F1SCHEDULE 1AConformity Assessment Procedures for Pressure Equipment and Assemblies
Annotations:
Amendments (Textual)
PART 3Module B: Type examination
Type examination–production type
27
The manufacturer's authorised representative may lodge the application referred to in paragraph 14 and fulfil the obligations set out in paragraphs 21 and 26, provided that they are specified in the mandate.
Sch. 1A inserted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 24 para. 44 (with Sch. 24 para. 41) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)