xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

[F1SCHEDULE 12E+W+SFINAL INSPECTION FOR LIFTS (Annex V to the Directive)

3.1.  The installer shall lodge an application for final inspection with a single approved body of his choice and shall provide to the approved body the following documents:E+W+S

(a)the plan of the complete lift;

(b)the plans and diagrams necessary for final inspection, in particular control circuit diagrams;

(c)copy of the instructions referred to in Schedule 1, point 7.2;

(d)a written declaration that the same application has not been lodged with any other approved body.

The approved body may not require detailed plans or precise information not necessary for verifying the conformity of the lift.

The appropriate examinations and tests set out in the relevant designated standard(s) or equivalent tests shall be carried out in order to check the conformity of the lift with the applicable essential health and safety requirements set out in Schedule 1.]