Directive 2010/31/EU of the European Parliament and of the CouncilDangos y teitl llawn

Directive 2010/31/EU of the European Parliament and of the Council of 19 May 2010 on the energy performance of buildings (recast)

[F1Article 15 U.K. Inspection of air-conditioning systems

1. Member States shall lay down the necessary measures to establish regular inspections of the accessible parts of air-conditioning systems or of systems for combined air-conditioning and ventilation, with an effective rated output of over 70 kW. The inspection shall include an assessment of the efficiency and sizing of the air-conditioning system compared with the cooling requirements of the building and, where relevant, consider the capabilities of the air-conditioning system or of the system for combined air-conditioning and ventilation to optimise its performance under typical or average operating conditions.

Where no changes have been made to the air-conditioning system or to the system for combined air-conditioning and ventilation or to the cooling requirements of the building following an inspection carried out pursuant to this paragraph, Member States may choose not to require the assessment of the sizing of the air-conditioning system to be repeated.

Member States that maintain more stringent requirements pursuant to Article 1(3) shall be exempt from the obligation to notify them to the Commission.

2. Technical building systems that are explicitly covered by an agreed energy performance criterion or a contractual arrangement specifying an agreed level of energy efficiency improvement, such as energy performance contracting, or that are operated by a utility or network operator and therefore subject to performance monitoring measures on the system side, shall be exempt from the requirements laid down in paragraph 1, provided that the overall impact of such an approach is equivalent to that resulting from paragraph 1.

3. As an alternative to paragraph 1 and provided that the overall impact is equivalent to that resulting from paragraph 1, Member States may opt to take measures to ensure the provision of advice to users concerning the replacement of air-conditioning systems or systems for combined air-conditioning and ventilation, other modifications to the air-conditioning system or system for combined air-conditioning and ventilation and alternative solutions to assess the efficiency and appropriate size of those systems.

Before applying the alternative measures referred to in the first subparagraph of this paragraph, each Member State shall, by means of submitting a report to the Commission, document the equivalence of the impact of those measures to the impact of the measures referred to in paragraph 1.

[F2Such a report shall be submitted to the Commission as part of the Member States' integrated national energy and climate plans referred to in Article 3 of Regulation (EU) 2018/1999.]

4. Member States shall lay down requirements to ensure that, where technically and economically feasible, non-residential buildings with an effective rated output for systems for air-conditioning or systems for combined air-conditioning and ventilation of over 290 kW are equipped with building automation and control systems by 2025.

The building automation and control systems shall be capable of:

(a) continuously monitoring, logging, analysing and allowing for adjusting energy use;

(b) benchmarking the building’s energy efficiency, detecting losses in efficiency of technical building systems, and informing the person responsible for the facilities or technical building management about opportunities for energy efficiency improvement; and

(c) allowing communication with connected technical building systems and other appliances inside the building, and being interoperable with technical building systems across different types of proprietary technologies, devices and manufacturers.

5. Member States may lay down requirements to ensure that residential buildings are equipped with:

(a) the functionality of continuous electronic monitoring that measures systems’ efficiency and informs building owners or managers when it has fallen significantly and when system servicing is necessary, and

(b) effective control functionalities to ensure optimum generation, distribution, storage and use of energy.

6. Buildings that comply with paragraph 4 or 5 shall be exempt from the requirements laid down in paragraph 1.]