Chwilio Deddfwriaeth

Commission Regulation (EU) 2017/459Dangos y teitl llawn

Commission Regulation (EU) 2017/459 of 16 March 2017 establishing a network code on capacity allocation mechanisms in gas transmission systems and repealing Regulation (EU) No 984/2013 (Text with EEA relevance)

 Help about what version

Pa Fersiwn

 Help about opening options

Dewisiadau Agor

 Help about UK-EU Regulation

Legislation originating from the EU

When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.

Close

Mae hon yn eitem o ddeddfwriaeth sy’n deillio o’r UE

Mae unrhyw newidiadau sydd wedi cael eu gwneud yn barod gan y tîm yn ymddangos yn y cynnwys a chyfeirir atynt gydag anodiadau.Ar ôl y diwrnod ymadael bydd tair fersiwn o’r ddeddfwriaeth yma i’w gwirio at ddibenion gwahanol. Y fersiwn legislation.gov.uk yw’r fersiwn sy’n weithredol yn y Deyrnas Unedig. Y Fersiwn UE sydd ar EUR-lex ar hyn o bryd yw’r fersiwn sy’n weithredol yn yr UE h.y. efallai y bydd arnoch angen y fersiwn hon os byddwch yn gweithredu busnes yn yr UE. EUR-Lex Y fersiwn yn yr archif ar y we yw’r fersiwn swyddogol o’r ddeddfwriaeth fel yr oedd ar y diwrnod ymadael cyn cael ei chyhoeddi ar legislation.gov.uk ac unrhyw newidiadau ac effeithiau a weithredwyd yn y Deyrnas Unedig wedyn. Mae’r archif ar y we hefyd yn cynnwys cyfraith achos a ffurfiau mewn ieithoedd eraill o EUR-Lex. The EU Exit Web Archive legislation_originated_from_EU_p3

Status:

EU_status_warning_original_version
This legislation may since have been updated - see the latest available (revised) version

Article 8Allocation methodology

1.Auctions shall be used for the allocation of capacity at interconnection points, except where the alternative allocation methodology pursuant to Article 30 is applied.

2.At all interconnection points the same auction design shall apply. The relevant auction processes shall start simultaneously for all concerned interconnection points. Each auction process, relating to a single standard capacity product, shall allocate capacity independently of every other auction process except where incremental capacity is offered or where, subject to the agreement of the directly involved transmission system operators and the approval of relevant national regulatory authorities, competing capacity is allocated. The national regulatory authority of any adjacent and affected Member State may provide a position which shall be considered by the relevant national regulatory authority. In case incremental capacity is offered, the independent allocation shall not apply to the simultaneous auction processes for the respective offer levels, since these are dependent on each other, as only one offer level can be allocated.

3.The standard capacity products shall follow a logical order by which products covering yearly capacity shall be offered first, followed by the product with the next shortest duration for use during the same period. The timing of the auctions provided for in Articles 11 to 15 shall be consistent with this principle.

4.The rules on standard capacity products as set out in Article 9 and auctions as set out in Articles 11 to 15 shall apply to bundled capacity and unbundled capacity at an interconnection point.

5.For a given auction, the availability of the relevant standard capacity products shall be communicated in accordance with Articles 11 to 15 and according to the auction calendar.

6.An amount at least equal to 20 % of the existing technical capacity at each interconnection point shall be set aside and offered in accordance with paragraph 7. If the available capacity is less than the proportion of technical capacity to be set aside, the whole of any available capacity shall be set aside. This capacity shall be offered in accordance with point (b) of paragraph 7, while any remaining capacity set aside shall be offered in accordance with point (a) of paragraph 7.

7.Any capacity set aside pursuant to paragraph 6 shall be offered, subject to the following provisions:

(a)an amount at least equal to 10 % of the existing technical capacity at each interconnection point shall be offered no earlier than in the annual yearly capacity auction as provided for in Article 11 held in accordance with the auction calendar during the fifth gas year preceding the start of the relevant gas year; and

(b)a further amount at least equal to 10 % of the existing technical capacity at each interconnection point shall first be offered no earlier than the annual quarterly capacity auction as provided for in Article 12, held in accordance with the auction calendar during the gas year preceding the start of the relevant gas year.

8.In the case of incremental capacity, an amount at least equal to 10 % of the incremental technical capacity at the concerned interconnection point shall be set aside and offered no earlier than the annual quarterly capacity auction as provided for in Article 12, held in accordance with the auction calendar during the gas year preceding the start of the relevant gas year.

9.The exact proportion of capacity to be set aside pursuant to paragraphs 6 and 8 shall be subject to a stakeholder consultation, alignment between transmission system operators and approval by national regulatory authorities at each interconnection point. National regulatory authorities shall in particular consider setting aside higher shares of capacity with a shorter duration to avoid foreclosure of downstream supply markets.

10.Capacity created via non-market based procedures and for which the final investment decision has been taken without prior commitments from network users shall be offered and allocated as available standard capacity products as set out in this Regulation.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i mabwysiadwyd gan yr UE): Mae'r wreiddiol version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel adopted version that was used for the EU Official Journal
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel adopted fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill