Search Legislation

Heat Networks (Scotland) Act 2021

 Help about what version

What Version

 Help about advanced features

Advanced Features

 Help about opening options

Opening OptionsExpand opening options

Changes over time for: Section 52

 Help about opening options

Alternative versions:

Changes to legislation:

Heat Networks (Scotland) Act 2021, Section 52 is up to date with all changes known to be in force on or before 04 May 2025. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations. Help about Changes to Legislation

52Two or more local authorities acting jointly in relation to heat network zoneS

This section has no associated Explanatory Notes

(1)Where an area proposed for designation as a heat network zone falls within the area of more than one local authority, each of the local authorities in whose area the proposed heat network zone would be situated may act jointly to—

(a)designate the area as a heat network zone under section 46(1),

(b)request under section 47(4)(b) that the Scottish Ministers consider whether to designate the area as a heat network zone.

(2)Where two or more local authorities have acted jointly by virtue of subsection (1)(a) to designate as a heat network zone an area falling within the area of each of the local authorities, the local authorities may act jointly to vary the heat network zone under section 50(1).

(3)Where two or more local authorities act jointly under subsection (1) or (2), references in sections 46, 48, 49, 50 and 51 to—

(a)a local authority are references to the local authorities acting jointly, and

(b)a local authority's area are references to the combined area of the local authorities.

Commencement Information

I1S. 52 in force at 30.5.2023 by S.S.I. 2023/148, reg. 2(1)(2)(g)

Back to top

Options/Help