- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Gwreiddiol (Fel y’i mabwysiadwyd gan yr UE)
Regulation (EU) No 305/2011 of the European Parliament and of the Council of 9 March 2011 laying down harmonised conditions for the marketing of construction products and repealing Council Directive 89/106/EEC (Text with EEA relevance)
When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.
Mae unrhyw newidiadau sydd wedi cael eu gwneud yn barod gan y tîm yn ymddangos yn y cynnwys a chyfeirir atynt gydag anodiadau.Ar ôl y diwrnod ymadael bydd tair fersiwn o’r ddeddfwriaeth yma i’w gwirio at ddibenion gwahanol. Y fersiwn legislation.gov.uk yw’r fersiwn sy’n weithredol yn y Deyrnas Unedig. Y Fersiwn UE sydd ar EUR-lex ar hyn o bryd yw’r fersiwn sy’n weithredol yn yr UE h.y. efallai y bydd arnoch angen y fersiwn hon os byddwch yn gweithredu busnes yn yr UE. EUR-Lex Y fersiwn yn yr archif ar y we yw’r fersiwn swyddogol o’r ddeddfwriaeth fel yr oedd ar y diwrnod ymadael cyn cael ei chyhoeddi ar legislation.gov.uk ac unrhyw newidiadau ac effeithiau a weithredwyd yn y Deyrnas Unedig wedyn. Mae’r archif ar y we hefyd yn cynnwys cyfraith achos a ffurfiau mewn ieithoedd eraill o EUR-Lex. The EU Exit Web Archive legislation_originated_from_EU_p3
There are currently no known outstanding effects for the Regulation (EU) No 305/2011 of the European Parliament and of the Council, ANNEX V.
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
Textual Amendments
The manufacturer shall draw up the declaration of performance and determine the product-type on the basis of the assessments and verifications of constancy of performance carried out under the following systems:
The manufacturer shall carry out:
factory production control;
further testing of samples taken at the manufacturing plant by the manufacturer in accordance with the prescribed test plan.
The [F2approved] product certification body shall decide on the issuing, restriction, suspension or withdrawal of the certificate of constancy of performance of the construction product on the basis of the outcome of the following assessments and verifications carried out by that body:
an assessment of the performance of the construction product carried out on the basis of testing (including sampling), calculation, tabulated values or descriptive documentation of the product;
initial inspection of the manufacturing plant and of factory production control;
continuing surveillance, assessment and evaluation of factory production control;
audit — testing of samples taken by the [F2approved] product certification body at the manufacturing plant or at the manufacturer's storage facilities.
Textual Amendments
F2Word in Annex 5 Point 1 substituted (31.12.2020) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/465), reg. 1, Sch. 1 para. 69(2) (with Sch. 1 paras. 70, 75) (as amended by S.I. 2020/1359, reg. 1, Sch. 1 paras. 16, 17); 2020 c. 1, Sch. 5 para. 1(1)
The manufacturer shall carry out:
factory production control;
further testing of samples taken at the manufacturing plant by the manufacturer in accordance with the prescribed test plan.
The [F2approved] product certification body shall decide on the issuing, restriction, suspension or withdrawal of the certificate of constancy of performance of the construction product on the basis of the outcome of the following assessments and verifications carried out by that body:
an assessment of the performance of the construction product carried out on the basis of testing (including sampling), calculation, tabulated values or descriptive documentation of the product;
initial inspection of the manufacturing plant and of factory production control;
continuing surveillance, assessment and evaluation of factory production control.
The manufacturer shall carry out:
an assessment of the performance of the construction product on the basis of testing (including sampling), calculation, tabulated values or descriptive documentation of that product;
factory production control;
testing of samples taken at the manufacturing plant by the manufacturer in accordance with the prescribed test plan.
The [F2approved] factory production control certification body shall decide on the issuing, restriction, suspension or withdrawal of the certificate of conformity of the factory production control on the basis of the outcome of the following assessments and verifications carried out by that body:
initial inspection of the manufacturing plant and of factory production control;
continuing surveillance, assessment and evaluation of factory production control.
