Access and rights of way plans | | |
Key Plan | 2.3 | WSP-70001979-SK-060 Rev I |
Sheet 1 | 2.3A | WSP-70001979-SK-060 Rev H |
Sheet 2 | 2.3B | WSP-70001979-SK-060 Rev G |
Sheet 3 | 2.3C | WSP-70001979-SK-060 Rev F |
Sheet 4 | 2.3D | WSP-70001979-SK-060 Rev F |
Sheet 5 | 2.3E | WSP-70001979-SK-060 Rev F |
Sheet 6 | 2.3F | WSP-70001979-SK-060 Rev F |
Sheet 7 | 2.3G | WSP-70001979-SK-060 Rev B |
The book of reference | 4.3B | 21 August 2019 |
The bridge plans | | |
Proposed road bridges plan and long section | 2.18A | 1516-0425-WDK-SI-C-301-010 Rev P11 |
Road Bridge B1 | 2.18B | 1516-0425-WDK-SI-C-301-006 Rev P14 |
Road Bridge B2 and B3 | 2.18C | 1516-0425-WDK-SI-C-300-007 Rev P14 |
Proposed road bridge B4 section and elevation | 2.18D | 1516-0425-WDK-SI-C-301-008 Rev P17 |
The design and access statement | 7.5 | 3 August 2018 |
The environmental statement | 6.2 | 3 August 2018 (subject to the
substitutions set out below):
(i) Figures 10.001, 10.002, 10.003 and
10.004 – 12 September 2018;
(ii) Annex 10.1.1 – 12 September
2018;
(iii) Addendum to Chapter 13 (Noise
and Vibration) – 5 April 2019
(iv) Appendix I to Transport
Assessment (Appendix 15.1) (Site
Wide HGV Management Plan) – 7
May 2019
(v) Appendix H to Transport
Assessment (Appendix 15.1) (Site
Wide Travel plan) – 5 July 2019
(vi) Appendix 2.3 (Outline Demolition
and Construction Management Plan) –
5 July 2019
(vii) Appendix 10.4 (Framework
Ecological Mitigation and
Management Plan) – 5 July 2019
(viii) Updated Chapter 7 (Air Quality)
and Appendices 7.2, 7.3, 7.4, 7.6 and
7.7 – 7 August 2019
|
The future highways maintenance plans | | |
Key Plan | 2.10 | WSP-70001979-SK-091 Rev F |
Sheet 1 | 2.10A | WSP-70001979-SK-091 Rev F |
Sheet 2 | 2.10B | WSP-70001979-SK-091 Rev C |
Sheet 3 | 2.10C | WSP-70001979-SK-091 Rev C |
The highway classification plans | | |
Key Plan | 2.13 | WSP-70001979-SK-068 Rev I |
Sheet 1 | 2.13A | WSP-70001979-SK-068 Rev H |
Sheet 2 | 2.13B | WSP-70001979-SK-068 Rev E |
Sheet 3 | 2.13C | WSP-70001979-SK-068 Rev E |
The highway general arrangement plans | | |
Key Plan/Highway Masterplan | 2.9 | WSP-70001979-GA-100 Rev M |
General Arrangement Plan 101 | 2.9A | WSP-70001979-GA-101 Rev E |
General Arrangement Plan 102 | 2.9B | WSP-70001979-GA-102 Rev E |
General Arrangement Plan 103 | 2.9C | WSP-70001979-GA-103 Rev I |
General Arrangement Plan 104 | 2.9D | WSP-70001979-GA-104 Rev M |
General Arrangement Plan 105 | 2.9E | WSP-70001979-GA-105 Rev E |
General Arrangement Plan 106 | 2.9F | WSP-70001979-GA-106 Rev G |
General Arrangement Plan 107 | 2.9G | WSP-70001979-GA-107 Rev H |
General Arrangement Plan 108 | 2.9H | WSP-70001979-GA-108 Rev F |
General Arrangement Plan 109 | 2.9I | WSP-70001979-GA-109 Rev G |
General Arrangement Plan 110 | 2.9J | WSP-70001979-GA-110 Rev H |
