Commission Regulation (EU) 2016/631 of 14 April 2016 establishing a network code on requirements for grid connection of generators (Text with EEA relevance)

 Help about what version

Pa Fersiwn

 Help about opening options

Dewisiadau Agor

 Help about UK-EU Regulation

Legislation originating from the EU

When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.

Close

Mae hon yn eitem o ddeddfwriaeth sy’n deillio o’r UE

Mae unrhyw newidiadau sydd wedi cael eu gwneud yn barod gan y tîm yn ymddangos yn y cynnwys a chyfeirir atynt gydag anodiadau.Ar ôl y diwrnod ymadael bydd tair fersiwn o’r ddeddfwriaeth yma i’w gwirio at ddibenion gwahanol. Y fersiwn legislation.gov.uk yw’r fersiwn sy’n weithredol yn y Deyrnas Unedig. Y Fersiwn UE sydd ar EUR-lex ar hyn o bryd yw’r fersiwn sy’n weithredol yn yr UE h.y. efallai y bydd arnoch angen y fersiwn hon os byddwch yn gweithredu busnes yn yr UE. EUR-Lex Y fersiwn yn yr archif ar y we yw’r fersiwn swyddogol o’r ddeddfwriaeth fel yr oedd ar y diwrnod ymadael cyn cael ei chyhoeddi ar legislation.gov.uk ac unrhyw newidiadau ac effeithiau a weithredwyd yn y Deyrnas Unedig wedyn. Mae’r archif ar y we hefyd yn cynnwys cyfraith achos a ffurfiau mewn ieithoedd eraill o EUR-Lex. The EU Exit Web Archive legislation_originated_from_EU_p3

Status:

EU_status_warning_original_version
This legislation may since have been updated - see the latest available (revised) version

Article 48Compliance tests for type C power park modules

1.In addition to the compliance tests for type B power park modules described in Article 47, power-generating facility owners shall undertake the compliance tests set out in paragraphs 2 to 9 in relation to type C power park modules. Instead of the relevant test, the power-generating facility owner may use equipment certificates issued by an authorised certifier to demonstrate compliance with the relevant requirement. In such a case, the equipment certificate shall be provided to the relevant system operator.

2.With regard to the active power controllability and control range test the following requirements shall apply:

(a)the power park module's technical capability to operate at a load level below the setpoint set by the relevant system operator or the relevant TSO shall be demonstrated;

(b)the test shall be deemed successful if the following conditions are fulfilled:

(i)

the load level of the power park module is kept below the setpoint;

(ii)

the setpoint is implemented according to the requirements laid down in Article 15(2)(a); and

(iii)

the accuracy of the regulation complies with the value specified in point (a) of Article 15(2).

3.With regard to the LFSM-U response test the following requirements shall apply:

(a)the power park module's technical capability to continuously modulate active power to contribute to frequency control in case of a large frequency drop in the system shall be demonstrated;

(b)the test shall be carried out by simulating the frequency steps and ramps big enough to trigger at least 10 % of maximum capacity active power change with a starting point of no more than 80 % of maximum capacity, taking into account the droop settings and the deadband;

(c)the test shall be deemed successful if the following conditions are fulfilled:

(i)

the test results, for both dynamic and static parameters, comply with the requirements laid down in Article 15(2)(c); and

(ii)

undamped oscillations do not occur after the step change response.

4.With regard to the FSM response test the following requirements shall apply:

(a)the power park module's technical capability to continuously modulate active power over the full operating range between maximum capacity and minimum regulating level to contribute to frequency control shall be demonstrated. The steady-state parameters of regulations, such as insensitivity, droop, deadband and range of regulation, as well as dynamic parameters, including frequency step change response shall be verified;

(b)the test shall be carried out by simulating frequency steps and ramps big enough to trigger the whole active power frequency response range, taking into account the droop settings and the deadband. Simulated frequency deviation signals shall be injected to perform the test;

(c)the test shall be deemed successful if the following conditions are fulfilled:

(i)

the activation time of the full active power frequency response range as a result of a frequency step change is no longer than that required by point (d) of Article 15(2);

(ii)

undamped oscillations do not occur after the step change response;

(iii)

the initial delay is in line with point (d) of Article 15(2);

(iv)

the droop settings are available within the ranges specified in point (d) of Article 15(2) and the deadband (threshold) is not higher than the value chosen by the relevant TSO; and

(v)

the insensitivity of active power frequency response does not exceed the requirement set out in point (d) of Article 15(2).

