p>
In constructing or maintaining any of the scheduled works,
<abbr title="Nottinghamshire County Council and Nottingham City Council, or either of them">the promoter</abbr>
may—
</p>
</intro>
<level class="para1" eId="article-6-1-a">
<num>(a)</num>
<content>
<p>deviate laterally from the lines or situations shown on the works and land plans within the Order limits relating to that work shown on those plans; and</p>
</content>
</level>
<level class="para1" eId="article-6-1-b">
<num>(b)</num>
<intro>
<p>deviate vertically from the levels shown on the sections—</p>
</intro>
<level class="para2" eId="article-6-1-b-i">
<num>(i)</num>
<content>
<p>to any extent not exceeding 3 metres upwards; and</p>
</content>
</level>
<level class="para2" eId="article-6-1-b-ii">
<num>(ii)</num>
<content>
<p>to any extent downwards as may be necessary or expedient.</p>
</content>
</level>
</level>
</paragraph>
<paragraph eId="article-6-2">
<num>(2)</num>
<content>
<p>
In constructing or maintaining any work or part of a work shown on the works and land plans as being situated in a street and for which no limits of deviation are shown on those plans,
<abbr title="Nottinghamshire County Council and Nottingham City Council, or either of them">the promoter</abbr>
may deviate laterally within the boundaries of that street.
</p>
</content>
</paragraph>
<paragraph eId="article-6-3">
<num>(3)</num>
<intro>
<p>The promoter may, in constructing or maintaining the authorised tramway, lay down—</p>
</intro>
<level class="para1" eId="article-6-3-a">
<num>(a)</num>
<content>
<p>double lines of rails in place of single lines;</p>
</content>
</level>
<level class="para1" eId="article-6-3-b">
<num>(b)</num>
<content>
<p>single lines of rails in place of double lines;</p>
</content>
</level>
<level class="para1" eId="article-6-3-c">
<num>(c)</num>
<content>
<p>interlacing lines of rails in place of double or single lines; or</p>
</content>
</level>
<level class="para1" eId="article-6-3-d">
<num>(d)</num>
<content>
<p>double or single lines of rails in place of interlacing lines.</p>
</content>
</level>
</paragraph>
<paragraph eId="article-6-4">
<num>(4)</num>
<content>
<p>The power in paragraph (3) shall not be exercised in the case of the authorised street tramway without the consent of the street authority, but such consent shall not be unreasonably withheld.</p>
</content>
</paragraph>
<paragraph eId="article-6-5">
<num>(5)</num>
<content>
<p>The promoter may in constructing or maintaining the authorised street tramway lay down such number of switches and crossings as may be necessary or expedient.</p>
</content>
</paragraph>
<paragraph eId="article-6-6">
<num>(6)</num>
<content>
<p>The promoter may in constructing and maintaining the authorised tramroad provide within the limits of deviation for the tramroad such number of lines of rails and sidings, switchings and crossings as may be necessary or expedient.</p>
</content>
</paragraph>
<paragraph eId="article-6-7">
<num>(7)</num>
<intro>
<p>Without limiting the scope of paragraph (1)—</p>
</intro>
<level class="para1" eId="article-6-7-a">
<num>(a)</num>
<content>
<p>
in constructing and maintaining Works
<abbr title="Numbers">Nos.</abbr>
3, 5, 6, 6A, 10, 10A, 10B, 12, 15 and 15A
<abbr title="Nottinghamshire County Council and Nottingham City Council, or either of them">the promoter</abbr>
may, to the extent it thinks fit, deviate from the design of the bridges shown on the sections, including by varying the number of any supporting columns or other structures, the distances between them and the height or clearance above the level of any land underneath the bridges; and
</p>
</content>
</level>
<level class="para1" eId="article-6-7-b">
<num>(b)</num>
<content>
<p>
in constructing and maintaining the scheduled works
<abbr title="Nottinghamshire County Council and Nottingham City Council, or either of them">the promoter</abbr>
may, to the extent it thinks fit, deviate laterally from their points of commencement and termination shown on the works and land plans.
</p>
</content>
</level>
</paragraph>
</article>
<article eId="article-7">
<heading>Designation of works</heading>
<num>7.</num>
<paragraph eId="article-7-1">
<num>(1)</num>
<intro>
<p>Regardless of anything in the description of the scheduled works contained in Schedule 1 (scheduled works)—</p>
</intro>
<level class="para1" eId="article-7-1-a">
<num>(a)</num>
<content>
<p>the whole or any part of the authorised street tramway may be constructed within the limits of deviation for that work off-street as a tramroad, and so far as it is so constructed shall be treated for the purposes of this Order as if it were so designated; and</p>
</content>
</level>
<level class="para1" eId="article-7-1-b">
<num>(b)</num>
<content>
<p>the whole or any part of the authorised tramroad may be constructed within the limits of deviation for that work along a street as a street tramway, and so far as it is constructed shall be treated for the purposes of this Order as if it were so designated.</p>
</content>
</level>
</paragraph>
<paragraph eId="article-7-2">
<num>(2)</num>
<content>
<p>Where, by means of the creation or extinguishment of rights of way, any part of the authorised tramway which has been constructed as a tramroad becomes a street tramway, or any part which was constructed as a street tramway becomes a tramroad, it shall be treated for the purposes of this Order as if it were so designated.</p>