Modification of notification
73.Paragraphs 6 to 8 enable SNH to modify a notification prior to confirmation. Notifications may be modified by amending the matters specified in the SSSI notification (defined in section 3(4)) and SNH is accorded a degree of flexibility in this connection during the period prior to the notification being confirmed.
74.Thus the description of the land, the natural features which are of special interest or the miscellaneous other information included in the SSSI notification may be added to, removed or amended. This may, for example, be done where SNH requires to correct part of the notification or accepts a particular point made by an objector. SNH may also amend the boundaries of the site to reduce its coverage, for example, where it considers that a particular area should in fact be excluded from the site. SNH is not however permitted to use its pre-confirmation power of modification to extend the boundaries of the site or to add to the ORC list. Separate procedures exist in sections 5, 6 and 7 to allow changes to these particular components of the SSSI notification. These powers can be used before as well as after confirmation.