In measuring the realised energy savings as set out in Article 4 with a view to capturing the overall improvement in energy efficiency and to ascertaining the impact of individual measures, a harmonised calculation model which uses a combination of top-down and bottom-up calculation methods shall be used to measure the annual improvements in energy efficiency for the EEAPs referred to in Article 14.
In developing the harmonised calculation model in accordance with Article 15(2), the Committee shall aim to use, to the extent possible, data which are already routinely provided by Eurostat and/or the national statistical agencies.
A top-down calculation method means that the amount of energy savings is calculated using the national or larger-scale aggregated sectoral levels of energy savings as the starting point. Adjustments of the annual data are then made for extraneous factors such as degree days, structural changes, product mix, etc. to derive a measure that gives a fair indication of total energy efficiency improvement, as described in point 1.2. This method does not provide exact measurements at a detailed level nor does it show cause and effect relationships between measures and their resulting energy savings. However, it is usually simpler and less costly and is often referred to as ‘energy efficiency indicators’ because it gives an indication of developments.
In developing the top-down calculation method used in this harmonised calculation model, the Committee shall base its work, to the extent possible, on existing methodologies such as the ODEX model(1).
A bottom-up calculation method means that energy savings obtained through the implementation of a specific energy efficiency improvement measure are measured in kilowatt-hours (kWh), in Joules (J) or in kilogram oil equivalent (kgoe) and added to energy savings results from other specific energy efficiency improvement measures. The authorities or agencies referred to in Article 4(4) will ensure that double counting of energy savings, which results from a combination of energy efficiency improvement measures (including mechanisms), is avoided. For the bottom-up calculation method, data and methods referred to in points 2.1 and 2.2 may be used.
Before 1 January 2008, the Commission shall develop a harmonised bottom-up model. This model shall cover a level between 20 and 30 % of the annual final inland energy consumption for sectors falling within the scope of this Directive, subject to due consideration of the factors referred to in points (a), (b) and (c) below.
Until 1 January 2012, the Commission shall continue to develop this harmonised bottom-up model, which shall cover a significantly higher level of the annual final inland energy consumption for sectors falling within the scope of this Directive, subject to due consideration of the factors referred to in points (a), (b) and (c) below.
In the development of the harmonised bottom-up model, the Commission shall take the following factors into account and justify its decision accordingly:
experience with the harmonised calculation model during its first years of application;
expected potential increase in accuracy as a result of a larger share of bottom-up calculations;
estimated potential added cost and/or administrative burden.
In developing this harmonised bottom-up model in accordance with Article 15(2), the Committee shall aim to use standardised methods which entail a minimum of administrative burden and cost, notably by using the measurement methods referred to in points 2.1 and 2.2 and by focusing on those sectors where the harmonised bottom-up model can be most cost efficiently applied.
Member States that so wish may use further bottom-up measurements in addition to the part prescribed by the harmonised bottom-up model subject to the agreement of the Commission, in accordance with the procedure referred to in Article 16(2), on the basis of a description of the methodology presented by the Member State concerned.
If bottom-up calculations are not available for certain sectors, top-down indicators or mixtures of top-down and bottom-up calculations shall be used in the reports to the Commission, subject to the agreement of the Commission, in accordance with the procedure referred to in Article 16(2). In particular, when assessing requests to this effect within the context of the first EEAP described in Article 14(2), the Commission shall demonstrate the appropriate flexibility. Some top-down calculations will be necessary to measure the impact of measures implemented after 1995 (and in certain cases as early as 1991) that continue to have impact.
Energy savings shall be determined by measuring and/or estimating consumption, before and after the implementation of the measure, while ensuring adjustment and normalisation for external conditions commonly affecting energy use. Conditions commonly affecting energy use may also differ over time. Such conditions may be the likely impact of one or several plausible factors, such as:
weather conditions, such as degree days;
occupancy levels;
opening hours for non-domestic buildings;
installed equipment intensity (plant throughput); product mix;
plant throughput, level of production, volume or added value, including changes in GDP level;
schedules for installation and vehicles;
relationship with other units.