xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

SCHEDULE 5U.K.PARTICULARS TO BE INCLUDED IN A DESIGN NOTIFICATION OR A RELOCATION NOTIFICATION FOR A PRODUCTION INSTALLATION

4.  A description of—U.K.

(a)the chosen design concept in relation to the major hazard scenarios for the particular installation and its intended location, and the primary risk control features, including suitable diagrams, and a summary of the other design options which were considered;

(b)how the chosen design concept is intended to ensure—

(i)compliance with the requirements set out in regulations 5 (requirements as to operational integrity and composition) and 10 (integrity in dismantlement) of the Offshore Installations and Wells (Design and Construction, etc.) Regulations 1996 M1; and

(ii)that risks with the potential to cause a major accident are reduced to the lowest level that is reasonably practicable; and

(c)the criteria used to select the chosen design concept and the process by which the selection was made.

Marginal Citations

M1S.I. 1996/913, to which there is an amendment not relevant to these Regulations.