The manufacturer shall carry out factory production control.
The [F2approved] laboratory shall assess the performance on the basis of testing (based on sampling carried out by the manufacturer), calculation, tabulated values or descriptive documentation of the construction product.
The manufacturer shall carry out:
an assessment of the performance of the construction product on the basis of testing, calculation, tabulated values or descriptive documentation of that product;
factory production control.
No tasks require the intervention of [F2approved] bodies.
[F4Approved] bodies undertaking tasks under Systems 1+, 1 and 3 as well as manufacturers undertaking tasks under Systems 2+ and 4 shall consider the [F3UK] Technical Assessment issued for the construction product in question as the assessment of the performance of that product. [F4Approved] bodies and manufacturers shall therefore not undertake the tasks referred to in points 1.1.(b)(i), 1.2.(b)(i), 1.3.(a)(i), 1.4.(b) and 1.5.(a)(i) respectively.
Textual Amendments
F4Word in Annex 5 Point 1.6 substituted (31.12.2020) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/465), reg. 1, Sch. 1 para. 69(3)(b) (with Sch. 1 paras. 70, 75) (as amended by S.I. 2020/1359, reg. 1, Sch. 1 paras. 16, 17); 2020 c. 1, Sch. 5 para. 1(1)
Textual Amendments
F3Word in Annex 5 Point 1.6 substituted (31.12.2020) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/465), reg. 1, Sch. 1 para. 69(3)(a) (with Sch. 1 paras. 70, 75) (as amended by S.I. 2020/1359, reg. 1, Sch. 1 paras. 16, 17); 2020 c. 1, Sch. 5 para. 1(1)
With respect to the function of [F5approved] bodies involved in the assessment and verification of constancy of performance for construction products, distinction shall be made between:
product certification body: a body [F5approved], in accordance with Chapter VII, to carry out constancy of performance certification;
factory production control certification body: a body [F5approved], in accordance with Chapter VII, to carry out factory production control certification;
laboratory: a body [F5approved], in accordance with Chapter VII, to measure, examine, test, calculate or otherwise assess the performance of construction products.
Textual Amendments
F5Word in Annex 5 Point 2 substituted (31.12.2020) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/465), reg. 1, Sch. 1 para. 69(4) (with Sch. 1 paras. 70, 75) (as amended by S.I. 2020/1359, reg. 1, Sch. 1 paras. 16, 17); 2020 c. 1, Sch. 5 para. 1(1)
Reaction to fire
Resistance to fire
External fire performance
Acoustic performance
Emissions of dangerous substances.]
Textual Amendments
F6Word in Annex 5 Point 3 substituted (31.12.2020) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/465), reg. 1, Sch. 1 para. 69(5) (with Sch. 1 paras. 70, 75) (as amended by S.I. 2020/1359, reg. 1, Sch. 1 paras. 16, 17); 2020 c. 1, Sch. 5 para. 1(1)
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i mabwysiadwyd gan yr UE): Mae'r wreiddiol version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Mae’r llinell amser yma yn dangos y fersiynau gwahanol a gymerwyd o EUR-Lex yn ogystal ag unrhyw fersiynau dilynol a grëwyd ar ôl y diwrnod ymadael o ganlyniad i newidiadau a wnaed gan ddeddfwriaeth y Deyrnas Unedig.
Cymerir dyddiadau fersiynau’r UE o ddyddiadau’r dogfennau ar EUR-Lex ac efallai na fyddant yn cyfateb â’r adeg pan ddaeth y newidiadau i rym ar gyfer y ddogfen.
Ar gyfer unrhyw fersiynau a grëwyd ar ôl y diwrnod ymadael o ganlyniad i newidiadau a wnaed gan ddeddfwriaeth y Deyrnas Unedig, bydd y dyddiad yn cyd-fynd â’r dyddiad cynharaf y daeth y newid (e.e. ychwanegiad, diddymiad neu gyfnewidiad) a weithredwyd i rym. Am ragor o wybodaeth gweler ein canllaw i ddeddfwriaeth ddiwygiedig ar Ddeall Deddfwriaeth.
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys