The Ferrybridge Multifuel 2 Power Station Order 2015

Nationally significant infrastructure project

The construction and operation of a nationally significant infrastructure project as defined in sections 14(1)(a) and 15 of the 2008 Act, comprising—

  • Work No. 1 – an onshore electricity generating station located on land at the Ferrybridge Power Station site, north-west of Knottingley, West Yorkshire, with a gross combined installed generating capacity of up to 90MWe, fuelled (subject to requirement 3) by waste derived fuels and comprised of the following works—

    • Work No. 1A – the generating station and its main process area, including—

      (a)

      fuel reception and storage facilities, consisting of a tipping hall and vehicle ramps, shredder, fuel storage bunker and crane;

      (b)

      a combustion system housed within a boiler hall comprising two combustion lines and associated boilers;

      (c)

      a steam turbine and generator housed within a turbine hall;

      (d)

      a bottom ash handling system, including storage bunker and ash collection bay;

      (e)

      a flue gas treatment system, including residue and reagent storage silos and tanks;

      (f)

      an emissions stack and associated emissions monitoring systems;

      (g)

      a cooling system comprising an air cooled condenser;

      (h)

      a compressed air system;

      (i)

      diesel storage tanks;

      (j)

      a process effluent storage tank;

      (k)

      a demineralised water treatment plant;

      (l)

      fire water tank and fire protection facilities;

      (m)

      up to two auxiliary diesel generators each of up to 4MWe output;

      (n)

      pipe racks and pipe runs;

      (o)

      an electrical switchyard, including circuit breaker and transformer;

      (p)

      a control and administrative building;

      (q)

      a workshop building; and

      (r)

      hardstandings, internal vehicular access roads, vehicle turning, waiting and parking areas and pedestrian and cycle facilities and routes.

    • Work No. 1B – in connection with and in addition to Work No. 1A, supporting buildings, works and areas, including—

      (a)

      a vehicular access road, level crossing and pedestrian and cycle facilities and routes;

      (b)

      security gatehouses and barriers;

      (c)

      up to four weighbridges;

      (d)

      a heavy goods vehicle holding area;

      (e)

      an external fuel container storage area;

      (f)

      vehicle parking;

      (g)

      an outage contractor compound; and

      (h)

      a surface water attenuation pond and surface water drainage connection and pipework to Fryston Beck.

    • Work No. 1C – in connection with and in addition to Work No. 1A, further supporting works, including a towns mains water connection and pipework to Stranglands Lane.