SCHEDULE 1AUTHORISED DEVELOPMENT
Nationally significant infrastructure project
The construction and operation of a nationally significant infrastructure project as defined in sections 14(1)(a) and 15 of the 2008 Act, comprising—
Work No. 1 – an onshore electricity generating station located on land at the Ferrybridge Power Station site, north-west of Knottingley, West Yorkshire, with a gross combined installed generating capacity of up to 90MWe, fuelled (subject to requirement 3) by waste derived fuels and comprised of the following works—
Work No. 1A – the generating station and its main process area, including—
- a
fuel reception and storage facilities, consisting of a tipping hall and vehicle ramps, shredder, fuel storage bunker and crane;
- b
a combustion system housed within a boiler hall comprising two combustion lines and associated boilers;
- c
a steam turbine and generator housed within a turbine hall;
- d
a bottom ash handling system, including storage bunker and ash collection bay;
- e
a flue gas treatment system, including residue and reagent storage silos and tanks;
- f
an emissions stack and associated emissions monitoring systems;
- g
a cooling system comprising an air cooled condenser;
- h
a compressed air system;
- i
diesel storage tanks;
- j
a process effluent storage tank;
- k
a demineralised water treatment plant;
- l
fire water tank and fire protection facilities;
- m
up to two auxiliary diesel generators each of up to 4MWe output;
- n
pipe racks and pipe runs;
- o
an electrical switchyard, including circuit breaker and transformer;
- p
a control and administrative building;
- q
a workshop building; and
- r
hardstandings, internal vehicular access roads, vehicle turning, waiting and parking areas and pedestrian and cycle facilities and routes.
- a
Work No. 1B – in connection with and in addition to Work No. 1A, supporting buildings, works and areas, including—
- a
a vehicular access road, level crossing and pedestrian and cycle facilities and routes;
- b
security gatehouses and barriers;
- c
up to four weighbridges;
- d
a heavy goods vehicle holding area;
- e
an external fuel container storage area;
- f
vehicle parking;
- g
an outage contractor compound; and
- h
a surface water attenuation pond and surface water drainage connection and pipework to Fryston Beck.
- a
Work No. 1C – in connection with and in addition to Work No. 1A, further supporting works, including a towns mains water connection and pipework to Stranglands Lane.