General Arrangement Plan 111 | 2.9K | WSP-70001979-GA-111 Rev H |
The land plans | | |
Key Plan | 2.1 | Key Plan v1 |
Sheet 1 | 2.1A | Sheet 1 of 12 v0 |
Sheet 2 | 2.1B | Sheet 2 of 12 v0 |
Sheet 3 | 2.1C | Sheet 3 of 12 v0 |
Sheet 4 | 2.1D | Sheet 4 of 12 v1 |
Sheet 5 | 2.1E | Sheet 5 of 12 v0 |
Sheet 6 | 2.1F | Sheet 6 of 12 v0 |
Sheet 7 | 2.1G | Sheet 7 of 12 v0 |
Sheet 8 | 2.1H | Sheet 8 of 12 v0 |
Sheet 9 | 2.1I | Sheet 9 of 12 v0 |
Sheet 10 | 2.1J | Sheet 10 of 12 v0 |
Sheet 11 | 2.1K | Sheet 11 of 12 v0 |
Sheet 12 | 2.1L | Sheet 12 of 12 v0 |
Order limits plan | 2.4 | 4990-00011 Rev 06 |
The parameters plans | | |
Development Zone Parameters Plan | | |
Key Plan | 2.5 | 4990-02000 Rev 11 |
Sheet 1 | 2.5A | 4990-02001 Rev 11 |
Sheet 2 | 2.5B | 4990-02002 Rev 08 |
Sheet 3 | 2.5C | 4990-02003 Rev 12 |
Sheet 4 | 2.5D | 4990-02004 Rev 07 |
Floor Levels and Building Heights
Parameters Plan
| | |
Key Plan | 2.6 | 4990-02010 Rev 12 |
Sheet 1 | 2.6A | 4990-02011 Rev 11 |
Sheet 2 | 2.6B | 4990-02012 Rev 07 |
Sheet 3 | 2.6C | 4990-02013 Rev 11 |
Sheet 4 | 2.6D | 4990-02014 Rev 07 |
Green Infrastructure Parameters Plan | | |
Key Plan | 2.7 | 4990-02020 Rev 14 |
Sheet 1 | 2.7A | 4990-02021 Rev 13 |
Sheet 2 | 2.7B | 4990-02022 Rev 10 |
Sheet 3 | 2.7C | 4990-02023 Rev 14 |
Sheet 4 | 2.7D | 4990-02024 Rev 09 |
The illustrative arrangement of railway alignment | 2.14 | TRS-DRG-FA-001003 Rev 05 |
The rail terminal – illustrative expanded rail terminal layout plan | 2.15B | TRS-DRG-FA-001010 Rev 04 |
The rail section plans | | |
Rail Alignment Cross Sections – Sheet 1 | 2.16A | TRS-DRG-FA-001005 Rev 02 |
Rail Alignment Cross Sections – Sheet 2 | 2.16B | TRS-DRG-FA-001006 Rev 03 |
Rail Alignment Cross Sections – Sheet 3 | 2.16C | TRS-DRG-FA-001007 Rev 02 |
Long sections rail alignment Sheet 1 | 2.16D | TRS-DRG-FA-001004 Rev 02 |
Long sections rail alignment Sheet 2 | 2.16E | TRS-DRG-FA-001008 Rev 02 |
The speed limit plans | | |
Key Plan | 2.12 | WSP-70001979-SK-062 Rev I |
Sheet 1 | 2.12A | WSP-70001979-SK-062 Rev K |
Sheet 2 | 2.12B | WSP-70001979-SK-062 Rev F |
Sheet 3 | 2.12C | WSP-70001979-SK-062 Rev E |
SI facility plan | 2.20 | 01 |
The traffic regulation plans | | |
Key Plan | 2.11 | WSP-70001979-SK-061 Rev I |
Sheet 1 | 2.11A | WSP-70001979-SK-061 Rev H |
Sheet 2 | 2.11B | WSP-70001979-SK-061 Rev E |
Sheet 3 | 2.11C | WSP-70001979-SK-061 Rev F |
Sheet 4 | 2.11D | WSP-70001979-SK-061 Rev A |
The works plans | | |
Key Plan | 2.2 | Key Plan v3.0 |
Sheet 1 | 2.2A | Sheet 1 of 9 v3.0 |
Sheet 2 | 2.2B | Sheet 2 of 9 v3.0 |
Sheet 3 | 2.2C | Sheet 3 of 9 v1 |
Sheet 4 | 2.2D | Sheet 4 of 9 v1 |
Sheet 5 | 2.2E | Sheet 5 of 9 v1 |
Sheet 6 | 2.2F | Sheet 6 of 9 v3.0 |
Sheet 7 | 2.2G | Sheet 7 of 9 v1 |
Sheet 8 | 2.2H | Sheet 8 of 9 v1 |
Sheet 9 | 2.2I | Sheet 9 of 9 v1 |