xmlns:atom="http://www.w3.org/2005/Atom"
The manufacturer shall operate an approved quality system for the final product inspection and testing of the pressure equipment concerned as specified in point 3 and shall be subject to surveillance as specified in point 4.
The application shall include:
the name and address of the manufacturer and, if the application is lodged by the authorised representative, his name and address as well,
a written declaration that the same application has not been lodged with any other notified body,
all relevant information on the pressure equipment type envisaged,
the documentation concerning the quality system,
the technical documentation of the approved type and a copy of the EU-type examination certificate.
All the elements, requirements and provisions adopted by the manufacturer shall be documented in a systematic and orderly manner in the form of written policies, procedures and instructions. This quality system documentation shall permit a consistent interpretation of the quality programmes, plans, manuals and records.
It shall, in particular, contain an adequate description of:
the quality objectives and the organisational structure, responsibilities and powers of the management with regard to product quality,
the examinations and tests that will be carried out after manufacture,
the quality records, such as inspection reports and test data, calibration data, reports concerning the qualifications or approvals of the personnel concerned, particularly those of the personnel undertaking the permanent joining of parts and the non-destructive tests in accordance with points 3.1.2 and 3.1.3 of Annex I,
the means of monitoring the effective operation of the quality system.
In addition to experience in quality management systems, the auditing team shall have at least one member with experience of evaluation in the relevant pressure equipment field and pressure equipment technology concerned and knowledge of the applicable requirements of this Directive. The audit shall include an assessment visit to the manufacturer’s premises.
The auditing team shall review the technical documentation referred to in point 3.1, fifth indent, in order to verify the manufacturer’s ability to identify the relevant requirements of this Directive and to carry out the necessary examinations with a view to ensuring compliance of the pressure equipment with those requirements.
The decision shall be notified to the manufacturer. The notification shall contain the conclusions of the audit and the reasoned assessment decision.
The notified body shall evaluate any proposed changes and decide whether the modified quality system will continue to satisfy the requirements referred to in point 3.2 or whether a reassessment is necessary.
It shall notify the manufacturer of its decision. The notification shall contain the conclusions of the examination and the reasoned assessment decision.
the quality system documentation,
the technical documentation,
the quality records, such as inspection reports and test data, calibration data, reports concerning the qualifications of the personnel concerned, etc.
The need for such additional visits, and the frequency thereof, will be determined on the basis of a visit control system operated by the notified body. In particular, the following factors shall be considered in the visit control system:
the category of the pressure equipment,
the results of previous surveillance visits,
the need to follow up corrective actions,
special conditions linked to the approval of the system, where applicable,
significant changes in manufacturing organisation, policy or techniques.
During such visits, the notified body may, if necessary, carry out product tests, or have them carried out, in order to verify that the quality system is functioning correctly. The notified body shall provide the manufacturer with a visit report and, if tests have been carried out, with a test report.
A copy of the EU declaration of conformity shall be made available to the relevant authorities upon request.
the documentation referred to in point 3.1,
the change referred to in point 3.5, as approved,
the decisions and reports from the notified body which are referred to in points 3.3, 3.5, 4.3 and 4.4.
Each notified body shall inform the other notified bodies of quality system approvals which it has refused, suspended or withdrawn, and, upon request, of quality system approvals which it has issued.
The manufacturer’s obligations set out in points 3.1, 3.5, 5 and 6 may be fulfilled by his authorised representative, on his behalf and under his responsibility, provided that they are specified in the mandate.