PART 4Supplemental powers

Discharge of water

13.—(1) The undertakers may use any watercourse or any public sewer or drain for the drainage of water in connection with the carrying out or maintenance of the authorised project and for that purpose may lay down, take up and alter pipes and may, on any land within the Order limits, make openings into, and connections with, the watercourse, public sewer or drain subject to the obtaining of consent and approval respectively pursuant to paragraphs (3) and (4).

(2) Any dispute arising from the making of connections to or the use of a public sewer or drain by the undertakers pursuant to paragraph (1) shall be determined as if it were a dispute under section 106 of the Water Industry Act 1991(1) (right to communicate with public sewers).

(3) The undertakers shall not discharge any water into any watercourse, public sewer or drain except with the consent of the person to whom it belongs; and such consent may be given subject to such terms and conditions as that person may reasonably impose, but shall not be unreasonably withheld.

(4) The undertakers shall not carry out any works to any public sewer or drain pursuant to article 13(1) except—

(a)in accordance with plans approved by the person to whom the sewer or drain belongs, but such approval shall not be unreasonably withheld; and

(b)where that person has been given the opportunity to supervise the making of the opening.

(5) The undertakers shall not, in carrying out or maintaining works pursuant to this article, damage or interfere with the bed or banks of any watercourse forming part of a main river.

(6) The undertakers shall take such steps as are reasonably practicable to secure that any water discharged into a watercourse or public sewer or drain pursuant to this article is as free as may be practicable from gravel, soil or other solid substance, oil or matter in suspension.

(7) This article does not authorise the entry into controlled waters of any matter whose entry or discharge into controlled waters is prohibited by regulation 12 of the Environmental Permitting (England and Wales) Regulations 2010(2).

(8) In this article—

(a)“public sewer or drain” means a sewer or drain which belongs to a sewerage undertakers, the Environment Agency, an internal drainage board or a local authority; and

(b)other expressions, excluding watercourse, used both in this article and in the Water Resources Act 1991, as amended by the Environmental Permitting (England and Wales) Regulations 2010 have the same meaning as in that Act.

Authority to survey and investigate the land

14.—(1) The undertakers may for the purposes of this Order enter on any land shown within the Order limits or which may be affected by the authorised project and—

(a)survey or investigate the land;

(b)without prejudice to the generality of sub-paragraph (a), make trial holes in such positions on the land as the undertakers thinks fit to investigate the nature of the surface layer and subsoil and remove soil samples;

(c)without prejudice to the generality of sub-paragraph (a), carry out ecological or archaeological investigations on such land; and

(d)place on, leave on and remove from the land apparatus for use in connection with the survey and investigation of land and making of trial holes.

(2) No land may be entered or equipment placed or left on or removed from the land under paragraph (1) unless at least 14 days’ notice has been served on every owner and occupier of the land.

(3) Any person entering land under this article on behalf of the undertakers—

(a)shall, if so required on entering the land, produce written evidence of their authority to do so; and

(b)may take with them such vehicles and equipment as are necessary to carry out the survey or investigation or to make the trial holes.

(4) No trial holes shall be made under this article—

(a)in land forming a railway without the consent of Network Rail Infrastructure Limited; or

(b)in land held by or in right of the Crown without the consent of the Crown.

(5) No trial holes shall be made under this article—

(a)in land located within the highway boundary without the consent of the highway authority; or

(b)in a private street without the consent of the street authority,

but such consent shall not be unreasonably withheld.

(6) The undertakers shall compensate the owners and occupiers of the land for any loss or damage arising by reason of the exercise of the authority conferred by this article, such compensation to be determined, in case of dispute, under Part 1 (determination of questions of disputed compensation) of the 1961 Act.

(1)

1991 c.56. Section 106 was amended by sections 36(2) and 99 of the Water Act 2003 (c.37), and amended by sections 32 and 42 of, and paragraph 16(2) of Schedule 3 to, the Flood and Water Management Act 2010 (date in force to be appointed see section 49(3)(h)(i)). There are other amendments to this section which are not relevant to this Order.

(2)

S.I. 2010/675, as amended by the Environmental Permitting (England and Wales) (Amendment) Regulations 2011 (S.I. 2011/2043), the Environmental Permitting (England and Wales) (Amendment No. 2) Regulations 2011 (S.I. 2011/2933), the Environmental Permitting (England and Wales) (Amendment) Regulations 2012 (S.I. 2012/630), the Controlled Waste (England and Wales) Regulations 2012 (S.I. 2012/811).