xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"
CHAPTER VI CONFORMITY ASSESSMENT BODIES
Article 29.Obligation of notifying authorities to provide information
Article 33.Presumption of conformity of a conformity assessment body
Article 34.Subsidiaries of, and subcontracting by, notified bodies
Article 38.Identification numbers and lists of notified bodies
Article 42.Obligation of notified bodies to provide information
CHAPTER VIII TRANSITIONAL AND FINAL PROVISIONS
1.1.1. The design, construction or assembly, maintenance and monitoring of safety-critical...
1.1.2. The parameters involved in the wheel/rail contact must meet the...
1.1.3. The components used must withstand any normal or exceptional stresses...
1.1.4. The design of fixed installations and rolling stock and the...
1.1.5. Any devices intended to be handled by users must be...
1.4.1. The environmental impact of establishment and operation of the rail...
1.4.2. The materials used in the trains and infrastructures must prevent...
1.4.3. The rolling stock and energy-supply systems must be designed and...
1.4.4. The design and operation of the rail system must not...
1.4.5. Operation of the rail system must not give rise to...
2. Requirements specific to each subsystem
‘EC’ VERIFICATION PROCEDURE FOR SUBSYSTEMS
2. CERTIFICATE OF VERIFICATION ISSUED BY A NOTIFIED BODY
2.4. Technical file accompanying the ‘EC’ declaration of verification.
2.5. Surveillance by notified bodies.
2.5.1. The notified body responsible for checking production must have permanent...
2.5.2. The notified body responsible for checking implementation must periodically carry...
2.5.3. In addition, the notified body may pay unexpected visits to...
2.5.4. The notified body shall be able to monitor a subsystem...
4. VERIFICATION OF PARTS OF SUBSYSTEMS IN ACCORDANCE WITH ARTICLE 15(7)...
ATTACHMENTS