Commission Regulation (EU) 2017/459 of 16 March 2017 establishing a network code on capacity allocation mechanisms in gas transmission systems and repealing Regulation (EU) No 984/2013 (Text with EEA relevance)

 Help about what version

Pa Fersiwn

 Help about opening options

Dewisiadau Agor

 Help about UK-EU Regulation

Legislation originating from the EU

When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.

Close

Mae hon yn eitem o ddeddfwriaeth sy’n deillio o’r UE

Mae unrhyw newidiadau sydd wedi cael eu gwneud yn barod gan y tîm yn ymddangos yn y cynnwys a chyfeirir atynt gydag anodiadau.Ar ôl y diwrnod ymadael bydd tair fersiwn o’r ddeddfwriaeth yma i’w gwirio at ddibenion gwahanol. Y fersiwn legislation.gov.uk yw’r fersiwn sy’n weithredol yn y Deyrnas Unedig. Y Fersiwn UE sydd ar EUR-lex ar hyn o bryd yw’r fersiwn sy’n weithredol yn yr UE h.y. efallai y bydd arnoch angen y fersiwn hon os byddwch yn gweithredu busnes yn yr UE. EUR-Lex Y fersiwn yn yr archif ar y we yw’r fersiwn swyddogol o’r ddeddfwriaeth fel yr oedd ar y diwrnod ymadael cyn cael ei chyhoeddi ar legislation.gov.uk ac unrhyw newidiadau ac effeithiau a weithredwyd yn y Deyrnas Unedig wedyn. Mae’r archif ar y we hefyd yn cynnwys cyfraith achos a ffurfiau mewn ieithoedd eraill o EUR-Lex. The EU Exit Web Archive legislation_originated_from_EU_p3

Status:

EU_status_warning_original_version
This legislation may since have been updated - see the latest available (revised) version

Article 6Capacity calculation and maximisation

1.The maximum technical capacity shall be made available to network users, taking into account system integrity, safety and efficient network operation.

(a)In order to maximise the offer of bundled capacity through the optimisation of the technical capacity transmission system operators shall take the following measures at interconnection points, giving priority to those interconnection points where there is contractual congestion pursuant to point 2.2.3(1) of Annex I to Regulation (EC) No 715/2009: the transmission system operators shall establish and apply a joint method, setting out the specific steps to be taken by the respective transmission system operators to achieve the required optimisation:

(1)

the joint method shall include an in-depth analysis of the technical capacities, including any discrepancies therein on both sides of an interconnection point, as well as the specific actions and detailed timetable — including possible implications and containing the regulatory approvals required to recover costs and adjust the regulatory regime — necessary to maximise the offer of bundled capacity. Such specific actions shall not be detrimental to the offer of capacity at other relevant points of the concerned systems and points to distribution networks relevant for security of supply to final customers, such as those to storage facilities, LNG terminals and protected customers as defined in Regulation (EU) No 994/2010 of the European Parliament and of the Council(1);

(2)

the calculation methodology and the rules of making available the capacity, adopted by the transmission system operators, shall address specific situations where competing capacities across systems involve interconnection points and exit points to storage facilities;

(3)

this in-depth analysis shall take into account assumptions made in the Union-wide 10-year network development plan pursuant to Article 8 of Regulation (EC) No 715/2009, national investment plans, relevant obligations under the applicable national laws and any relevant contractual obligations;

(4)

the relevant transmission system operators shall apply a dynamic approach to re-calculating technical capacity, where appropriate in conjunction with the dynamic calculation applied for additional capacity on the basis of point 2.2.2.2 of Annex I to Regulation (EC) No 715/2009, jointly identifying the appropriate frequency for re-calculation per interconnection point and having regard to the particular specificities thereof;

(5)

in the joint method, adjacent transmission system operators shall consult other transmission system operators specifically affected by the interconnection point;

(6)

transmission system operators shall have regard to information that network users may provide with regard to expected future flows when re-calculating the technical capacity.

(b)the transmission system operators shall jointly assess at least the following parameters and where appropriate adjust them:

(1)

pressure commitments;

(2)

all relevant demand and supply scenarios, including details on reference climatic conditions and network configurations associated with extreme scenarios;

(3)

calorific value.

2.Where the optimisation of technical capacity causes costs to the transmission system operators, particularly costs that unevenly impact transmission system operators on either side of an interconnection point, transmission system operators shall be allowed to recover such efficiently incurred costs via the regulatory framework established by the relevant regulatory authorities in accordance with Article 13 of Regulation (EC) No 715/2009 and Article 42 of Directive 2009/73/EC. Article 8(1) of the Regulation (EC) No 713/2009 shall apply.

3.Where appropriate, national regulatory authorities shall consult network users on the applied calculation method and joint approach.

4.Changes in the amount of bundled capacity offered at interconnection points as a result of the process pursuant to paragraph 1 shall be included in the report of the Agency published pursuant to point 2.2.1(2) of Annex I to Regulation (EC) No 715/2009.

(1)

Regulation (EU) No 994/2010 of the European Parliament and of the Council of 20 October 2010 concerning measures to safeguard security of gas supply and repealing Council Directive 2004/67/EC (OJ L 295, 12.11.2010, p. 1).

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i mabwysiadwyd gan yr UE): Mae'r wreiddiol version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel adopted version that was used for the EU Official Journal
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel adopted fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill