Print Options
PrintThe Whole
Instrument
PrintThe Whole
Part
PrintThe Whole
Chapter
PrintThis
Section
only
Status:
This is the original version (as it was originally made).
Technical documentation and conformity assessment
7. Before placing a lift on the market, an installer must—
(a)have a relevant conformity assessment procedure carried out; and
(b)draw up the technical documentation referred to—
(i)for a lift in respect of which the conformity assessment procedure in regulation 47(1)(a) is being carried out, in point 3 of Part B of Module B in Annex IV to the Directive (as amended from time to time);
(ii)for a lift in respect of which the conformity assessment procedure in regulation 47(1)(b) or 47(1)(d) is being carried out, in point 3.1(d) of Module H1 in Annex XI to the Directive (as amended from time to time);
(iii)for a lift in respect of which the conformity assessment procedure in regulation 47(1)(c) is being carried out, in point 3 of Module G in Annex VIII to the Directive (as amended from time to time).
Back to top