- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Pwynt Penodol mewn Amser (23/03/2016)
- Gwreiddiol (Fel y’i mabwysiadwyd gan yr UE)
Commission Delegated Regulation (EU) 2016/1075 of 23 March 2016 supplementing Directive 2014/59/EU of the European Parltime and of the Council with regard to regulatory technical standards specifying the content of recovery plans, resolution plans and group resolution plans, the minimum criteria that the competent authority is to assess as regards recovery plans and group recovery plans, the conditions for group financial support, the requirements for independent valuers, the contractual recognition of write-down and conversion powers, the procedures and contents of notification requirements and of notice of suspension and the operational functioning of the resolution colleges (Text with EEA relevance)
Pan adawodd y DU yr UE, cyhoeddodd legislation.gov.uk ddeddfwriaeth yr UE a gyhoeddwyd gan yr UE hyd at ddiwrnod cwblhau’r cyfnod gweithredu (31 Rhagfyr 2020 11.00 p.m.). Ar legislation.gov.uk, mae'r eitemau hyn o ddeddfwriaeth yn cael eu diweddaru'n gyson ag unrhyw ddiwygiadau a wnaed gan y DU ers hynny.
Mae legislation.gov.uk yn cyhoeddi fersiwn y DU. Mae EUR-Lex yn cyhoeddi fersiwn yr UE. Mae Archif Gwe Ymadael â’r UE yn rhoi cipolwg ar fersiwn EUR-Lex o ddiwrnod cwblhau’r cyfnod gweithredu (31 Rhagfyr 2020 11.00 p.m.).
Point in time view as at 23/03/2016.
Commission Delegated Regulation (EU) 2016/1075, Article 80 is up to date with all changes known to be in force on or before 20 December 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations.
EUR 2016 No. 1075 may be subject to amendment by EU Exit Instruments made by the Bank of England under powers set out in The Financial Regulators' Powers (Technical Standards etc.) (Amendment etc.) (EU Exit) Regulations 2018 (S.I. 2018/1115), regs. 2, 3, Sch. Pt. 3. These amendments are not currently available on legislation.gov.uk. Details of relevant amending instruments can be found on their website/s.
EUR 2016 No. 1075 may be subject to amendment by EU Exit Instruments made by both the Prudential Regulation Authority and the Financial Conduct Authority under powers set out in The Financial Regulators' Powers (Technical Standards etc.) (Amendment etc.) (EU Exit) Regulations 2018 (S.I. 2018/1115), regs. 2, 3, Sch. Pt. 4. These amendments are not currently available on legislation.gov.uk. Details of relevant amending instruments can be found on their website/s.
Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.
1.The group-level resolution authority shall, taking into account the outcome of the dialogue under Article 79(5) and (6), as appropriate, prepare a draft joint decision on measures to address or remove substantive impediments to resolvability.
2.The draft joint decision shall set out all of the following items:
(a)the name of the Union parent undertaking and the group entities to which the joint decision relates and applies;
(b)the names of the group-level resolution authority and the resolution authorities of subsidiaries reaching the joint decision;
(c)the names of the relevant competent authorities and the names of the resolution authorities of significant branches that have been consulted on the resolvability of the group, on the measures to address or remove substantive impediments, and on the observations and alternative measures, if any, submitted by the Union parent undertaking;
(d)the names of the observers where those observers were involved in the joint decision process in accordance with the terms and conditions of observers' participation as noted in the written arrangements;
(e)the references to the applicable Union and national law relating to the preparation, finalisation and application of the joint decision;
(f)the date of the joint decision;
(g)the measures pursuant to Article 17(5) and (6) of 2014/59/EU decided by the group-level resolution authority and the resolution authorities of subsidiaries and the time period within which the respective group entities shall address these measures;
(h)where the measures proposed by the Union parent undertaking are not accepted or are partially accepted by the group-level resolution authority and the resolution authorities of subsidiaries, an explanation of how the measures proposed by the Union parent undertaking are assessed as not fit to remove the substantive impediments to resolvability and how the measures referred to in point (g) would effectively reduce or remove the substantive impediments to resolvability;
(i)a summary of views expressed by the authorities consulted in the joint decision process;
(j)where the EBA has been consulted during the joint decision process, an explanation of any deviation from the advice of the EBA.
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i mabwysiadwyd gan yr UE): Mae'r wreiddiol version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Mae’r llinell amser yma yn dangos y fersiynau gwahanol a gymerwyd o EUR-Lex yn ogystal ag unrhyw fersiynau dilynol a grëwyd ar ôl y diwrnod ymadael o ganlyniad i newidiadau a wnaed gan ddeddfwriaeth y Deyrnas Unedig.
Cymerir dyddiadau fersiynau’r UE o ddyddiadau’r dogfennau ar EUR-Lex ac efallai na fyddant yn cyfateb â’r adeg pan ddaeth y newidiadau i rym ar gyfer y ddogfen.
Ar gyfer unrhyw fersiynau a grëwyd ar ôl y diwrnod ymadael o ganlyniad i newidiadau a wnaed gan ddeddfwriaeth y Deyrnas Unedig, bydd y dyddiad yn cyd-fynd â’r dyddiad cynharaf y daeth y newid (e.e. ychwanegiad, diddymiad neu gyfnewidiad) a weithredwyd i rym. Am ragor o wybodaeth gweler ein canllaw i ddeddfwriaeth ddiwygiedig ar Ddeall Deddfwriaeth.
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys