SCHEDULE 1AUTHORISED DEVELOPMENT

Nationally significant infrastructure project

The construction and operation of a nationally significant infrastructure project as defined in sections 14(1)(a) and 15 of the 2008 Act, comprising—

  • Work No. 1 – an onshore electricity generating station located on land at the Ferrybridge Power Station site, north-west of Knottingley, West Yorkshire, with a gross combined installed generating capacity of up to 90MWe, fuelled (subject to requirement 3) by waste derived fuels and comprised of the following works—

    • Work No. 1A – the generating station and its main process area, including—

      1. a

        fuel reception and storage facilities, consisting of a tipping hall and vehicle ramps, shredder, fuel storage bunker and crane;

      2. b

        a combustion system housed within a boiler hall comprising two combustion lines and associated boilers;

      3. c

        a steam turbine and generator housed within a turbine hall;

      4. d

        a bottom ash handling system, including storage bunker and ash collection bay;

      5. e

        a flue gas treatment system, including residue and reagent storage silos and tanks;

      6. f

        an emissions stack and associated emissions monitoring systems;

      7. g

        a cooling system comprising an air cooled condenser;

      8. h

        a compressed air system;

      9. i

        diesel storage tanks;

      10. j

        a process effluent storage tank;

      11. k

        a demineralised water treatment plant;

      12. l

        fire water tank and fire protection facilities;

      13. m

        up to two auxiliary diesel generators each of up to 4MWe output;

      14. n

        pipe racks and pipe runs;

      15. o

        an electrical switchyard, including circuit breaker and transformer;

      16. p

        a control and administrative building;

      17. q

        a workshop building; and

      18. r

        hardstandings, internal vehicular access roads, vehicle turning, waiting and parking areas and pedestrian and cycle facilities and routes.

    • Work No. 1B – in connection with and in addition to Work No. 1A, supporting buildings, works and areas, including—

      1. a

        a vehicular access road, level crossing and pedestrian and cycle facilities and routes;

      2. b

        security gatehouses and barriers;

      3. c

        up to four weighbridges;

      4. d

        a heavy goods vehicle holding area;

      5. e

        an external fuel container storage area;

      6. f

        vehicle parking;

      7. g

        an outage contractor compound; and

      8. h

        a surface water attenuation pond and surface water drainage connection and pipework to Fryston Beck.

    • Work No. 1C – in connection with and in addition to Work No. 1A, further supporting works, including a towns mains water connection and pipework to Stranglands Lane.