5.With regard to the frequency restoration control test the following requirements shall apply:

(a)the power park module's technical capability to participate in frequency restoration control shall be demonstrated. The cooperation of both FSM and frequency restoration control shall be checked;

(b)the test shall be deemed successful if the results for both dynamic and static parameters comply with the requirements of point (e) of Article 15(2).

6.With regard to the reactive power capability test the following requirements shall apply:

(a)the power park module's technical capability to provide leading and lagging reactive power capability in accordance with points (b) and (c) of Article 21(3) shall be demonstrated;

(b)it shall be carried out at maximum reactive power, both leading and lagging, and shall verify the following parameters:

(i)

operation in excess of 60 % of maximum capacity for 30 min;

(ii)

operation within the range of 30-50 % of maximum capacity for 30 min; and

(iii)

operation within the range of 10-20 % of maximum capacity for 60 min;

(c)the test shall be deemed successful if the following criteria are fulfilled:

(i)

the power park module operates for a duration no shorter than the requested duration at maximum reactive power, both leading and lagging, in each parameter specified in paragraph 6(b);

(ii)

the power park module's capability to change to any reactive power target value within the agreed or decided reactive power range is demonstrated; and

(iii)

no protection action takes place within the operation limits specified by the reactive power capacity diagram.

7.With regard to the voltage control mode test the following requirements shall apply:

(a)the power park module's capability to operate in voltage control mode referred to in the conditions set out in points (ii) to (iv) of Article 21(3)(d) shall be demonstrated;

(b)The voltage control mode test shall verify the following parameters:

(i)

the implemented slope and deadband according to Article 21(3)(d)(iii);

(ii)

the accuracy of the regulation;

(iii)

the insensitivity of the regulation; and

(iv)

the time of reactive power activation;

(c)The test shall be deemed successful if the following conditions are fulfilled:

(i)

the range of regulation and adjustable droop and deadband complies with the agreed or decided characteristic parameters set out in point (d) of Article 21(3);

(ii)

the insensitivity of voltage control is not higher than 0,01 pu, in accordance with point (d) of Article 21(3); and

(iii)

following a step change in voltage, 90 % of the change in reactive power output has been achieved within the times and tolerances specified in point (d) of Article 21(3).

8.With regard to the reactive power control mode test the following requirements shall apply:

(a)the power park module's capability to operate in reactive power control mode, in accordance with point (v) of Article 21(3)(d), shall be demonstrated;

(b)the reactive power control mode test shall be complementary to the reactive power capability test;

(c)the reactive power control mode test shall verify the following parameters:

(i)

the reactive power setpoint range and increment;

(ii)

the accuracy of the regulation; and

(iii)

the time of reactive power activation.

(d)the test shall be deemed successful if the following conditions are fulfilled:

(i)

the reactive power setpoint range and increment are ensured in accordance with point (d) of Article 21(3); and

(ii)

the accuracy of the regulation complies with the conditions set out in point (d) of Article 21(3).

9.With regard to the power factor control mode test the following requirements shall apply:

(a)the power park module's capability to operate in power factor control mode in accordance with point (vi) of Article 21(3)(d) shall be demonstrated;

(b)the power factor control mode test shall verify the following parameters:

(i)

the power factor setpoint range;

(ii)

the accuracy of the regulation; and

(iii)

the response of reactive power due to step change of active power;

(c)the test shall be deemed successful if the following conditions are cumulatively fulfilled:

(i)

the power factor setpoint range and increment are ensured in accordance with point (d) of Article 21(3);

(ii)

the time of reactive power activation as a result of step active power change does not exceed the requirement laid down in point (d) of Article 21(3); and

(iii)

the accuracy of the regulation complies with the value specified in point (d) of Article 21(3).

10.With regard to the tests referred to in paragraphs 7, 8 and 9, the relevant system operator may select only one of the three control options for testing.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i mabwysiadwyd gan yr UE): Mae'r wreiddiol version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel adopted version that was used for the EU Official Journal
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel adopted fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill